Kementerian Kemajuan Desa dan Wilayah
A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2024, by programme and activity, from the audited Statement of Operating Expenditure.
The same code is printed as Kementerian Kemajuan Luar Bandar dan Wilayah in 2016–2017 and Kementerian Pembangunan Luar Bandar in 2018–2022.
All operating votes in 2024 · Development vote P.22 · B.22 in Budget 2027
By programme
Each programme's totals as the statement prints them. Open an activity below for every line to the sen.
| CodeKod | ProgrammeProgram | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 010000 | Pengurusan | RM 93,541,400.00 | RM 106,459,300.00 | RM 104,682,561.22 | 98.3% | RM 1,776,738.78 | JANM 2024, p. 131 |
| 020000 | Pembangunan Infrastruktur dan Kemudahan Asas | RM 169,953,100.00 | RM 163,507,900.00 | RM 162,688,533.73 | 99.5% | RM 819,366.27 | JANM 2024, p. 131 |
| 030000 | Pengupayaan Ekonomi Luar Bandar | RM 1,723,693,200.00 | RM 1,671,678,000.00 | RM 1,669,694,779.30 | 99.9% | RM 1,983,220.70 | JANM 2024, p. 132 |
| 040000 | Pembangunan Modal Insan dan Pendidikan | RM 145,822,500.00 | RM 148,711,460.00 | RM 147,843,021.78 | 99.4% | RM 868,438.22 | JANM 2024, p. 132 |
| 050000 | Program Khusus | RM 1,980,403,400.00 | RM 1,833,354,940.00 | RM 1,828,941,890.55 | 99.8% | RM 4,413,049.45 | JANM 2024, p. 133 |
| 060000 | “one-off” | RM 2,000,000.00 | RM 2,000,000.00 | RM 1,691,173.40 | 84.6% | RM 308,826.60 | JANM 2024, p. 133 |
Every activity, line by line
Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.
010000Pengurusan
010100Pentadbiran dan Pengurusan AsetRevised RM 67,469,500.00Spent RM 66,260,907.4098.2%
Activity total as printed: revised RM 67,469,500.00, spent RM 66,260,907.40 (JANM 2024, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 24,036,500.00 | RM 27,401,300.00 | RM 27,401,284.83 | 100.0% | RM 15.17 | JANM 2024, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 39,521,200.00 | RM 38,470,500.00 | RM 37,331,498.29 | 97.0% | RM 1,139,001.71 | JANM 2024, p. 130 |
| 30000 | AssetsAset | RM 1,152,700.00 | RM 1,597,700.00 | RM 1,528,124.28 | 95.7% | RM 69,575.72 | JANM 2024, p. 130 |
010200Pengurusan Sumber ManusiaRevised RM 5,798,900.00Spent RM 5,779,300.0899.7%
Activity total as printed: revised RM 5,798,900.00, spent RM 5,779,300.08 (JANM 2024, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,925,400.00 | RM 3,031,600.00 | RM 3,031,560.17 | 100.0% | RM 39.83 | JANM 2024, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,638,300.00 | RM 2,538,300.00 | RM 2,525,760.25 | 99.5% | RM 12,539.75 | JANM 2024, p. 130 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 229,000.00 | RM 229,000.00 | RM 221,979.66 | 96.9% | RM 7,020.34 | JANM 2024, p. 130 |
010300Kewangan dan AkaunRevised RM 12,534,800.00Spent RM 12,264,887.2597.8%
Activity total as printed: revised RM 12,534,800.00, spent RM 12,264,887.25 (JANM 2024, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,073,600.00 | RM 4,073,600.00 | RM 3,873,332.15 | 95.1% | RM 200,267.85 | JANM 2024, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 921,400.00 | RM 749,700.00 | RM 684,591.85 | 91.3% | RM 65,108.15 | JANM 2024, p. 130 |
| 30000 | AssetsAset | RM 50,000.00 | RM 22,000.00 | RM 20,363.40 | 92.6% | RM 1,636.60 | JANM 2024, p. 130 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 530,000.00 | RM 7,686,500.00 | RM 7,686,374.85 | 100.0% | RM 125.15 | JANM 2024, p. 130 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 3,000.00 | RM 3,000.00 | RM 225.00 | 7.5% | RM 2,775.00 | JANM 2024, p. 130 |
010400Pengurusan MaklumatRevised RM 7,734,000.00Spent RM 7,599,505.0298.3%
Activity total as printed: revised RM 7,734,000.00, spent RM 7,599,505.02 (JANM 2024, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,065,300.00 | RM 3,065,300.00 | RM 2,933,644.34 | 95.7% | RM 131,655.66 | JANM 2024, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,497,100.00 | RM 3,631,100.00 | RM 3,628,418.82 | 99.9% | RM 2,681.18 | JANM 2024, p. 130 |
| 30000 | AssetsAset | RM 1,037,600.00 | RM 1,037,600.00 | RM 1,037,441.86 | 100.0% | RM 158.14 | JANM 2024, p. 130 |
010500PerolehanRevised RM 1,820,500.00Spent RM 1,798,678.6298.8%
Activity total as printed: revised RM 1,820,500.00, spent RM 1,798,678.62 (JANM 2024, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,440,800.00 | RM 1,633,300.00 | RM 1,633,244.35 | 100.0% | RM 55.65 | JANM 2024, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 197,200.00 | RM 187,200.00 | RM 165,434.27 | 88.4% | RM 21,765.73 | JANM 2024, p. 130 |
010600Perancangan StrategikRevised RM 4,415,300.00Spent RM 4,368,711.0698.9%
Activity total as printed: revised RM 4,415,300.00, spent RM 4,368,711.06 (JANM 2024, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,767,400.00 | RM 2,878,400.00 | RM 2,878,314.61 | 100.0% | RM 85.39 | JANM 2024, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 697,900.00 | RM 854,900.00 | RM 824,917.67 | 96.5% | RM 29,982.33 | JANM 2024, p. 130 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 682,000.00 | RM 682,000.00 | RM 665,478.78 | 97.6% | RM 16,521.22 | JANM 2024, p. 130 |
010700Korporat dan Pembangunan KemahiranRevised RM 6,686,300.00Spent RM 6,610,571.7998.9%
Activity total as printed: revised RM 6,686,300.00, spent RM 6,610,571.79 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,286,000.00 | RM 1,447,300.00 | RM 1,447,227.37 | 100.0% | RM 72.63 | JANM 2024, p. 131 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,089,000.00 | RM 390,100.00 | RM 314,444.42 | 80.6% | RM 75,655.58 | JANM 2024, p. 131 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,700,000.00 | RM 4,848,900.00 | RM 4,848,900.00 | 100.0% | RM 0.00 | JANM 2024, p. 131 |
020000Pembangunan Infrastruktur dan Kemudahan Asas
020100PrasaranaRevised RM 4,123,000.00Spent RM 4,108,560.8299.7%
Activity total as printed: revised RM 4,123,000.00, spent RM 4,108,560.82 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,892,700.00 | RM 3,126,900.00 | RM 3,126,845.13 | 100.0% | RM 54.87 | JANM 2024, p. 131 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 896,100.00 | RM 996,100.00 | RM 981,715.69 | 98.6% | RM 14,384.31 | JANM 2024, p. 131 |
020200TeknikalRevised RM 3,426,800.00Spent RM 3,405,528.6299.4%
Activity total as printed: revised RM 3,426,800.00, spent RM 3,405,528.62 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,876,200.00 | RM 2,876,200.00 | RM 2,859,203.32 | 99.4% | RM 16,996.68 | JANM 2024, p. 131 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 550,600.00 | RM 550,600.00 | RM 546,325.30 | 99.2% | RM 4,274.70 | JANM 2024, p. 131 |
020300Penyelarasan dan PemantauanRevised RM 2,965,100.00Spent RM 2,834,457.9995.6%
Activity total as printed: revised RM 2,965,100.00, spent RM 2,834,457.99 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,337,800.00 | RM 2,337,800.00 | RM 2,220,439.94 | 95.0% | RM 117,360.06 | JANM 2024, p. 131 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 958,200.00 | RM 627,300.00 | RM 614,018.05 | 97.9% | RM 13,281.95 | JANM 2024, p. 131 |
020400Kemajuan Tanah dan WilayahRevised RM 9,268,900.00Spent RM 8,616,019.3093.0%
Activity total as printed: revised RM 9,268,900.00, spent RM 8,616,019.30 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,794,000.00 | RM 1,794,000.00 | RM 1,707,350.46 | 95.2% | RM 86,649.54 | JANM 2024, p. 131 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 7,836,300.00 | RM 5,663,700.00 | RM 5,097,468.84 | 90.0% | RM 566,231.16 | JANM 2024, p. 131 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,811,200.00 | RM 1,811,200.00 | RM 1,811,200.00 | 100.0% | RM 0.00 | JANM 2024, p. 131 |
020500Lembaga Kemajuan Johor Tenggara (KEJORA)Revised RM 27,000,000.00Spent RM 27,000,000.00100.0%
Activity total as printed: revised RM 27,000,000.00, spent RM 27,000,000.00 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 27,000,000.00 | RM 27,000,000.00 | RM 27,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 131 |
020600Lembaga Kemajuan Kelantan Selatan (KESEDAR)Revised RM 28,641,900.00Spent RM 28,641,844.00100.0%
Activity total as printed: revised RM 28,641,900.00, spent RM 28,641,844.00 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 32,000,000.00 | RM 28,641,900.00 | RM 28,641,844.00 | 100.0% | RM 56.00 | JANM 2024, p. 131 |
020700Lembaga Kemajuan Terengganu Tengah (KETENGAH)Revised RM 33,500,000.00Spent RM 33,500,000.00100.0%
Activity total as printed: revised RM 33,500,000.00, spent RM 33,500,000.00 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 33,500,000.00 | RM 33,500,000.00 | RM 33,500,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 131 |
020800Lembaga Kemajuan Wilayah Kedah (KEDA)Revised RM 31,582,200.00Spent RM 31,582,123.00100.0%
Activity total as printed: revised RM 31,582,200.00, spent RM 31,582,123.00 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 32,500,000.00 | RM 31,582,200.00 | RM 31,582,123.00 | 100.0% | RM 77.00 | JANM 2024, p. 131 |
020900Lembaga Kemajuan Wilayah Pulau Pinang (PERDA)Revised RM 23,000,000.00Spent RM 23,000,000.00100.0%
Activity total as printed: revised RM 23,000,000.00, spent RM 23,000,000.00 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 23,000,000.00 | RM 23,000,000.00 | RM 23,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 131 |
030000Pengupayaan Ekonomi Luar Bandar
030100Pembangunan Usahawan DesaRevised RM 2,351,600.00Spent RM 2,198,673.1193.5%
Activity total as printed: revised RM 2,351,600.00, spent RM 2,198,673.11 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,599,600.00 | RM 1,758,100.00 | RM 1,758,085.50 | 100.0% | RM 14.50 | JANM 2024, p. 131 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 679,400.00 | RM 593,500.00 | RM 440,587.61 | 74.2% | RM 152,912.39 | JANM 2024, p. 131 |
030200Kesejahteraan RakyatRevised RM 2,671,600.00Spent RM 2,656,074.5099.4%
Activity total as printed: revised RM 2,671,600.00, spent RM 2,656,074.50 (JANM 2024, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,992,100.00 | RM 2,288,600.00 | RM 2,288,570.08 | 100.0% | RM 29.92 | JANM 2024, p. 131 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 283,000.00 | RM 383,000.00 | RM 367,504.42 | 96.0% | RM 15,495.58 | JANM 2024, p. 131 |
030300Jabatan Kemajuan Orang Asli (JAKOA)Revised RM 69,535,500.00Spent RM 67,720,731.6997.4%
Activity total as printed: revised RM 69,535,500.00, spent RM 67,720,731.69 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 40,978,600.00 | RM 40,978,600.00 | RM 40,341,405.03 | 98.5% | RM 637,194.97 | JANM 2024, p. 132 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 35,436,600.00 | RM 28,069,900.00 | RM 26,947,036.66 | 96.0% | RM 1,122,863.34 | JANM 2024, p. 132 |
| 30000 | AssetsAset | RM 467,300.00 | RM 467,300.00 | RM 413,240.00 | 88.4% | RM 54,060.00 | JANM 2024, p. 132 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 18,000.00 | RM 18,000.00 | RM 17,400.00 | 96.7% | RM 600.00 | JANM 2024, p. 132 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 0.00 | RM 1,700.00 | RM 1,650.00 | 97.1% | RM 50.00 | JANM 2024, p. 132 |
030400Majlis Amanah Rakyat (MARA)Revised RM 1,447,119,300.00Spent RM 1,447,119,300.00100.0%
Activity total as printed: revised RM 1,447,119,300.00, spent RM 1,447,119,300.00 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,442,238,600.00 | RM 1,447,119,300.00 | RM 1,447,119,300.00 | 100.0% | RM 0.00 | JANM 2024, p. 132 |
030500Pihak Berkuasa Kemajuan Pekebun Kecil Perusahaan Getah (RISDA)Revised RM 150,000,000.00Spent RM 150,000,000.00100.0%
Activity total as printed: revised RM 150,000,000.00, spent RM 150,000,000.00 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 200,000,000.00 | RM 150,000,000.00 | RM 150,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 132 |
040000Pembangunan Modal Insan dan Pendidikan
040100Komuniti DesaRevised RM 2,385,700.00Spent RM 2,115,346.1788.7%
Activity total as printed: revised RM 2,385,700.00, spent RM 2,115,346.17 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,162,700.00 | RM 1,162,700.00 | RM 977,832.30 | 84.1% | RM 184,867.70 | JANM 2024, p. 132 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,583,000.00 | RM 1,223,000.00 | RM 1,137,513.87 | 93.0% | RM 85,486.13 | JANM 2024, p. 132 |
040200Institut Kemajuan Desa (INFRA)Revised RM 15,993,800.00Spent RM 15,590,450.1697.5%
Activity total as printed: revised RM 15,993,800.00, spent RM 15,590,450.16 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,494,000.00 | RM 8,592,800.00 | RM 8,592,709.46 | 100.0% | RM 90.54 | JANM 2024, p. 132 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 8,179,000.00 | RM 6,968,100.00 | RM 6,570,975.28 | 94.3% | RM 397,124.72 | JANM 2024, p. 132 |
| 30000 | AssetsAset | RM 277,000.00 | RM 432,900.00 | RM 426,765.42 | 98.6% | RM 6,134.58 | JANM 2024, p. 132 |
040300Jabatan Kemajuan Masyarakat (KEMAS)Revised RM 130,331,960.00Spent RM 130,137,225.4599.8%
Activity total as printed: revised RM 130,331,960.00, spent RM 130,137,225.45 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 46,284,300.00 | RM 50,558,800.00 | RM 50,558,716.57 | 100.0% | RM 83.43 | JANM 2024, p. 132 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 76,894,500.00 | RM 76,575,160.00 | RM 76,575,150.67 | 100.0% | RM 9.33 | JANM 2024, p. 132 |
| 30000 | AssetsAset | RM 2,300,000.00 | RM 2,300,000.00 | RM 2,234,931.60 | 97.2% | RM 65,068.40 | JANM 2024, p. 132 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 648,000.00 | RM 898,000.00 | RM 768,426.61 | 85.6% | RM 129,573.39 | JANM 2024, p. 132 |
050000Program Khusus
050100Bertugas ke Luar NegaraRevised RM 2,511,000.00Spent RM 1,753,747.0869.8%
Activity total as printed: revised RM 2,511,000.00, spent RM 1,753,747.08 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,600,000.00 | RM 2,511,000.00 | RM 1,753,747.08 | 69.8% | RM 757,252.92 | JANM 2024, p. 132 |
050200Emolumen Kakitangan KontrakRevised RM 692,500,700.00Spent RM 691,885,372.3499.9%
Activity total as printed: revised RM 692,500,700.00, spent RM 691,885,372.34 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 665,807,900.00 | RM 691,711,500.00 | RM 691,711,435.93 | 100.0% | RM 64.07 | JANM 2024, p. 132 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 789,200.00 | RM 789,200.00 | RM 173,936.41 | 22.0% | RM 615,263.59 | JANM 2024, p. 132 |
050300Pusat Komuniti Desa (PKD)Revised RM 5,374,790.00Spent RM 4,999,651.5993.0%
Activity total as printed: revised RM 5,374,790.00, spent RM 4,999,651.59 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 4,687,000.00 | RM 4,266,770.00 | RM 3,999,317.09 | 93.7% | RM 267,452.91 | JANM 2024, p. 132 |
| 30000 | AssetsAset | RM 50,000.00 | RM 1,108,020.00 | RM 1,000,334.50 | 90.3% | RM 107,685.50 | JANM 2024, p. 132 |
050400Kos Operasi dan Penyelenggaraan Lampu Jalan KampungRevised RM 131,551,070.00Spent RM 131,484,319.67100.0%
Activity total as printed: revised RM 131,551,070.00, spent RM 131,484,319.67 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 117,127,200.00 | RM 131,551,070.00 | RM 131,484,319.67 | 100.0% | RM 66,750.33 | JANM 2024, p. 132 |
050500Kos Operasi Stesen Bekalan Elektrik AlternatifRevised RM 65,693,380.00Spent RM 65,693,370.08100.0%
Activity total as printed: revised RM 65,693,380.00, spent RM 65,693,370.08 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 38,000,000.00 | RM 65,693,380.00 | RM 65,693,370.08 | 100.0% | RM 9.92 | JANM 2024, p. 132 |
050600Elaun Jawatankuasa Pembangunan dan Keselamatan Kampung (JPKK)Revised RM 219,534,460.00Spent RM 219,534,458.00100.0%
Activity total as printed: revised RM 219,534,460.00, spent RM 219,534,458.00 (JANM 2024, p. 132).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 277,351,300.00 | RM 219,534,460.00 | RM 219,534,458.00 | 100.0% | RM 2.00 | JANM 2024, p. 132 |
050700Peningkatan Taraf Hidup Orang AsliRevised RM 92,992,700.00Spent RM 92,983,683.20100.0%
Activity total as printed: revised RM 92,992,700.00, spent RM 92,983,683.20 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 0.00 | RM 643,800.00 | RM 634,869.35 | 98.6% | RM 8,930.65 | JANM 2024, p. 133 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 97,998,100.00 | RM 92,348,900.00 | RM 92,348,813.85 | 100.0% | RM 86.15 | JANM 2024, p. 133 |
050800Penyelenggaraan dan Pembaikan Sistem Rawatan Air JAKOARevised RM 6,937,000.00Spent RM 5,842,616.1184.2%
Activity total as printed: revised RM 6,937,000.00, spent RM 5,842,616.11 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 8,000,000.00 | RM 6,937,000.00 | RM 5,842,616.11 | 84.2% | RM 1,094,383.89 | JANM 2024, p. 133 |
050900Bantuan Makanan Tambahan KEMASRevised RM 149,750,000.00Spent RM 149,703,866.01100.0%
Activity total as printed: revised RM 149,750,000.00, spent RM 149,703,866.01 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 140,000,000.00 | RM 149,750,000.00 | RM 149,703,866.01 | 100.0% | RM 46,133.99 | JANM 2024, p. 133 |
051000Emolumen Kakitangan KEMAS Lantikan TetapRevised RM 266,517,040.00Spent RM 266,515,889.60100.0%
Activity total as printed: revised RM 266,517,040.00, spent RM 266,515,889.60 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 293,564,700.00 | RM 266,388,640.00 | RM 266,388,600.58 | 100.0% | RM 39.42 | JANM 2024, p. 133 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 128,400.00 | RM 128,400.00 | RM 127,289.02 | 99.1% | RM 1,110.98 | JANM 2024, p. 133 |
051100Bantuan Geran Per Kapita KEMASRevised RM 34,900,000.00Spent RM 34,587,297.8699.1%
Activity total as printed: revised RM 34,900,000.00, spent RM 34,587,297.86 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,000,000.00 | RM 2,000,000.00 | RM 1,955,264.66 | 97.8% | RM 44,735.34 | JANM 2024, p. 133 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 27,000,000.00 | RM 32,900,000.00 | RM 32,632,033.20 | 99.2% | RM 267,966.80 | JANM 2024, p. 133 |
051200Penyelenggaraan dan Pembaikan Bangunan KEMASRevised RM 9,500,000.00Spent RM 9,482,555.5999.8%
Activity total as printed: revised RM 9,500,000.00, spent RM 9,482,555.59 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 9,500,000.00 | RM 9,500,000.00 | RM 9,482,555.59 | 99.8% | RM 17,444.41 | JANM 2024, p. 133 |
051300Bantuan Sara Hidup Bekas Kakitangan Kontrak KEMASRevised RM 15,636,000.00Spent RM 14,519,823.0092.9%
Activity total as printed: revised RM 15,636,000.00, spent RM 14,519,823.00 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 15,636,000.00 | RM 15,636,000.00 | RM 14,519,823.00 | 92.9% | RM 1,116,177.00 | JANM 2024, p. 133 |
051400Peralatan dan Kelengkapan Tabika/Taska KEMASRevised RM 1,250,000.00Spent RM 1,248,440.4299.9%
Activity total as printed: revised RM 1,250,000.00, spent RM 1,248,440.42 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 30000 | AssetsAset | RM 1,250,000.00 | RM 1,250,000.00 | RM 1,248,440.42 | 99.9% | RM 1,559.58 | JANM 2024, p. 133 |
051500Insentif Galakan Tanam Semula KESEDARRevised RM 11,250,000.00Spent RM 11,250,000.00100.0%
Activity total as printed: revised RM 11,250,000.00, spent RM 11,250,000.00 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 15,000,000.00 | RM 11,250,000.00 | RM 11,250,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 133 |
051600Bantuan Musim TengkujuhRevised RM 127,456,800.00Spent RM 127,456,800.00100.0%
Activity total as printed: revised RM 127,456,800.00, spent RM 127,456,800.00 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 264,913,600.00 | RM 127,456,800.00 | RM 127,456,800.00 | 100.0% | RM 0.00 | JANM 2024, p. 133 |
060000“one-off”
060100Kenderaan dan JenteraRevised RM 2,000,000.00Spent RM 1,691,173.4084.6%
Activity total as printed: revised RM 2,000,000.00, spent RM 1,691,173.40 (JANM 2024, p. 133).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 30000 | AssetsAset | RM 2,000,000.00 | RM 2,000,000.00 | RM 1,691,173.40 | 84.6% | RM 308,826.60 | JANM 2024, p. 133 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2024, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.