Estimate 2019Anggaran
RM 326.59 m
Spent 2019Sebenar
RM 320.70 m
98.2% of the estimate; RM 25.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 4.42 bn
Every project
Each project exactly as printed, to the sen, with the two-page spread it was read from.
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 00100 | Lembaga Koko Malaysia (LKM) | RM 178,939,000.00 | RM 33,218,700.00 | RM 33,218,700.00 | 100.0% | RM 100,103,446.00 | JANM 2019, pp. 168–169 |
| 00401 | Lembaga Kenaf dan Tembakau Negara (LKTN) | RM 184,185,819.00 | RM 17,804,000.00 | RM 17,804,000.00 | 100.0% | RM 85,068,982.00 | JANM 2019, pp. 168–169 |
| 00518 | Program Pembangunan Kepakaran Sumber Manusia | RM 3,860,000.00 | RM 670,000.00 | RM 335,000.00 | 50.0% | RM 2,155,000.00 | JANM 2019, pp. 168–169 |
| 00519 | Pembangunan Sumber Pertumbuhan Baru: Sago | RM 15,000,000.00 | RM 600,000.00 | RM 600,000.00 | 100.0% | RM 13,727,000.00 | JANM 2019, pp. 168–169 |
| 00526 | Pejabat Kementerian Industri Utama | RM 371,427,417.00 | RM 22,718,100.00 | RM 21,116,671.99 | 93.0% | RM 107,401,552.53 | JANM 2019, pp. 168–169 |
| 11001 | Lembaga Getah Malaysia (LGM) | RM 102,732,308.00 | RM 3,595,000.00 | RM 3,595,000.00 | 100.0% | RM 34,104,250.00 | JANM 2019, pp. 168–169 |
| 11101 | Lembaga Minyak Sawit Malaysia (MPOB) | RM 311,870,000.00 | RM 12,050,000.00 | RM 12,050,000.00 | 100.0% | RM 42,990,000.00 | JANM 2019, pp. 168–169 |
| 11200 | Lembaga Perindustrian Kayu Malaysia (MTIB) | RM 974,806,000.00 | RM 36,580,000.00 | RM 36,580,000.00 | 100.0% | RM 344,922,500.00 | JANM 2019, pp. 168–169 |
| 11300 | Lembaga Lada Malaysia (MPB) | RM 131,456,419.00 | RM 27,384,500.00 | RM 27,384,164.00 | 100.0% | RM 82,352,193.00 | JANM 2019, pp. 168–169 |
| 94000 | Projek Berimpak Tinggi Industri Utama | RM 2,144,533,979.00 | RM 171,969,760.00 | RM 168,013,625.11 | 97.7% | RM 532,750,657.95 | JANM 2019, pp. 168–169 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2019, Statement of Development Expenditure (Lampiran 2).