A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2020, by programme and activity, from the audited Statement of Operating Expenditure.

The 2020 operating figures were read by OCR.

The published statement draws these tables without a text layer, so every amount was read from the page. Each printed total equals the sum of its rows or is a misprint confirmed on the page. Programme and activity names are OCR readings. How this was done

Original budgetAsal
RM 1.79 bn
Revised budgetJumlah
RM 1.21 bn
SpentSebenar
RM 1.18 bn
97.2% of the revised budget
UnspentVarian
RM 33.96 m
Totals as printed, JANM 2020, p. 142

By programme

Each programme's totals as the statement prints them. Hover a figure for the exact amount, or open an activity below for every line to the sen.

CodeKodProgrammeProgramOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
010000PengurusanRM 378.23 mRM 371.46 mRM 349.69 m
94.1%
RM 21.76 mJANM 2020, p. 138
020000Pembangunan Infrastruktur Jalan dan Pembangunan Industri PembinaanRM 61.45 mRM 65.49 mRM 63.60 m
97.1%
RM 1.90 mJANM 2020, p. 139
030000Pembinaan Infrastruktur BangunanRM 223.53 mRM 216.43 mRM 213.47 m
98.6%
RM 2.96 mJANM 2020, p. 140
040000Penyelenggaraan Aset Tak Alih KerajaanRM 112.55 mRM 109.86 mRM 108.11 m
98.4%
RM 1.75 mJANM 2020, p. 140
050000Program KhususRM 1.01 bnRM 441.62 mRM 436.06 m
98.7%
RM 5.56 mJANM 2020, p. 141
060000‘one Off’RM 2.69 mRM 5.43 mRM 5.40 m
99.4%
RM 32,004.57JANM 2020, p. 141

Every activity, line by line

Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.

The 2020 statement prints the original budget, the revised budget and actual spending only, with no supplementary or virement columns.

010000Pengurusan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
010100Pengurusan dan PentadbiranRevised RM 60.70 mSpent RM 48.53 m
80.0%

Activity total as printed: revised RM 60,700,781.00, spent RM 48,529,510.96 (JANM 2020, p. 138).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 32,531,100.00RM 28,703,270.00RM 27,928,662.77
97.3%
RM 774,607.23JANM 2020, p. 138
20000Supplies and ServicesPerkhidmatan dan BekalanRM 26,057,000.00RM 19,929,426.00RM 18,809,208.87
94.4%
RM 1,120,217.13JANM 2020, p. 138
30000AssetsAsetRM 674,800.00RM 557,095.00RM 472,718.00
84.8%
RM 84,377.00JANM 2020, p. 138
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 235,000.00RM 1,341,228.00RM 1,312,079.32
97.8%
RM 29,148.68JANM 2020, p. 138
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 200,000.00RM 10,169,762.00RM 6,842.00
0.1%
RM 10,162,920.00JANM 2020, p. 138
010200Dasar dan Pengurusan KorporatRevised RM 259.87 mSpent RM 250.78 m
96.5%

Activity total as printed: revised RM 259,867,351.00, spent RM 250,776,557.33 (JANM 2020, p. 138).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 203,402,200.00RM 204,364,639.00RM 196,187,703.72
96.0%
RM 8,176,935.28JANM 2020, p. 138
20000Supplies and ServicesPerkhidmatan dan BekalanRM 54,099,700.00RM 50,106,680.00RM 49,329,233.54
98.5%
RM 777,446.46JANM 2020, p. 138
30000AssetsAsetRM 5,114,200.00RM 5,346,032.00RM 5,214,936.77
97.5%
RM 131,095.23JANM 2020, p. 138
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 50,000.00RM 50,000.00RM 44,683.30
89.4%
RM 5,316.70JANM 2020, p. 138
010300Pusat Kecemerlangan Kejuruteraan dan Teknologi JKR (CREaTE)Revised RM 19.53 mSpent RM 19.38 m
99.2%

Activity total as printed: revised RM 19,533,349.00, spent RM 19,377,527.35 (JANM 2020, p. 138).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 11,314,900.00RM 11,049,715.00RM 10,893,894.26
98.6%
RM 155,820.74JANM 2020, p. 138
20000Supplies and ServicesPerkhidmatan dan BekalanRM 10,642,000.00RM 7,653,409.00RM 7,653,408.09
100.0%
RM 0.91JANM 2020, p. 138
30000AssetsAsetRM 240,000.00RM 66,825.00RM 66,825.00
100.0%
RM 0.00JANM 2020, p. 138
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 200,000.00RM 763,400.00RM 763,400.00
100.0%
RM 0.00JANM 2020, p. 138
010400Perancangan Aset BersepaduRevised RM 31.35 mSpent RM 31.01 m
98.9%

Activity total as printed: revised RM 31,354,852.00, spent RM 31,010,009.84 (JANM 2020, p. 138).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 28,744,500.00RM 28,707,294.00RM 28,476,507.46
99.2%
RM 230,786.54JANM 2020, p. 138
20000Supplies and ServicesPerkhidmatan dan BekalanRM 4,729,000.00RM 2,647,558.00RM 2,533,502.38
95.7%
RM 114,055.62JANM 2020, p. 138

020000Pembangunan Infrastruktur Jalan dan Pembangunan Industri Pembinaan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
020100Dasar dan PembangunanRevised RM 33.65 mSpent RM 32.49 m
96.6%

Activity total as printed: revised RM 33,646,021.00, spent RM 32,490,489.24 (JANM 2020, p. 138).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 16,091,800.00RM 15,891,800.00RM 15,349,910.17
96.6%
RM 541,889.83JANM 2020, p. 138
20000Supplies and ServicesPerkhidmatan dan BekalanRM 11,214,300.00RM 16,447,635.00RM 15,881,405.98
96.6%
RM 566,229.02JANM 2020, p. 138
30000AssetsAsetRM 93,000.00RM 106,586.00RM 101,391.56
95.1%
RM 5,194.44JANM 2020, p. 138
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 1,200,000.00RM 1,200,000.00RM 1,157,781.53
96.5%
RM 42,218.47JANM 2020, p. 138
020200Pembangunan JalanRevised RM 23.68 mSpent RM 23.30 m
98.4%

Activity total as printed: revised RM 23,676,869.00, spent RM 23,303,185.32 (JANM 2020, p. 138).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 22,890,000.00RM 22,316,827.00RM 21,947,119.74
98.3%
RM 369,707.26JANM 2020, p. 138
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,710,400.00RM 1,360,042.00RM 1,356,065.58
99.7%
RM 3,976.42JANM 2020, p. 138
020300Kejuruteraan GeoteknikRevised RM 8.17 mSpent RM 7.80 m
95.5%

Activity total as printed: revised RM 8,168,900.00, spent RM 7,802,090.91 (JANM 2020, p. 138).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,305,400.00RM 7,305,400.00RM 7,196,607.72
98.5%
RM 108,792.28JANM 2020, p. 138
20000Supplies and ServicesPerkhidmatan dan BekalanRM 943,500.00RM 863,500.00RM 605,483.19
70.1%
RM 258,016.81JANM 2020, p. 138

030000Pembinaan Infrastruktur Bangunan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
030100Perkhidmatan ArkitekRevised RM 17.46 mSpent RM 17.30 m
99.1%

Activity total as printed: revised RM 17,456,156.00, spent RM 17,297,386.06 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 16,584,700.00RM 16,449,848.00RM 16,347,912.18
99.4%
RM 101,935.82JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,486,200.00RM 1,006,308.00RM 949,473.88
94.3%
RM 56,834.12JANM 2020, p. 139
030200Kejuruteraan Awam dan StrukturRevised RM 25.84 mSpent RM 25.52 m
98.8%

Activity total as printed: revised RM 25,838,902.00, spent RM 25,515,544.47 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 26,657,100.00RM 24,253,440.00RM 23,961,385.77
98.8%
RM 292,054.23JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,832,800.00RM 1,585,462.00RM 1,554,158.70
98.0%
RM 31,303.30JANM 2020, p. 139
030300Kejuruteraan ElektrikRevised RM 55.08 mSpent RM 54.42 m
98.8%

Activity total as printed: revised RM 55,076,733.00, spent RM 54,419,502.57 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 50,396,900.00RM 49,909,044.00RM 49,267,093.52
98.7%
RM 641,950.48JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 5,409,200.00RM 5,160,013.00RM 5,144,733.05
99.7%
RM 15,279.95JANM 2020, p. 139
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 9,500.00RM 7,676.00RM 7,676.00
100.0%
RM 0.00JANM 2020, p. 139
030400Kejuruteraan MekanikalRevised RM 34.49 mSpent RM 34.23 m
99.3%

Activity total as printed: revised RM 34,485,350.00, spent RM 34,230,558.52 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 21,836,600.00RM 21,727,600.00RM 21,571,919.59
99.3%
RM 155,680.41JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 13,364,000.00RM 12,757,750.00RM 12,658,638.93
99.2%
RM 99,111.07JANM 2020, p. 139
030500Kerja KesihatanRevised RM 8.47 mSpent RM 8.38 m
98.9%

Activity total as printed: revised RM 8,471,642.00, spent RM 8,379,187.26 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,127,000.00RM 7,910,642.00RM 7,910,641.69
100.0%
RM 0.31JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 690,000.00RM 561,000.00RM 468,545.57
83.5%
RM 92,454.43JANM 2020, p. 139
030600Kerja KeselamatanRevised RM 7.03 mSpent RM 7.00 m
99.5%

Activity total as printed: revised RM 7,029,300.00, spent RM 6,997,800.24 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 6,559,300.00RM 6,459,300.00RM 6,430,101.22
99.5%
RM 29,198.78JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 800,000.00RM 570,000.00RM 567,699.02
99.6%
RM 2,300.98JANM 2020, p. 139
030700Kerja Bangunan Am 1Revised RM 7.59 mSpent RM 7.50 m
98.8%

Activity total as printed: revised RM 7,594,500.00, spent RM 7,503,217.56 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,275,600.00RM 7,160,600.00RM 7,129,156.69
99.6%
RM 31,443.31JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 593,900.00RM 433,900.00RM 374,060.87
86.2%
RM 59,839.13JANM 2020, p. 139
030800Kerja Bangunan Am 2Revised RM 7.52 mSpent RM 7.29 m
96.9%

Activity total as printed: revised RM 7,524,027.00, spent RM 7,289,572.03 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,059,800.00RM 7,142,645.00RM 6,923,750.98
96.9%
RM 218,894.02JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 542,600.00RM 381,382.00RM 365,821.05
95.9%
RM 15,560.95JANM 2020, p. 139
030900Kerja PendidikanRevised RM 10.76 mSpent RM 10.60 m
98.5%

Activity total as printed: revised RM 10,761,400.00, spent RM 10,598,696.28 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 10,489,400.00RM 9,761,400.00RM 9,717,533.80
99.5%
RM 43,866.20JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,150,000.00RM 1,000,000.00RM 881,162.48
88.1%
RM 118,837.52JANM 2020, p. 139
031000Kejuruteraan Infrastruktur PengangkutanRevised RM 12.17 mSpent RM 11.87 m
97.5%

Activity total as printed: revised RM 12,166,028.00, spent RM 11,867,091.64 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 10,501,400.00RM 10,501,400.00RM 10,242,780.27
97.5%
RM 258,619.73JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,545,700.00RM 1,664,628.00RM 1,624,311.37
97.6%
RM 40,316.63JANM 2020, p. 139
031100JKR Lembaga Kemajuan Kelantan Selatan (KESEDAR)Revised RM 7.39 mSpent RM 7.07 m
95.8%

Activity total as printed: revised RM 7,387,003.00, spent RM 7,073,491.91 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 6,527,300.00RM 6,520,113.00RM 6,254,809.02
95.9%
RM 265,303.98JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 864,000.00RM 866,890.00RM 818,682.89
94.4%
RM 48,207.11JANM 2020, p. 139
031200Kontrak dan Ukur BahanRevised RM 15.83 mSpent RM 15.77 m
99.6%

Activity total as printed: revised RM 15,830,880.00, spent RM 15,774,376.95 (JANM 2020, p. 139).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 15,376,800.00RM 15,218,600.00RM 15,166,246.19
99.7%
RM 52,353.81JANM 2020, p. 139
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,087,700.00RM 612,280.00RM 608,130.76
99.3%
RM 4,149.24JANM 2020, p. 139
031300Alam Sekitar dan Kecekapan TenagaRevised RM 5.86 mSpent RM 5.68 m
97.0%

Activity total as printed: revised RM 5,856,000.00, spent RM 5,681,132.21 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 5,384,600.00RM 5,384,600.00RM 5,246,655.60
97.4%
RM 137,944.40JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 551,400.00RM 471,400.00RM 434,476.61
92.2%
RM 36,923.39JANM 2020, p. 140
031400JKR Lembaga Kemajuan Terengganu (KETENGAH)Revised RM 955,885.00Spent RM 846,410.99
88.5%

Activity total as printed: revised RM 955,885.00, spent RM 846,410.99 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 1,327,900.00RM 845,950.00RM 736,476.27
87.1%
RM 109,473.73JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 494,100.00RM 109,935.00RM 109,934.72
100.0%
RM 0.28JANM 2020, p. 140

040000Penyelenggaraan Aset Tak Alih Kerajaan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
040100Senggara Fasiliti JalanRevised RM 10.58 mSpent RM 10.33 m
97.7%

Activity total as printed: revised RM 10,582,020.00, spent RM 10,334,989.20 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 8,039,600.00RM 8,166,100.00RM 8,131,583.84
99.6%
RM 34,516.16JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,928,400.00RM 2,415,920.00RM 2,203,405.36
91.2%
RM 212,514.64JANM 2020, p. 140
040200Senggara Fasiliti BangunanRevised RM 49.94 mSpent RM 49.12 m
98.3%

Activity total as printed: revised RM 49,943,500.00, spent RM 49,116,945.94 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 36,113,100.00RM 35,697,100.00RM 35,400,438.43
99.2%
RM 296,661.57JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 14,770,400.00RM 14,246,400.00RM 13,716,507.51
96.3%
RM 529,892.49JANM 2020, p. 140
040300Kejuruteraan CerunRevised RM 6.50 mSpent RM 6.32 m
97.3%

Activity total as printed: revised RM 6,495,234.00, spent RM 6,320,506.61 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 5,691,200.00RM 5,494,834.00RM 5,490,922.50
99.9%
RM 3,911.50JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,984,400.00RM 1,000,400.00RM 829,584.11
82.9%
RM 170,815.89JANM 2020, p. 140
040400JKR Wilayah Persekutuan PutrajayaRevised RM 9.05 mSpent RM 8.98 m
99.3%

Activity total as printed: revised RM 9,047,666.00, spent RM 8,982,309.32 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,460,800.00RM 7,727,056.00RM 7,673,040.35
99.3%
RM 54,015.65JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,888,000.00RM 1,320,610.00RM 1,309,268.97
99.1%
RM 11,341.03JANM 2020, p. 140
040500JKR Wilayah Persekutuan LabuanRevised RM 9.27 mSpent RM 9.11 m
98.3%

Activity total as printed: revised RM 9,267,129.00, spent RM 9,107,641.13 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,231,500.00RM 7,231,500.00RM 7,184,774.24
99.3%
RM 46,725.76JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,237,200.00RM 2,035,629.00RM 1,922,866.89
94.5%
RM 112,762.11JANM 2020, p. 140
040600JKR Wilayah Persekutuan Kuala LumpurRevised RM 24.52 mSpent RM 24.25 m
98.9%

Activity total as printed: revised RM 24,523,081.00, spent RM 24,250,159.90 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 22,138,200.00RM 21,850,663.00RM 21,850,662.53
100.0%
RM 0.47JANM 2020, p. 140
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,063,100.00RM 2,672,418.00RM 2,399,497.37
89.8%
RM 272,920.63JANM 2020, p. 140

050000Program Khusus

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
050100Bertugas ke Luar NegaraRevised RM 121,800.00Spent RM 121,799.05
100.0%

Activity total as printed: revised RM 121,800.00, spent RM 121,799.05 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 975,000.00RM 121,800.00RM 121,799.05
100.0%
RM 0.95JANM 2020, p. 140
050200Penyelenggaraan dan Pembaikan Kecil JambatanRevised RM 4.00 mSpent RM 3.86 m
96.6%

Activity total as printed: revised RM 4,000,000.00, spent RM 3,864,019.12 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 4,000,000.00RM 4,000,000.00RM 3,864,019.12
96.6%
RM 135,980.88JANM 2020, p. 140
050300Pertandingan KemahiranRevised RM 400,000.00Spent RM 182,191.49
45.5%

Activity total as printed: revised RM 400,000.00, spent RM 182,191.49 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,300,000.00RM 400,000.00RM 182,191.49
45.5%
RM 217,808.51JANM 2020, p. 140
050400Banci Lalu Lintas KebangsaanRevised RM 100,000.00Spent RM 66,598.49
66.6%

Activity total as printed: revised RM 100,000.00, spent RM 66,598.49 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,500,000.00RM 100,000.00RM 66,598.49
66.6%
RM 33,401.51JANM 2020, p. 140
050500Penyelenggaraan dan Bil Lampu Jalan dan Lampu Isyarat Jalan PersekutuanRevised RM 34.60 mSpent RM 34.43 m
99.5%

Activity total as printed: revised RM 34,600,000.00, spent RM 34,430,333.00 (JANM 2020, p. 140).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 34,000,000.00RM 34,600,000.00RM 34,430,333.00
99.5%
RM 169,667.00JANM 2020, p. 140
050600Penyelenggaraan Jalan Persekutuan Sabah, Sarawak dan W.P. Labuan (Bukan Pavemen)Revised RM 6.00 mSpent RM 4.50 m
75.1%

Activity total as printed: revised RM 6,000,000.00, spent RM 4,504,847.77 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 8,000,000.00RM 6,000,000.00RM 4,504,847.77
75.1%
RM 1,495,152.23JANM 2020, p. 141
050700Penyelenggaraan Kuarters Milik JKRRevised RM 8.80 mSpent RM 8.69 m
98.8%

Activity total as printed: revised RM 8,800,000.00, spent RM 8,692,224.67 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 10,000,000.00RM 8,800,000.00RM 8,692,224.67
98.8%
RM 107,775.33JANM 2020, p. 141
050800Pembaikan dan Penyelenggaraan Cerun di Jalan Persekutuan Semenanjung MalaysiaRevised RM 0.00Spent RM 0.00
0.0%

Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 140,000,000.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2020, p. 141
050900Penyelenggaraan Jalan Persekutuan Sabah, Sarawak dan W.P. LabuanRevised RM 78.50 mSpent RM 75.83 m
96.6%

Activity total as printed: revised RM 78,500,000.00, spent RM 75,834,202.54 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 80,000,000.00RM 78,500,000.00RM 75,834,202.54
96.6%
RM 2,665,797.46JANM 2020, p. 141
051000Penyelenggaraan Cerun di Jalan Persekutuan Sabah, Sarawak dan W.P. LabuanRevised RM 0.00Spent RM 0.00
0.0%

Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 20,000,000.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2020, p. 141
051100Penyelenggaraan Jalan Pesekutuan Semenanjung Malaysia (Bukan Pavemen)Revised RM 33.00 mSpent RM 32.88 m
99.6%

Activity total as printed: revised RM 33,000,000.00, spent RM 32,881,590.10 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 30,000,000.00RM 33,000,000.00RM 32,881,590.10
99.6%
RM 118,409.90JANM 2020, p. 141
051200Penyelenggaraan Jalan Persekutuan Semenanjung MalaysiaRevised RM 274.90 mSpent RM 274.45 m
99.8%

Activity total as printed: revised RM 274,900,000.00, spent RM 274,449,283.81 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 280,000,000.00RM 274,900,000.00RM 274,449,283.81
99.8%
RM 450,716.19JANM 2020, p. 141
051300Penyelenggaraan Bangunan Gunasama Kerajaan PersekutuanRevised RM 0.00Spent RM 0.00
0.0%

Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 202,000,000.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2020, p. 141
051400Bayaran Latihan IndustriRevised RM 1.10 mSpent RM 930,627.50
84.6%

Activity total as printed: revised RM 1,100,000.00, spent RM 930,627.50 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 800,000.00RM 1,100,000.00RM 930,627.50
84.6%
RM 169,372.50JANM 2020, p. 141
051500Bayaran Balik Pinjaman LLMRevised RM 100,000.00Spent RM 100,000.00
100.0%

Activity total as printed: revised RM 100,000.00, spent RM 100,000.00 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 100,000.00RM 100,000.00RM 100,000.00
100.0%
RM 0.00JANM 2020, p. 141
051600Penyelenggaraan Jalan Persekutuan Seluruh Malaysia (Berkala Pavemen)Revised RM 0.00Spent RM 0.00
0.0%

Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 200,000,000.00RM 0.00RM 0.00
0.0%
RM 0.00JANM 2020, p. 141

060000‘one Off’

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
060100Perpindahan Pejabat BaruRevised RM 369,803.00Spent RM 369,802.20
100.0%

Activity total as printed: revised RM 369,803.00, spent RM 369,802.20 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 60,000.00RM 369,803.00RM 369,802.20
100.0%
RM 0.80JANM 2020, p. 141
060200Menaiktaraf, Pembaikan dan Penyelenggaraan BangunanRevised RM 3.30 mSpent RM 3.29 m
99.9%

Activity total as printed: revised RM 3,297,448.00, spent RM 3,294,559.43 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
30000AssetsAsetRM 2,525,000.00RM 3,297,448.00RM 3,294,559.43
99.9%
RM 2,888.57JANM 2020, p. 141
060300Pembelian AsetRevised RM 1.77 mSpent RM 1.74 m
98.3%

Activity total as printed: revised RM 1,766,490.00, spent RM 1,737,374.80 (JANM 2020, p. 141).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
30000AssetsAsetRM 100,000.00RM 1,766,490.00RM 1,737,374.80
98.3%
RM 29,115.20JANM 2020, p. 141

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2020, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.