Kementerian Pengangkutan
A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2024, by programme and activity, from the audited Statement of Operating Expenditure.
By programme
Each programme's totals as the statement prints them. Hover a figure for the exact amount, or open an activity below for every line to the sen.
| CodeKod | ProgrammeProgram | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 010000 | Pengurusan | RM 87.62 m | RM 118.37 m | RM 116.13 m | 98.1% | RM 2.24 m | JANM 2024, p. 148 |
| 020000 | Perkhidmatan Pengangkutan | RM 1.05 bn | RM 1.02 bn | RM 1.02 bn | 99.4% | RM 6.38 m | JANM 2024, p. 149 |
| 030000 | Program Khusus | RM 489.46 m | RM 488.19 m | RM 483.09 m | 99.0% | RM 5.10 m | JANM 2024, p. 150 |
| 040000 | "one-off" | RM 13.83 m | RM 13.20 m | RM 12.65 m | 95.9% | RM 545,976.87 | JANM 2024, p. 150 |
Every activity, line by line
Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.
010000Pengurusan
010100Pengurusan AmRevised RM 34.13 mSpent RM 32.93 m96.5%
Activity total as printed: revised RM 34,133,529.00, spent RM 32,933,506.62 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 12,817,600.00 | RM 12,817,600.00 | RM 12,780,524.01 | 99.7% | RM 37,075.99 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 21,969,100.00 | RM 20,100,739.00 | RM 18,943,978.62 | 94.3% | RM 1,156,760.38 | JANM 2024, p. 148 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,291,000.00 | RM 1,215,190.00 | RM 1,209,003.99 | 99.5% | RM 6,186.01 | JANM 2024, p. 148 |
010200MaritimRevised RM 6.77 mSpent RM 6.44 m95.1%
Activity total as printed: revised RM 6,768,341.00, spent RM 6,436,566.97 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,198,000.00 | RM 3,198,000.00 | RM 3,126,570.47 | 97.8% | RM 71,429.53 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,217,700.00 | RM 2,022,941.00 | RM 1,772,650.26 | 87.6% | RM 250,290.74 | JANM 2024, p. 148 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,500,000.00 | RM 1,520,000.00 | RM 1,513,687.25 | 99.6% | RM 6,312.75 | JANM 2024, p. 148 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 25,400.00 | RM 27,400.00 | RM 23,658.99 | 86.3% | RM 3,741.01 | JANM 2024, p. 148 |
010300UdaraRevised RM 31.88 mSpent RM 31.44 m98.6%
Activity total as printed: revised RM 31,880,428.00, spent RM 31,442,531.61 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,502,500.00 | RM 3,901,000.00 | RM 3,900,907.24 | 100.0% | RM 92.76 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,761,000.00 | RM 2,447,950.00 | RM 2,274,772.12 | 92.9% | RM 173,177.88 | JANM 2024, p. 148 |
| 30000 | AssetsAset | RM 188,800.00 | RM 380,800.00 | RM 379,358.46 | 99.6% | RM 1,441.54 | JANM 2024, p. 148 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 2,125,600.00 | RM 25,150,678.00 | RM 24,887,493.79 | 99.0% | RM 263,184.21 | JANM 2024, p. 148 |
010400DaratRevised RM 13.55 mSpent RM 13.53 m99.9%
Activity total as printed: revised RM 13,549,600.00, spent RM 13,532,284.57 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,474,300.00 | RM 1,813,700.00 | RM 1,813,620.87 | 100.0% | RM 79.13 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 425,900.00 | RM 425,900.00 | RM 410,300.70 | 96.3% | RM 15,599.30 | JANM 2024, p. 148 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 5,000,000.00 | RM 11,310,000.00 | RM 11,308,363.00 | 100.0% | RM 1,637.00 | JANM 2024, p. 148 |
010500Perancangan Strategik dan AntarabangsaRevised RM 5.59 mSpent RM 5.55 m99.2%
Activity total as printed: revised RM 5,592,980.00, spent RM 5,547,897.15 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,603,300.00 | RM 4,681,900.00 | RM 4,681,890.77 | 100.0% | RM 9.23 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 916,700.00 | RM 911,080.00 | RM 866,006.38 | 95.0% | RM 45,073.62 | JANM 2024, p. 148 |
010600Pengurusan Sumber ManusiaRevised RM 3.06 mSpent RM 3.04 m99.4%
Activity total as printed: revised RM 3,057,100.00, spent RM 3,037,787.73 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,441,600.00 | RM 2,520,000.00 | RM 2,519,972.20 | 100.0% | RM 27.80 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 498,300.00 | RM 517,100.00 | RM 498,444.10 | 96.4% | RM 18,655.90 | JANM 2024, p. 148 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 38,800.00 | RM 20,000.00 | RM 19,371.43 | 96.9% | RM 628.57 | JANM 2024, p. 148 |
010700Pengurusan MaklumatRevised RM 4.51 mSpent RM 4.36 m96.8%
Activity total as printed: revised RM 4,507,900.00, spent RM 4,364,183.45 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 917,100.00 | RM 917,100.00 | RM 901,146.68 | 98.3% | RM 15,953.32 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,890,800.00 | RM 2,890,800.00 | RM 2,817,714.57 | 97.5% | RM 73,085.43 | JANM 2024, p. 148 |
| 30000 | AssetsAset | RM 700,000.00 | RM 700,000.00 | RM 645,322.20 | 92.2% | RM 54,677.80 | JANM 2024, p. 148 |
010800AkaunRevised RM 4.98 mSpent RM 4.97 m99.7%
Activity total as printed: revised RM 4,979,800.00, spent RM 4,965,156.20 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,112,100.00 | RM 4,374,700.00 | RM 4,373,850.89 | 100.0% | RM 849.11 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 585,100.00 | RM 585,100.00 | RM 571,319.01 | 97.6% | RM 13,780.99 | JANM 2024, p. 148 |
| 30000 | AssetsAset | RM 20,000.00 | RM 20,000.00 | RM 19,986.30 | 99.9% | RM 13.70 | JANM 2024, p. 148 |
010900PembangunanRevised RM 13.90 mSpent RM 13.87 m99.8%
Activity total as printed: revised RM 13,899,818.00, spent RM 13,867,736.77 (JANM 2024, p. 148).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,320,200.00 | RM 4,591,200.00 | RM 4,591,110.72 | 100.0% | RM 89.28 | JANM 2024, p. 148 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 7,076,800.00 | RM 8,530,894.00 | RM 8,498,902.05 | 99.6% | RM 31,991.95 | JANM 2024, p. 148 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 0.00 | RM 777,724.00 | RM 777,724.00 | 100.0% | RM 0.00 | JANM 2024, p. 148 |
020000Perkhidmatan Pengangkutan
020100Agensi Pengangkutan Awam Darat (APAD)Revised RM 13.17 mSpent RM 12.82 m97.4%
Activity total as printed: revised RM 13,171,200.00, spent RM 12,823,872.01 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 5,346,700.00 | RM 5,346,700.00 | RM 5,039,198.76 | 94.3% | RM 307,501.24 | JANM 2024, p. 149 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 6,975,900.00 | RM 6,777,600.00 | RM 6,741,998.21 | 99.5% | RM 35,601.79 | JANM 2024, p. 149 |
| 30000 | AssetsAset | RM 1,043,900.00 | RM 1,043,900.00 | RM 1,039,675.04 | 99.6% | RM 4,224.96 | JANM 2024, p. 149 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,000.00 | RM 3,000.00 | RM 3,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 149 |
020200Pengangkutan LautRevised RM 157.24 mSpent RM 154.49 m98.3%
Activity total as printed: revised RM 157,244,000.00, spent RM 154,489,371.39 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 85,192,900.00 | RM 85,192,900.00 | RM 83,668,196.62 | 98.2% | RM 1,524,703.38 | JANM 2024, p. 149 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 70,526,000.00 | RM 71,586,000.00 | RM 70,419,475.99 | 98.4% | RM 1,166,524.01 | JANM 2024, p. 149 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 745,100.00 | RM 464,100.00 | RM 400,698.78 | 86.3% | RM 63,401.22 | JANM 2024, p. 149 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 1,000.00 | RM 1,000.00 | RM 1,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 149 |
020300Pengangkutan JalanRevised RM 676.84 mSpent RM 673.62 m99.5%
Activity total as printed: revised RM 676,838,560.00, spent RM 673,617,079.57 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 430,500,200.00 | RM 433,101,900.00 | RM 433,101,857.86 | 100.0% | RM 42.14 | JANM 2024, p. 149 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 273,997,200.00 | RM 225,545,398.00 | RM 224,264,700.94 | 99.4% | RM 1,280,697.06 | JANM 2024, p. 149 |
| 30000 | AssetsAset | RM 563,000.00 | RM 8,250,390.00 | RM 7,720,739.00 | 93.6% | RM 529,651.00 | JANM 2024, p. 149 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,322,400.00 | RM 9,940,872.00 | RM 8,529,781.77 | 85.8% | RM 1,411,090.23 | JANM 2024, p. 149 |
020400Lembaga Pelesenan Kenderaan Perdagangan Sabah (LPKP Sabah)Revised RM 5.08 mSpent RM 5.04 m99.3%
Activity total as printed: revised RM 5,076,020.00, spent RM 5,037,805.85 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,232,300.00 | RM 3,321,700.00 | RM 3,321,636.09 | 100.0% | RM 63.91 | JANM 2024, p. 149 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,762,200.00 | RM 1,751,320.00 | RM 1,716,169.76 | 98.0% | RM 35,150.24 | JANM 2024, p. 149 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,000.00 | RM 3,000.00 | RM 0.00 | 0.0% | RM 3,000.00 | JANM 2024, p. 149 |
020500Lembaga Pelesenan Kenderaan Perdagangan Sarawak (LPKP Sarawak)Revised RM 3.80 mSpent RM 3.78 m99.5%
Activity total as printed: revised RM 3,796,824.00, spent RM 3,777,877.72 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,934,000.00 | RM 3,024,900.00 | RM 3,024,813.47 | 100.0% | RM 86.53 | JANM 2024, p. 149 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 826,800.00 | RM 754,114.00 | RM 742,251.25 | 98.4% | RM 11,862.75 | JANM 2024, p. 149 |
| 30000 | AssetsAset | RM 0.00 | RM 14,810.00 | RM 10,813.00 | 73.0% | RM 3,997.00 | JANM 2024, p. 149 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,000.00 | RM 3,000.00 | RM 0.00 | 0.0% | RM 3,000.00 | JANM 2024, p. 149 |
020600Pihak Berkuasa Penerbangan Awam Malaysia (CAAM)Revised RM 150.30 mSpent RM 150.30 m100.0%
Activity total as printed: revised RM 150,297,000.00, spent RM 150,297,000.00 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 150,297,000.00 | RM 150,297,000.00 | RM 150,297,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 149 |
020700Malaysian Institute of Road Safety Research (MIROS)Revised RM 15.84 mSpent RM 15.84 m100.0%
Activity total as printed: revised RM 15,844,000.00, spent RM 15,844,000.00 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 15,844,000.00 | RM 15,844,000.00 | RM 15,844,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 149 |
030000Program Khusus
030100Bertugas ke Luar NegaraRevised RM 3.00 mSpent RM 2.51 m83.7%
Activity total as printed: revised RM 3,000,000.00, spent RM 2,509,660.88 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,000,000.00 | RM 3,000,000.00 | RM 2,509,660.88 | 83.7% | RM 490,339.12 | JANM 2024, p. 149 |
030200Emolumen Kakitangan KontrakRevised RM 918,000.00Spent RM 815,030.9688.8%
Activity total as printed: revised RM 918,000.00, spent RM 815,030.96 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 918,000.00 | RM 918,000.00 | RM 815,030.96 | 88.8% | RM 102,969.04 | JANM 2024, p. 149 |
030300Subsidi Perkhidmatan Udara Luar Bandar (RAS)Revised RM 209.00 mSpent RM 208.85 m99.9%
Activity total as printed: revised RM 209,000,000.00, spent RM 208,854,285.72 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 209,000,000.00 | RM 209,000,000.00 | RM 208,854,285.72 | 99.9% | RM 145,714.28 | JANM 2024, p. 149 |
030400Subsidi Operasi Tren Tidak Ekonomik (KTMB)Revised RM 24.29 mSpent RM 24.20 m99.6%
Activity total as printed: revised RM 24,286,400.00, spent RM 24,199,593.10 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 20,000,000.00 | RM 24,286,400.00 | RM 24,199,593.10 | 99.6% | RM 86,806.90 | JANM 2024, p. 149 |
030500Institut Hal Ehwal Maritim (MIMA)Revised RM 3.00 mSpent RM 3.00 m100.0%
Activity total as printed: revised RM 3,000,000.00, spent RM 3,000,000.00 (JANM 2024, p. 149).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,000,000.00 | RM 3,000,000.00 | RM 3,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 149 |
030600Penyelenggaraan Kenderaan Penguatkuasa JPJRevised RM 5.00 mSpent RM 4.99 m99.8%
Activity total as printed: revised RM 5,000,000.00, spent RM 4,987,698.46 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 5,000,000.00 | RM 5,000,000.00 | RM 4,987,698.46 | 99.8% | RM 12,301.54 | JANM 2024, p. 150 |
030700Penyelenggaraan Bangunan JPJRevised RM 5.00 mSpent RM 4.95 m99.0%
Activity total as printed: revised RM 5,000,000.00, spent RM 4,951,480.14 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 5,000,000.00 | RM 4,500,000.00 | RM 4,468,112.90 | 99.3% | RM 31,887.10 | JANM 2024, p. 150 |
| 30000 | AssetsAset | RM 0.00 | RM 500,000.00 | RM 483,367.24 | 96.7% | RM 16,632.76 | JANM 2024, p. 150 |
030800Insentif Pas Bulanan Tanpa Had (My50)Revised RM 200.00 mSpent RM 200.00 m100.0%
Activity total as printed: revised RM 200,000,000.00, spent RM 200,000,000.00 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 200,000,000.00 | RM 200,000,000.00 | RM 200,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 150 |
030900Pas MutiaraRevised RM 6.00 mSpent RM 4.62 m77.0%
Activity total as printed: revised RM 6,000,000.00, spent RM 4,622,575.00 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 10,000,000.00 | RM 6,000,000.00 | RM 4,622,575.00 | 77.0% | RM 1,377,425.00 | JANM 2024, p. 150 |
031000Emolumen Kakitangan Kontrak SPADRevised RM 29.60 mSpent RM 28.39 m95.9%
Activity total as printed: revised RM 29,600,000.00, spent RM 28,393,562.88 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 29,585,000.00 | RM 29,559,269.00 | RM 28,352,903.67 | 95.9% | RM 1,206,365.33 | JANM 2024, p. 150 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 15,000.00 | RM 40,731.00 | RM 40,659.21 | 99.8% | RM 71.79 | JANM 2024, p. 150 |
031100Pas Perjalanan Percuma Pelajar Sekolah dan OKURevised RM 2.38 mSpent RM 759,138.5831.8%
Activity total as printed: revised RM 2,383,900.00, spent RM 759,138.58 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,942,000.00 | RM 2,383,900.00 | RM 759,138.58 | 31.8% | RM 1,624,761.42 | JANM 2024, p. 150 |
040000"one-off"
040100Harta ModalRevised RM 1.16 mSpent RM 1.09 m94.3%
Activity total as printed: revised RM 1,156,200.00, spent RM 1,090,451.50 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 30000 | AssetsAset | RM 856,200.00 | RM 1,156,200.00 | RM 1,090,451.50 | 94.3% | RM 65,748.50 | JANM 2024, p. 150 |
040200Penganjuran ICAO Air Services Negotiation (ICAN2024)Revised RM 2.94 mSpent RM 2.56 m86.9%
Activity total as printed: revised RM 2,944,500.00, spent RM 2,557,768.95 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,000.00 | RM 6,000.00 | RM 4,733.28 | 78.9% | RM 1,266.72 | JANM 2024, p. 150 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,938,500.00 | RM 2,938,500.00 | RM 2,553,035.67 | 86.9% | RM 385,464.33 | JANM 2024, p. 150 |
040300High Level Asean Transport MeetingRevised RM 3.10 mSpent RM 3.01 m97.0%
Activity total as printed: revised RM 3,100,000.00, spent RM 3,006,502.68 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,100,000.00 | RM 1,270,520.00 | RM 1,177,022.68 | 92.6% | RM 93,497.32 | JANM 2024, p. 150 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 0.00 | RM 1,829,480.00 | RM 1,829,480.00 | 100.0% | RM 0.00 | JANM 2024, p. 150 |
040400Penggantian Fire Suppression System-Agronite Cylinder JPJRevised RM 6.00 mSpent RM 6.00 m100.0%
Activity total as printed: revised RM 6,000,000.00, spent RM 6,000,000.00 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 30000 | AssetsAset | RM 6,000,000.00 | RM 6,000,000.00 | RM 6,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 150 |
040500Perkhidmatan Menaik Taraf Performance Monitoring Hub SystemRevised RM 0.00Spent RM 0.000.0%
Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2024, p. 150).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 30000 | AssetsAset | RM 928,100.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2024, p. 150 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2024, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.