Skip to content

Kementerian Perusahaan Perladangan dan Komoditi

A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2017, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Industri Utama in 2018–2019 and Kementerian Perladangan dan Komoditi in 2023–2025.

All development votes in 2017 · Operating vote B.20 · P.20 in Budget 2027

Estimate 2017Anggaran
RM 442.01 m
Spent 2017Sebenar
RM 373.02 m
84.4% of the estimate; RM 70.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 3.96 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 693.48 m
Totals as printed, JANM 2017, pp. 212–213

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
00100Lembaga Koko Malaysia (LKM)RM 167,009,000.00RM 24,703,000.00RM 24,703,000.00
100.0%
RM 47,599,746.00JANM 2017, pp. 212–213
00401Lembaga Kenaf dan Tembakau Negara (LKTN)RM 169,589,069.00RM 14,040,000.00RM 14,040,000.00
100.0%
RM 50,424,482.00JANM 2017, pp. 212–213
00518Program Pembangunan Kepakaran Sumber ManusiaRM 3,860,000.00RM 910,000.00RM 910,000.00
100.0%
RM 1,310,000.00JANM 2017, pp. 212–213
00519Pembangunan Sumber Pertumbuhan Baru: SagoRM 15,000,000.00RM 7,796,000.00RM 7,796,000.00
100.0%
RM 12,127,000.00JANM 2017, pp. 212–213
00526Pejabat Kementerian Perusahaan Perladangan dan KomoditiRM 214,925,502.00RM 15,461,000.00RM 15,460,178.40
100.0%
RM 58,418,756.29JANM 2017, pp. 212–213
11001Lembaga Getah Malaysia (LGM)RM 101,732,208.00RM 15,042,900.00RM 13,871,450.00
92.2%
RM 22,623,750.00JANM 2017, pp. 212–213
11101Lembaga Minyak Sawit Malaysia (MPOB)RM 44,000,000.00RM 6,500,000.00RM 6,500,000.00
100.0%
RM 15,200,000.00JANM 2017, pp. 212–213
11200Lembaga Perindustrian Kayu Malaysia (MTIB)RM 974,556,000.00RM 91,300,000.00RM 91,200,000.00
99.9%
RM 223,302,000.00JANM 2017, pp. 212–213
11300Lembaga Lada Malaysia (MPB)RM 129,456,419.00RM 22,486,600.00RM 18,093,300.00
80.5%
RM 34,225,029.00JANM 2017, pp. 212–213
94000NKEANote: P.20– Butiran 94000- Peruntukan sebanyak RM156,700,000 akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 2,144,533,979.00RM 243,769,000.00RM 180,441,153.14
74.0%
RM 228,246,153.14JANM 2017, pp. 212–213

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2017, Statement of Development Expenditure (Lampiran 2).