A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2016, by programme and activity, from the audited Statement of Operating Expenditure.

Original budgetAsal
RM 2.22 bn
Revised budgetJumlah
RM 2.06 bn
SpentSebenar
RM 1.99 bn
96.8% of the revised budget
UnspentVarian
RM 67.07 m
Totals as printed, JANM 2016, p. 148

By programme

Each programme's totals as the statement prints them. Hover a figure for the exact amount, or open an activity below for every line to the sen.

CodeKodProgrammeProgramOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
010000Pengurusan KkrRM 114.17 mRM 110.61 mRM 107.14 m
96.9%
RM 3.47 mJANM 2016, p. 144
020000Pengurusan Operasi dan StrategikRM 353.35 mRM 348.45 mRM 333.00 m
95.6%
RM 15.45 mJANM 2016, p. 145
030000Sektor InfraRM 70.61 mRM 72.65 mRM 70.75 m
97.4%
RM 1.90 mJANM 2016, p. 145
040000Sektor BangunanRM 87.59 mRM 90.05 mRM 81.51 m
90.5%
RM 8.55 mJANM 2016, p. 146
050000Sektor PakarRM 175.47 mRM 174.69 mRM 157.91 m
90.4%
RM 16.78 mJANM 2016, p. 147
060000Program KhususRM 816.01 mRM 666.05 mRM 647.25 m
97.2%
RM 18.80 mJANM 2016, p. 147
070000Dasar BaruRM 9.00 mRM 1.11 mRM 0.00
0.0%
RM 1.11 mJANM 2016, p. 148
080000"one-off"RM 597.12 mRM 598.20 mRM 597.18 m
99.8%
RM 1.02 mJANM 2016, p. 148

Every activity, line by line

Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.

The 2016 statement prints the original budget, the revised budget and actual spending only, with no supplementary or virement columns.

010000Pengurusan Kkr

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
010100Pengurusan Atasan KKRRevised RM 4.54 mSpent RM 4.54 m
100.0%

Activity total as printed: revised RM 4,542,050.00, spent RM 4,541,980.34 (JANM 2016, p. 144).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 1,823,600.00RM 1,835,200.00RM 1,835,149.17
100.0%
RM 50.83JANM 2016, p. 144
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,539,000.00RM 2,706,850.00RM 2,706,831.17
100.0%
RM 18.83JANM 2016, p. 144
010200PentadbiranRevised RM 6.45 mSpent RM 6.26 m
97.1%

Activity total as printed: revised RM 6,449,955.00, spent RM 6,260,077.74 (JANM 2016, p. 144).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 4,652,800.00RM 4,798,000.00RM 4,797,901.30
100.0%
RM 98.70JANM 2016, p. 144
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,738,900.00RM 1,651,955.00RM 1,462,176.44
88.5%
RM 189,778.56JANM 2016, p. 144
010300Dasar dan PembangunanRevised RM 54.77 mSpent RM 53.26 m
97.3%

Activity total as printed: revised RM 54,767,120.00, spent RM 53,263,721.03 (JANM 2016, p. 144).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 30,061,000.00RM 30,061,000.00RM 28,557,627.04
95.0%
RM 1,503,372.96JANM 2016, p. 144
20000Supplies and ServicesPerkhidmatan dan BekalanRM 19,166,000.00RM 24,706,120.00RM 24,706,093.99
100.0%
RM 26.01JANM 2016, p. 144
010400PengurusanRevised RM 44.85 mSpent RM 43.07 m
96.0%

Activity total as printed: revised RM 44,847,450.00, spent RM 43,071,353.41 (JANM 2016, p. 144).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 18,270,000.00RM 18,567,000.00RM 18,566,965.43
100.0%
RM 34.57JANM 2016, p. 144
20000Supplies and ServicesPerkhidmatan dan BekalanRM 35,656,000.00RM 23,147,988.00RM 21,464,401.16
92.7%
RM 1,683,586.84JANM 2016, p. 144
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 235,000.00RM 335,000.00RM 259,969.69
77.6%
RM 75,030.31JANM 2016, p. 144
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 32,000.00RM 2,797,462.00RM 2,780,017.13
99.4%
RM 17,444.87JANM 2016, p. 144

020000Pengurusan Operasi dan Strategik

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
020100Pengurusan Atasan JKRRevised RM 3.10 mSpent RM 2.59 m
83.6%

Activity total as printed: revised RM 3,099,400.00, spent RM 2,590,988.91 (JANM 2016, p. 144).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 2,366,000.00RM 2,366,000.00RM 1,977,481.26
83.6%
RM 388,518.74JANM 2016, p. 144
20000Supplies and ServicesPerkhidmatan dan BekalanRM 772,000.00RM 733,400.00RM 613,507.65
83.7%
RM 119,892.35JANM 2016, p. 144
020200Cawangan Perancangan Aset BersepaduRevised RM 33.61 mSpent RM 31.68 m
94.3%

Activity total as printed: revised RM 33,610,925.00, spent RM 31,679,949.79 (JANM 2016, p. 144).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 27,080,100.00RM 27,080,100.00RM 25,544,685.98
94.3%
RM 1,535,414.02JANM 2016, p. 144
20000Supplies and ServicesPerkhidmatan dan BekalanRM 6,853,500.00RM 6,510,825.00RM 6,135,263.81
94.2%
RM 375,561.19JANM 2016, p. 144
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 20,000.00RM 20,000.00RM 0.00
0.0%
RM 20,000.00JANM 2016, p. 144
020300Cawangan Dasar dan Pengurusan KorporatRevised RM 87.60 mSpent RM 80.92 m
92.4%

Activity total as printed: revised RM 87,598,680.00, spent RM 80,917,707.68 (JANM 2016, p. 144).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 33,680,000.00RM 33,680,000.00RM 27,037,472.77
80.3%
RM 6,642,527.23JANM 2016, p. 144
20000Supplies and ServicesPerkhidmatan dan BekalanRM 54,910,000.00RM 53,848,680.00RM 53,837,043.86
100.0%
RM 11,636.14JANM 2016, p. 144
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 70,000.00RM 70,000.00RM 43,191.05
61.7%
RM 26,808.95JANM 2016, p. 144
020400Cawangan Latihan dan InovasiRevised RM 8.01 mSpent RM 7.51 m
93.7%

Activity total as printed: revised RM 8,012,075.00, spent RM 7,510,762.46 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 3,805,500.00RM 3,805,500.00RM 3,764,359.97
98.9%
RM 41,140.03JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 7,038,500.00RM 4,206,575.00RM 3,746,402.49
89.1%
RM 460,172.51JANM 2016, p. 145
020500JKR Wilayah Persekutuan PutrajayaRevised RM 13.12 mSpent RM 12.70 m
96.8%

Activity total as printed: revised RM 13,120,710.00, spent RM 12,701,363.07 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 6,726,100.00RM 6,726,100.00RM 6,374,989.25
94.8%
RM 351,110.75JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 6,583,800.00RM 6,394,610.00RM 6,326,373.82
98.9%
RM 68,236.18JANM 2016, p. 145
020600JKR Wilayah Persekutuan Kuala LumpurRevised RM 22.72 mSpent RM 22.61 m
99.5%

Activity total as printed: revised RM 22,716,750.00, spent RM 22,608,690.79 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 20,660,000.00RM 20,660,000.00RM 20,656,463.51
100.0%
RM 3,536.49JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,165,000.00RM 2,056,750.00RM 1,952,227.28
94.9%
RM 104,522.72JANM 2016, p. 145
020700JKR Wilayah Persekutuan LabuanRevised RM 10.02 mSpent RM 9.31 m
93.0%

Activity total as printed: revised RM 10,018,500.00, spent RM 9,313,049.58 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,751,000.00RM 7,751,000.00RM 7,066,798.07
91.2%
RM 684,201.93JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,250,000.00RM 2,267,500.00RM 2,246,251.51
99.1%
RM 21,248.49JANM 2016, p. 145
020800JKR Lembaga Kemajuan Kelantan Selatan (KESEDAR)Revised RM 6.79 mSpent RM 6.65 m
97.9%

Activity total as printed: revised RM 6,793,700.00, spent RM 6,650,289.12 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 5,762,000.00RM 5,762,000.00RM 5,706,556.86
99.0%
RM 55,443.14JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,086,000.00RM 1,031,700.00RM 943,732.26
91.5%
RM 87,967.74JANM 2016, p. 145
020900Pengurusan ProjekRevised RM 163.48 mSpent RM 159.03 m
97.3%

Activity total as printed: revised RM 163,478,750.00, spent RM 159,029,675.71 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 157,850,000.00RM 157,850,000.00RM 154,034,818.18
97.6%
RM 3,815,181.82JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 5,925,000.00RM 5,628,750.00RM 4,994,857.53
88.7%
RM 633,892.47JANM 2016, p. 145

030000Sektor Infra

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
030100Cawangan JalanRevised RM 21.55 mSpent RM 21.32 m
98.9%

Activity total as printed: revised RM 21,550,795.00, spent RM 21,318,436.58 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 18,194,500.00RM 19,249,900.00RM 19,249,897.70
100.0%
RM 2.30JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,630,100.00RM 2,300,895.00RM 2,068,538.88
89.9%
RM 232,356.12JANM 2016, p. 145
030200Cawangan Pangkalan Udara dan MaritimRevised RM 12.18 mSpent RM 11.85 m
97.3%

Activity total as printed: revised RM 12,180,650.00, spent RM 11,846,697.77 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 9,959,000.00RM 9,959,000.00RM 9,701,657.64
97.4%
RM 257,342.36JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,347,000.00RM 2,221,650.00RM 2,145,040.13
96.5%
RM 76,609.87JANM 2016, p. 145
030300Cawangan Kejuruteraan CerunRevised RM 8.69 mSpent RM 8.39 m
96.5%

Activity total as printed: revised RM 8,687,250.00, spent RM 8,387,097.78 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 4,960,000.00RM 4,960,000.00RM 4,660,976.54
94.0%
RM 299,023.46JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 3,755,000.00RM 3,727,250.00RM 3,726,121.24
100.0%
RM 1,128.76JANM 2016, p. 145
030400Cawangan Senggara Fasiliti JalanRevised RM 30.23 mSpent RM 29.20 m
96.6%

Activity total as printed: revised RM 30,231,470.00, spent RM 29,199,347.61 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 8,046,000.00RM 8,046,000.00RM 7,013,894.81
87.2%
RM 1,032,105.19JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 21,714,600.00RM 22,185,470.00RM 22,185,452.80
100.0%
RM 17.20JANM 2016, p. 145

040000Sektor Bangunan

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
040100Cawangan Kerja Bangunan Am 1Revised RM 7.64 mSpent RM 6.97 m
91.2%

Activity total as printed: revised RM 7,643,650.00, spent RM 6,968,500.61 (JANM 2016, p. 145).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 6,792,000.00RM 6,792,000.00RM 6,167,210.34
90.8%
RM 624,789.66JANM 2016, p. 145
20000Supplies and ServicesPerkhidmatan dan BekalanRM 707,000.00RM 851,650.00RM 801,290.27
94.1%
RM 50,359.73JANM 2016, p. 145
040200Cawangan Kerja Bangunan Am 2Revised RM 6.46 mSpent RM 6.34 m
98.1%

Activity total as printed: revised RM 6,457,975.00, spent RM 6,336,164.68 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 5,607,200.00RM 5,792,500.00RM 5,792,411.04
100.0%
RM 88.96JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 720,500.00RM 665,475.00RM 543,753.64
81.7%
RM 121,721.36JANM 2016, p. 146
040300Cawangan Kerja KesihatanRevised RM 7.68 mSpent RM 7.20 m
93.7%

Activity total as printed: revised RM 7,681,400.00, spent RM 7,200,289.87 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 6,463,200.00RM 6,463,200.00RM 6,045,963.27
93.5%
RM 417,236.73JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,110,000.00RM 1,218,200.00RM 1,154,326.60
94.8%
RM 63,873.40JANM 2016, p. 146
040400Cawangan Kerja PendidikanRevised RM 12.70 mSpent RM 9.02 m
71.0%

Activity total as printed: revised RM 12,704,440.00, spent RM 9,017,479.89 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 11,330,000.00RM 11,330,000.00RM 7,985,860.63
70.5%
RM 3,344,139.37JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,530,000.00RM 1,374,440.00RM 1,031,619.26
75.1%
RM 342,820.74JANM 2016, p. 146
040500Cawangan Kerja KeselamatanRevised RM 8.31 mSpent RM 7.17 m
86.3%

Activity total as printed: revised RM 8,312,300.00, spent RM 7,170,727.79 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 7,106,600.00RM 7,106,600.00RM 6,082,678.25
85.6%
RM 1,023,921.75JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,286,000.00RM 1,205,700.00RM 1,088,049.54
90.2%
RM 117,650.46JANM 2016, p. 146
040600Cawangan Senggara Fasiliti BangunanRevised RM 47.25 mSpent RM 44.81 m
94.8%

Activity total as printed: revised RM 47,252,120.00, spent RM 44,811,970.25 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 29,707,000.00RM 33,782,100.00RM 33,782,049.07
100.0%
RM 50.93JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 15,231,600.00RM 13,470,020.00RM 11,029,921.18
81.9%
RM 2,440,098.82JANM 2016, p. 146

050000Sektor Pakar

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
050100Cawangan ArkitekRevised RM 16.86 mSpent RM 16.68 m
98.9%

Activity total as printed: revised RM 16,861,650.00, spent RM 16,678,399.01 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 13,776,100.00RM 14,282,400.00RM 14,282,343.08
100.0%
RM 56.92JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,715,000.00RM 2,579,250.00RM 2,396,055.93
92.9%
RM 183,194.07JANM 2016, p. 146
050200Cawangan Kejuruteraan ElektrikRevised RM 53.52 mSpent RM 53.39 m
99.8%

Activity total as printed: revised RM 53,522,300.00, spent RM 53,389,386.90 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 47,312,000.00RM 47,566,000.00RM 47,565,974.21
100.0%
RM 25.79JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 6,060,000.00RM 5,946,800.00RM 5,814,869.69
97.8%
RM 131,930.31JANM 2016, p. 146
50000Other ExpendituresPerbelanjaan-perbelanjaan LainRM 9,500.00RM 9,500.00RM 8,543.00
89.9%
RM 957.00JANM 2016, p. 146
050300Cawangan Kejuruteraan MekanikalRevised RM 39.56 mSpent RM 37.10 m
93.8%

Activity total as printed: revised RM 39,558,500.00, spent RM 37,103,744.27 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 22,050,000.00RM 22,050,000.00RM 20,283,399.43
92.0%
RM 1,766,600.57JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 18,430,000.00RM 17,508,500.00RM 16,820,344.84
96.1%
RM 688,155.16JANM 2016, p. 146
050400Cawangan Kontrak dan Ukur BahanRevised RM 15.42 mSpent RM 14.51 m
94.1%

Activity total as printed: revised RM 15,424,150.00, spent RM 14,507,293.92 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 14,169,000.00RM 14,169,000.00RM 13,379,535.82
94.4%
RM 789,464.18JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,325,000.00RM 1,255,150.00RM 1,127,758.10
89.8%
RM 127,391.90JANM 2016, p. 146
050500Cawangan Kejuruteraan Awam dan StrukturRevised RM 35.20 mSpent RM 24.71 m
70.2%

Activity total as printed: revised RM 35,195,550.00, spent RM 24,709,461.85 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 32,981,300.00RM 32,941,300.00RM 22,536,206.67
68.4%
RM 10,405,093.33JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,415,000.00RM 2,254,250.00RM 2,173,255.18
96.4%
RM 80,994.82JANM 2016, p. 146
050600Cawangan Alam Sekitar dan Kecekapan TenagaRevised RM 6.11 mSpent RM 4.84 m
79.1%

Activity total as printed: revised RM 6,113,560.00, spent RM 4,835,864.36 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 5,172,300.00RM 5,172,300.00RM 4,015,268.22
77.6%
RM 1,157,031.78JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 990,800.00RM 941,260.00RM 820,596.14
87.2%
RM 120,663.86JANM 2016, p. 146
050700Cawangan Kejuruteraan GeoteknikRevised RM 8.01 mSpent RM 6.69 m
83.5%

Activity total as printed: revised RM 8,012,305.00, spent RM 6,686,430.42 (JANM 2016, p. 146).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 6,386,100.00RM 6,386,100.00RM 5,269,533.59
82.5%
RM 1,116,566.41JANM 2016, p. 146
20000Supplies and ServicesPerkhidmatan dan BekalanRM 1,673,900.00RM 1,626,205.00RM 1,416,896.83
87.1%
RM 209,308.17JANM 2016, p. 146

060000Program Khusus

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
060100Banci Lalulintas KebangsaanRevised RM 2.34 mSpent RM 2.26 m
96.4%

Activity total as printed: revised RM 2,340,000.00, spent RM 2,256,422.46 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 1,600,000.00RM 1,640,000.00RM 1,584,371.68
96.6%
RM 55,628.32JANM 2016, p. 147
20000Supplies and ServicesPerkhidmatan dan BekalanRM 700,000.00RM 700,000.00RM 672,050.78
96.0%
RM 27,949.22JANM 2016, p. 147
060200Bayaran Balik Pinjaman LLMRevised RM 100,000.00Spent RM 100,000.00
100.0%

Activity total as printed: revised RM 100,000.00, spent RM 100,000.00 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 100,000.00RM 100,000.00RM 100,000.00
100.0%
RM 0.00JANM 2016, p. 147
060300Bayaran Latihan IndustriRevised RM 700,000.00Spent RM 535,185.56
76.5%

Activity total as printed: revised RM 700,000.00, spent RM 535,185.56 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 700,000.00RM 700,000.00RM 535,185.56
76.5%
RM 164,814.44JANM 2016, p. 147
060400Bertugas ke Luar NegaraRevised RM 2.00 mSpent RM 601,588.78
30.1%

Activity total as printed: revised RM 2,000,000.00, spent RM 601,588.78 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,000,000.00RM 2,000,000.00RM 601,588.78
30.1%
RM 1,398,411.22JANM 2016, p. 147
060500Emolumen Kakitangan KontrakRevised RM 5.65 mSpent RM 2.77 m
49.0%

Activity total as printed: revised RM 5,650,000.00, spent RM 2,765,560.73 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 5,500,000.00RM 5,500,000.00RM 2,716,639.48
49.4%
RM 2,783,360.52JANM 2016, p. 147
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 150,000.00RM 150,000.00RM 48,921.25
32.6%
RM 101,078.75JANM 2016, p. 147
060600Penyelenggaraan Bangunan Gunasama Kerajaan Persekutuan dan KuartersRevised RM 120.00 mSpent RM 118.60 m
98.8%

Activity total as printed: revised RM 120,000,000.00, spent RM 118,598,891.32 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 150,000,000.00RM 120,000,000.00RM 118,598,891.32
98.8%
RM 1,401,108.68JANM 2016, p. 147
060700Penyelenggaraan Jalan Persekutuan Sabah, Sarawak dan LabuanRevised RM 85.00 mSpent RM 83.76 m
98.5%

Activity total as printed: revised RM 85,000,000.00, spent RM 83,756,380.88 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 100,000,000.00RM 85,000,000.00RM 83,756,380.88
98.5%
RM 1,243,619.12JANM 2016, p. 147
060800Penyelenggaraan Jalan Persekutuan Semenanjung MalaysiaRevised RM 350.00 mSpent RM 344.29 m
98.4%

Activity total as printed: revised RM 350,000,000.00, spent RM 344,291,408.67 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 440,000,000.00RM 350,000,000.00RM 344,291,408.67
98.4%
RM 5,708,591.33JANM 2016, p. 147
060900Pembaikan dan Penyelenggaraan Cerun di Jalan PersekutuanRevised RM 85.00 mSpent RM 82.81 m
97.4%

Activity total as printed: revised RM 85,000,000.00, spent RM 82,810,986.93 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 100,000,000.00RM 85,000,000.00RM 82,810,986.93
97.4%
RM 2,189,013.07JANM 2016, p. 147
061000Pertandingan Kemahiran AntarabangsaRevised RM 2.76 mSpent RM 711,206.78
25.8%

Activity total as printed: revised RM 2,757,900.00, spent RM 711,206.78 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 2,757,900.00RM 2,757,900.00RM 711,206.78
25.8%
RM 2,046,693.22JANM 2016, p. 147
061100Program Pembangunan KontraktorRevised RM 3.50 mSpent RM 1.94 m
55.3%

Activity total as printed: revised RM 3,500,000.00, spent RM 1,935,959.87 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 3,500,000.00RM 3,500,000.00RM 1,935,959.87
55.3%
RM 1,564,040.13JANM 2016, p. 147
061200Pusat Kecemerlangan Teknologi NegaraRevised RM 9.00 mSpent RM 8.88 m
98.7%

Activity total as printed: revised RM 9,000,000.00, spent RM 8,884,272.00 (JANM 2016, p. 147).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 9,000,000.00RM 9,000,000.00RM 8,884,272.00
98.7%
RM 115,728.00JANM 2016, p. 147

070000Dasar Baru

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
070100Kenaikan Imbuhan Tetap PerumahanRevised RM 1.11 mSpent RM 0.00
0.0%

Activity total as printed: revised RM 1,108,700.00, spent RM 0.00 (JANM 2016, p. 148).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
10000EmolumentsEmolumenRM 9,000,000.00RM 1,108,700.00RM 0.00
0.0%
RM 1,108,700.00JANM 2016, p. 148

080000"one-off"

ActivityAktivitiRevised budgetJumlahSpentSebenar% usedPrestasi
080100Bayaran Pampasan TolRevised RM 593.32 mSpent RM 593.32 m
100.0%

Activity total as printed: revised RM 593,321,000.00, spent RM 593,318,000.00 (JANM 2016, p. 148).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
40000Grants and Fixed ChargesPemberian dan Kenaan Bayaran TetapRM 593,321,000.00RM 593,321,000.00RM 593,318,000.00
100.0%
RM 3,000.00JANM 2016, p. 148
080200ASEAN Skills Competition (ASC) 2016Revised RM 3.80 mSpent RM 2.83 m
74.5%

Activity total as printed: revised RM 3,800,000.00, spent RM 2,832,241.17 (JANM 2016, p. 148).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
20000Supplies and ServicesPerkhidmatan dan BekalanRM 3,800,000.00RM 3,800,000.00RM 2,832,241.17
74.5%
RM 967,758.83JANM 2016, p. 148
080300Harta ModalRevised RM 1.08 mSpent RM 1.03 m
95.2%

Activity total as printed: revised RM 1,081,010.00, spent RM 1,029,411.97 (JANM 2016, p. 148).

CodeKodSpending categoryMaksud PerbelanjaanOriginal budgetAsalRevised budgetJumlahSpentSebenar% usedPrestasiUnspentVarianSourceSumber
30000AssetsAsetRM 0.00RM 1,081,010.00RM 1,029,411.97
95.2%
RM 51,598.03JANM 2016, p. 148

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2016, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.