Skip to content

Kementerian Industri Utama

A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2019, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Perusahaan Perladangan dan Komoditi in 2016–2017, 2020–2022 and Kementerian Perladangan dan Komoditi in 2023–2025.

All development votes in 2019 · Operating vote B.20 · P.20 in Budget 2027

Estimate 2019Anggaran
RM 326.59 m
Spent 2019Sebenar
RM 320.70 m
98.2% of the estimate; RM 25.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 4.42 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 1.35 bn
Totals as printed, JANM 2019, pp. 168–169

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2019AnggaranSpent 2019Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
00100Lembaga Koko Malaysia (LKM)RM 178,939,000.00RM 33,218,700.00RM 33,218,700.00
100.0%
RM 100,103,446.00JANM 2019, pp. 168–169
00401Lembaga Kenaf dan Tembakau Negara (LKTN)RM 184,185,819.00RM 17,804,000.00RM 17,804,000.00
100.0%
RM 85,068,982.00JANM 2019, pp. 168–169
00518Program Pembangunan Kepakaran Sumber ManusiaRM 3,860,000.00RM 670,000.00RM 335,000.00
50.0%
RM 2,155,000.00JANM 2019, pp. 168–169
00519Pembangunan Sumber Pertumbuhan Baru: SagoRM 15,000,000.00RM 600,000.00RM 600,000.00
100.0%
RM 13,727,000.00JANM 2019, pp. 168–169
00526Pejabat Kementerian Industri UtamaRM 371,427,417.00RM 22,718,100.00RM 21,116,671.99
93.0%
RM 107,401,552.53JANM 2019, pp. 168–169
11001Lembaga Getah Malaysia (LGM)RM 102,732,308.00RM 3,595,000.00RM 3,595,000.00
100.0%
RM 34,104,250.00JANM 2019, pp. 168–169
11101Lembaga Minyak Sawit Malaysia (MPOB)RM 311,870,000.00RM 12,050,000.00RM 12,050,000.00
100.0%
RM 42,990,000.00JANM 2019, pp. 168–169
11200Lembaga Perindustrian Kayu Malaysia (MTIB)RM 974,806,000.00RM 36,580,000.00RM 36,580,000.00
100.0%
RM 344,922,500.00JANM 2019, pp. 168–169
11300Lembaga Lada Malaysia (MPB)RM 131,456,419.00RM 27,384,500.00RM 27,384,164.00
100.0%
RM 82,352,193.00JANM 2019, pp. 168–169
94000Projek Berimpak Tinggi Industri UtamaRM 2,144,533,979.00RM 171,969,760.00RM 168,013,625.11
97.7%
RM 532,750,657.95JANM 2019, pp. 168–169

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2019, Statement of Development Expenditure (Lampiran 2).