Skip to content

Kementerian Perumahan dan Kerajaan Tempatan

A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2022, by programme and activity, from the audited Statement of Operating Expenditure.

The same code is printed as Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan in 2016–2017.

All operating votes in 2022 · Development vote P.43 · B.43 in Budget 2027

Original budgetAsal
RM 1.77 bn
RM 1,767,450,800.00
Revised budgetJumlah
RM 1.76 bn
RM 1,764,325,610.00
SpentSebenar
RM 1.76 bn
RM 1,764,119,741.36
100.0% of the revised budget
UnspentVarian
RM 205,868.64
Totals as printed, JANM 2022, p. 162

By programme

Each programme's totals as the statement prints them. Open an activity below for every line to the sen.

CodeKodProgrammeProgramOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
010000PengurusanRM 100,647,300.00RM 112,900,340.00RM 112,838,064.55
99.9%
RM 62,275.45JANM 2022, p. 160
020000Persekitaran Bandar MampanRM 233,391,400.00RM 207,598,250.00RM 207,490,866.98
100.0%
RM 107,383.02JANM 2022, p. 160
030000Komuniti Bandar MampanRM 998,261,100.00RM 1,009,159,600.00RM 1,009,127,046.44
100.0%
RM 32,553.56JANM 2022, p. 161
040000Program KhususRM 434,986,200.00RM 434,502,620.00RM 434,499,463.39
100.0%
RM 3,156.61JANM 2022, p. 162
050000"one-off"RM 164,800.00RM 164,800.00RM 164,300.00
99.7%
RM 500.00JANM 2022, p. 162

Every activity, line by line

Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.

010000Pengurusan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
010100Pengurusan AmRevised RM 103,739,710.00Spent RM 103,710,419.24
100.0%

Activity total as printed: revised RM 103,739,710.00, spent RM 103,710,419.24 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 52,913,200.00RM 57,254,740.00RM 57,254,737.15
100.0%
RM 2.85JANM 2022, p. 160
20000Supplies and ServicesPerkhidmatan dan BekalanRM 34,899,100.00RM 39,231,615.00RM 39,231,600.00
100.0%
RM 15.00JANM 2022, p. 160
30000AssetsAsetRM 1,702,000.00RM 1,460,270.00RM 1,450,237.91
99.3%
RM 10,032.09JANM 2022, p. 160
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 1,669,500.00RM 5,792,085.00RM 5,773,844.18
99.7%
RM 18,240.82JANM 2022, p. 160
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 1,000.00RM 1,000.00RM 0.00
0.0%
RM 1,000.00JANM 2022, p. 160
010200Institut Latihan Perumahan dan Kerajaan Tempatan (I-KPKT)Revised RM 9,160,630.00Spent RM 9,127,645.31
99.6%

Activity total as printed: revised RM 9,160,630.00, spent RM 9,127,645.31 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 1,616,800.00RM 1,796,430.00RM 1,777,394.30
98.9%
RM 19,035.70JANM 2022, p. 160
20000Supplies and ServicesPerkhidmatan dan BekalanRM 7,569,900.00RM 7,338,400.00RM 7,324,889.46
99.8%
RM 13,510.54JANM 2022, p. 160
30000AssetsAsetRM 275,800.00RM 25,800.00RM 25,361.55
98.3%
RM 438.45JANM 2022, p. 160

020000Persekitaran Bandar Mampan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
020100Kerajaan TempatanRevised RM 58,389,030.00Spent RM 58,386,195.26
100.0%

Activity total as printed: revised RM 58,389,030.00, spent RM 58,386,195.26 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 28,054,400.00RM 24,364,330.00RM 24,364,293.11
100.0%
RM 36.89JANM 2022, p. 160
20000Supplies and ServicesPerkhidmatan dan BekalanRM 6,672,800.00RM 11,881,800.00RM 11,881,789.89
100.0%
RM 10.11JANM 2022, p. 160
30000AssetsAsetRM 1,210,000.00RM 1,563,200.00RM 1,561,894.10
99.9%
RM 1,305.90JANM 2022, p. 160
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 20,588,000.00RM 20,579,700.00RM 20,578,218.16
100.0%
RM 1,481.84JANM 2022, p. 160
020200Pengurusan Sisa Pepejal NegaraRevised RM 16,094,360.00Spent RM 16,093,240.04
100.0%

Activity total as printed: revised RM 16,094,360.00, spent RM 16,093,240.04 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 5,911,300.00RM 5,918,548.00RM 5,918,538.62
100.0%
RM 9.38JANM 2022, p. 160
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,107,000.00RM 10,165,032.00RM 10,164,979.92
100.0%
RM 52.08JANM 2022, p. 160
30000AssetsAsetRM 12,000.00RM 9,780.00RM 9,721.50
99.4%
RM 58.50JANM 2022, p. 160
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 1,000.00RM 1,000.00RM 0.00
0.0%
RM 1,000.00JANM 2022, p. 160
020300Perbadanan Pengurusan Sisa Pepejal dan Pembersihan Awam (SWCorp)Revised RM 61,500,000.00Spent RM 61,500,000.00
100.0%

Activity total as printed: revised RM 61,500,000.00, spent RM 61,500,000.00 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 82,000,000.00RM 61,500,000.00RM 61,500,000.00
100.0%
RM 0.00JANM 2022, p. 160
020400Perancangan Bandar dan Desa (PLANMalaysia)Revised RM 54,604,720.00Spent RM 54,599,791.49
100.0%

Activity total as printed: revised RM 54,604,720.00, spent RM 54,599,791.49 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 41,810,400.00RM 40,184,400.00RM 40,184,393.28
100.0%
RM 6.72JANM 2022, p. 160
20000Supplies and ServicesPerkhidmatan dan BekalanRM 15,394,600.00RM 13,537,200.00RM 13,537,160.57
100.0%
RM 39.43JANM 2022, p. 160
30000AssetsAsetRM 916,000.00RM 848,120.00RM 846,754.52
99.8%
RM 1,365.48JANM 2022, p. 160
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 24,000.00RM 35,000.00RM 31,483.12
90.0%
RM 3,516.88JANM 2022, p. 160
020500Bahagian Kampung BaruRevised RM 0.00Spent RM 0.00
0.0%

Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 2,202,300.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2022, p. 160
20000Supplies and ServicesPerkhidmatan dan BekalanRM 753,700.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2022, p. 160
30000AssetsAsetRM 100.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2022, p. 160
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 9,063,300.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2022, p. 160
020600Landskap NegaraRevised RM 17,010,140.00Spent RM 16,911,640.19
99.4%

Activity total as printed: revised RM 17,010,140.00, spent RM 16,911,640.19 (JANM 2022, p. 160).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 10,331,000.00RM 10,501,000.00RM 10,500,812.97
100.0%
RM 187.03JANM 2022, p. 160
20000Supplies and ServicesPerkhidmatan dan BekalanRM 6,297,700.00RM 5,635,840.00RM 5,635,781.18
100.0%
RM 58.82JANM 2022, p. 160
30000AssetsAsetRM 761,800.00RM 552,800.00RM 467,566.04
84.6%
RM 85,233.96JANM 2022, p. 160
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 280,000.00RM 320,500.00RM 307,480.00
95.9%
RM 13,020.00JANM 2022, p. 160

030000Komuniti Bandar Mampan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
030100Bomba dan PenyelamatRevised RM 952,247,170.00Spent RM 952,229,948.29
100.0%

Activity total as printed: revised RM 952,247,170.00, spent RM 952,229,948.29 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 668,831,400.00RM 688,621,240.00RM 688,621,234.19
100.0%
RM 5.81JANM 2022, p. 161
20000Supplies and ServicesPerkhidmatan dan BekalanRM 260,240,900.00RM 259,581,590.00RM 259,573,383.81
100.0%
RM 8,206.19JANM 2022, p. 161
30000AssetsAsetRM 200,000.00RM 2,349,940.00RM 2,343,945.41
99.7%
RM 5,994.59JANM 2022, p. 161
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 1,694,400.00RM 1,694,400.00RM 1,691,384.88
99.8%
RM 3,015.12JANM 2022, p. 161
030200Perumahan NegaraRevised RM 34,989,930.00Spent RM 34,986,300.40
100.0%

Activity total as printed: revised RM 34,989,930.00, spent RM 34,986,300.40 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 24,826,600.00RM 21,239,500.00RM 21,239,445.49
100.0%
RM 54.51JANM 2022, p. 161
20000Supplies and ServicesPerkhidmatan dan BekalanRM 12,655,600.00RM 8,446,575.00RM 8,446,558.16
100.0%
RM 16.84JANM 2022, p. 161
30000AssetsAsetRM 327,100.00RM 110,055.00RM 107,054.79
97.3%
RM 3,000.21JANM 2022, p. 161
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 5,475,100.00RM 5,192,600.00RM 5,192,571.96
100.0%
RM 28.04JANM 2022, p. 161
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 1,200.00RM 1,200.00RM 670.00
55.8%
RM 530.00JANM 2022, p. 161
030300Bahagian Kawalan Kredit KomunitiRevised RM 4,981,690.00Spent RM 4,971,783.30
99.8%

Activity total as printed: revised RM 4,981,690.00, spent RM 4,971,783.30 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 4,571,200.00RM 4,331,800.00RM 4,331,772.85
100.0%
RM 27.15JANM 2022, p. 161
20000Supplies and ServicesPerkhidmatan dan BekalanRM 486,800.00RM 649,890.00RM 640,010.45
98.5%
RM 9,879.55JANM 2022, p. 161
030400Tribunal Perumahan dan Pengurusan StrataRevised RM 8,639,950.00Spent RM 8,639,783.09
100.0%

Activity total as printed: revised RM 8,639,950.00, spent RM 8,639,783.09 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 5,821,900.00RM 6,100,430.00RM 6,100,360.38
100.0%
RM 69.62JANM 2022, p. 161
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,574,000.00RM 2,539,520.00RM 2,539,422.71
100.0%
RM 97.29JANM 2022, p. 161
030600Kesejahteraan KomunitiRevised RM 8,300,860.00Spent RM 8,299,231.36
100.0%

Activity total as printed: revised RM 8,300,860.00, spent RM 8,299,231.36 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,179,900.00RM 6,365,700.00RM 6,365,647.31
100.0%
RM 52.69JANM 2022, p. 161
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,157,200.00RM 1,160,780.00RM 1,160,736.45
100.0%
RM 43.55JANM 2022, p. 161
30000AssetsAsetRM 217,800.00RM 40,380.00RM 40,280.00
99.8%
RM 100.00JANM 2022, p. 161
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 1,000,000.00RM 734,000.00RM 732,567.60
99.8%
RM 1,432.40JANM 2022, p. 161

040000Program Khusus

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
040100Bertugas ke Luar NegaraRevised RM 1,036,600.00Spent RM 1,036,500.42
100.0%

Activity total as printed: revised RM 1,036,600.00, spent RM 1,036,500.42 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,250,000.00RM 1,036,600.00RM 1,036,500.42
100.0%
RM 99.58JANM 2022, p. 161
040200Emolumen Kakitangan KontrakRevised RM 1,744,230.00Spent RM 1,741,486.43
99.8%

Activity total as printed: revised RM 1,744,230.00, spent RM 1,741,486.43 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 3,648,300.00RM 1,735,430.00RM 1,735,395.74
100.0%
RM 34.26JANM 2022, p. 161
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 8,800.00RM 8,800.00RM 6,090.69
69.2%
RM 2,709.31JANM 2022, p. 161
040300Sumbangan Membantu Kadar (SMK)Revised RM 371,331,090.00Spent RM 371,331,064.97
100.0%

Activity total as printed: revised RM 371,331,090.00, spent RM 371,331,064.97 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 352,000,000.00RM 371,331,090.00RM 371,331,064.97
100.0%
RM 25.03JANM 2022, p. 161
040400Sewaan CCTVRevised RM 5,350,500.00Spent RM 5,350,427.06
100.0%

Activity total as printed: revised RM 5,350,500.00, spent RM 5,350,427.06 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 12,195,100.00RM 5,350,500.00RM 5,350,427.06
100.0%
RM 72.94JANM 2022, p. 161
040500Elaun Pegawai Bomba Bantuan (PBB)Revised RM 46,643,540.00Spent RM 46,643,379.00
100.0%

Activity total as printed: revised RM 46,643,540.00, spent RM 46,643,379.00 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 50,134,000.00RM 46,643,540.00RM 46,643,379.00
100.0%
RM 161.00JANM 2022, p. 161
040600Penyelenggaraan LandskapRevised RM 720,200.00Spent RM 720,197.50
100.0%

Activity total as printed: revised RM 720,200.00, spent RM 720,197.50 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 1,500,000.00RM 720,200.00RM 720,197.50
100.0%
RM 2.50JANM 2022, p. 161
040800Program Kebersihan Negara (SWCorp)Revised RM 1,150,000.00Spent RM 1,150,000.00
100.0%

Activity total as printed: revised RM 1,150,000.00, spent RM 1,150,000.00 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 1,250,000.00RM 1,150,000.00RM 1,150,000.00
100.0%
RM 0.00JANM 2022, p. 161
041000Promosi Penggalakan Pelaburan dan PerdaganganRevised RM 1,561,260.00Spent RM 1,561,208.01
100.0%

Activity total as printed: revised RM 1,561,260.00, spent RM 1,561,208.01 (JANM 2022, p. 161).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 3,000,000.00RM 1,061,260.00RM 1,061,208.01
100.0%
RM 51.99JANM 2022, p. 161
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 0.00RM 500,000.00RM 500,000.00
100.0%
RM 0.00JANM 2022, p. 161
041100Bantuan Sisa Pepejal Pihak Berkuasa Tempatan (SWCorp)Revised RM 4,965,200.00Spent RM 4,965,200.00
100.0%

Activity total as printed: revised RM 4,965,200.00, spent RM 4,965,200.00 (JANM 2022, p. 162).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 10,000,000.00RM 4,965,200.00RM 4,965,200.00
100.0%
RM 0.00JANM 2022, p. 162

050000"one-off"

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
050100Perkhidmatan Analisis Data DroneRevised RM 164,800.00Spent RM 164,300.00
99.7%

Activity total as printed: revised RM 164,800.00, spent RM 164,300.00 (JANM 2022, p. 162).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 164,800.00RM 164,800.00RM 164,300.00
99.7%
RM 500.00JANM 2022, p. 162

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2022, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.