A development (P) vote: spending on this ministry's projects under the Twelfth Malaysia Plan (RMKe-12, 2021–2025). What each project was allocated and spent in 2021, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Kemajuan Luar Bandar dan Wilayah in 2016–2017 and Kementerian Kemajuan Desa dan Wilayah in 2023–2025.

All development votes in 2021 · Operating vote B.22 · P.22 in Budget 2027

Estimate 2021Anggaran
RM 5.31 bn
Spent 2021Sebenar
RM 5.31 bn
100.0% of the estimate; RM 408.93 m loan-funded
Total cost of projectsKos Keseluruhan
RM 64.93 bn
RMKe-12 spent to dateSebenar RMKe-12
RM 5.31 bn
Totals as printed, JANM 2021, pp. 202–203

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
Kemajuan Masyarakat (KEMAS)RM 49.75 mRM 49.75 m
100.0%
RM 49.75 mJANM 2021, pp. 200–201
Majlis Amanah Rakyat (MARA)RM 1.98 bnRM 1.98 bn
100.0%
RM 1.98 bnJANM 2021, pp. 200–201
Bekalan Elektrik Luar BandarRM 300.28 mRM 300.28 m
100.0%
RM 300.28 mJANM 2021, pp. 200–201
Bekalan Air Luar BandarRM 293.85 mRM 293.85 m
100.0%
RM 293.85 mJANM 2021, pp. 200–201

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Kemajuan Masyarakat (KEMAS)6 projectsEstimate RM 49.75 m · Spent RM 49.75 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00100Pendidikan KemahiranRM 96,500,000.00RM 13,161,520.00RM 13,161,510.15
100.0%
RM 13,161,510.15JANM 2021, pp. 200–201
00200Pembangunan KomunitiRM 16,000,000.00RM 1,321,180.00RM 1,321,177.00
100.0%
RM 1,321,177.00JANM 2021, pp. 200–201
00300Pusat Sumber MasyarakatRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 200–201
00400Pendidikan Awal Kanak-kanakRM 40,951,956.63RM 14,666,480.00RM 14,666,475.38
100.0%
RM 14,666,475.38JANM 2021, pp. 200–201
00500Pusat Kegiatan MasyarakatRM 145,269,000.00RM 18,493,110.00RM 18,493,107.55
100.0%
RM 18,493,107.55JANM 2021, pp. 200–201
00600Latihan dan Pembangunan Profesional KEMASRM 65,396,743.00RM 2,112,480.00RM 2,112,476.81
100.0%
RM 2,112,476.81JANM 2021, pp. 200–201
Majlis Amanah Rakyat (MARA)13 projectsEstimate RM 1.98 bn · Spent RM 1.98 bn
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00601Pembangunan Sistem MARA (Multisectors)RM 31,338,000.00RM 200.00RM 200.00
100.0%
RM 200.00JANM 2021, pp. 200–201
00602Maktab Rendah Sains MARARM 862,253,584.16RM 65,501,500.00RM 65,501,500.00
100.0%
RM 65,501,500.00JANM 2021, pp. 200–201
00604Institut Kemahiran MARARM 357,800,609.10RM 48,277,100.00RM 48,277,100.00
100.0%
RM 48,277,100.00JANM 2021, pp. 200–201
00605Kolej Profesional MARARM 305,100,000.00RM 12,000,400.00RM 12,000,400.00
100.0%
RM 12,000,400.00JANM 2021, pp. 200–201
00606Kolej Poly-Tech MARARM 59,980,000.00RM 11,729,500.00RM 11,729,500.00
100.0%
RM 11,729,500.00JANM 2021, pp. 200–201
00607Perkhidmatan PengangkutanRM 168,018,480.00RM 100.00RM 100.00
100.0%
RM 100.00JANM 2021, pp. 200–201
00608Penilaian dan Kaunseling/Bimbingan UsahawanRM 192,760,000.00RM 22,000,100.00RM 22,000,100.00
100.0%
RM 22,000,100.00JANM 2021, pp. 200–201
00611Program GIATMARARM 104,150,000.00RM 22,420,200.00RM 22,420,200.00
100.0%
RM 22,420,200.00JANM 2021, pp. 200–201
00614Bangunan PerniagaanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 200–201
00615Pinjaman/Pembiayaan Secara IslamRM 780,000,000.00RM 85,000,000.00RM 85,000,000.00
100.0%
RM 85,000,000.00JANM 2021, pp. 200–201
00616UniKLRM 323,438,000.00RM 8,000,300.00RM 8,000,300.00
100.0%
RM 8,000,300.00JANM 2021, pp. 200–201
00620Program Penajaan Pendidikan MARARM 10,204,000,000.00RM 1,708,000,100.00RM 1,708,000,100.00
100.0%
RM 1,708,000,100.00JANM 2021, pp. 200–201
00621Pembiayaan Mudah BumiputeraRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 200–201
Bekalan Elektrik Luar Bandar4 projectsEstimate RM 300.28 m · Spent RM 300.28 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
01701Bekalan Elektrik Luar Bandar SemenanjungRM 117,500,000.00RM 9,787,730.00RM 9,787,727.56
100.0%
RM 9,787,727.56JANM 2021, pp. 200–201
01702Bekalan Elektrik Luar Bandar SarawakRM 3,439,476,108.00RM 54,526,530.00RM 54,526,525.79
100.0%
RM 54,526,525.79JANM 2021, pp. 200–201
01703Bekalan Elektrik Luar Bandar SabahRM 3,817,748,626.00RM 84,819,990.00RM 84,819,988.30
100.0%
RM 84,819,988.30JANM 2021, pp. 200–201
01707Pemasangan Baru Lampu Jalan KampungRM 271,392,600.00RM 151,146,710.00RM 151,146,709.05
100.0%
RM 151,146,709.05JANM 2021, pp. 200–201
Bekalan Air Luar Bandar4 projectsEstimate RM 293.85 m · Spent RM 293.85 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
02001Bekalan Air Luar Bandar SemenanjungRM 580,669,000.00RM 60,492,050.00RM 60,492,042.93
100.0%
RM 60,492,042.93JANM 2021, pp. 200–201
02002Bekalan Air Luar Bandar SarawakRM 1,725,800,000.00RM 100,714,731.00RM 100,714,725.96
100.0%
RM 100,714,725.96JANM 2021, pp. 200–201
02003Bekalan Air Luar Bandar SabahRM 2,505,070,000.00RM 123,561,926.00RM 123,561,921.25
100.0%
RM 123,561,921.25JANM 2021, pp. 200–201
02004Bekalan Air AlternatifRM 77,400,000.00RM 9,077,500.00RM 9,077,494.86
100.0%
RM 9,077,494.86JANM 2021, pp. 200–201
Projects printed without a group subtotal31 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00700PPP/PFIRM 190,000,000.00RM 37,907,690.00RM 37,907,681.76
100.0%
RM 37,907,681.76JANM 2021, pp. 200–201
00800Teknologi Maklumat (ICT)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 200–201
00900Institut Kemajuan Desa (INFRA)RM 92,700,000.00RM 949,811.00RM 949,801.33
100.0%
RM 949,801.33JANM 2021, pp. 200–201
01100Jabatan Kemajuan Orang Asli (JAKOA)RM 1,867,363,666.00RM 80,582,067.00RM 80,582,065.96
100.0%
RM 80,582,065.96JANM 2021, pp. 200–201
02200Jambatan Luar BandarNote: P.22 – Butiran 02200 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 112,295,100.00RM 300,010.00RM 300,000.00
100.0%
RM 300,000.00JANM 2021, pp. 200–201
02300Jalan-jalan Luar BandarRM 21,974,467,517.01RM 596,102,145.00RM 596,102,138.81
100.0%
RM 596,102,138.81JANM 2021, pp. 200–201
02400Jalan Perhubungan DesaRM 1,592,500,000.00RM 326,139,131.00RM 326,139,125.26
100.0%
RM 326,139,125.26JANM 2021, pp. 200–201
02401Ameniti SosialRM 312,100,000.00RM 75,805,600.00RM 75,805,593.23
100.0%
RM 75,805,593.23JANM 2021, pp. 200–201
02402Pengupayaan Komuniti dan InfodesaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203
02403Program Bersepadu Pemajuan KawasanRM 295,500,000.00RM 29,545,769.00RM 29,545,763.16
100.0%
RM 29,545,763.16JANM 2021, pp. 202–203
02404Program Lonjakan Mega Luar BandarRM 171,500,000.00RM 12,620,100.00RM 12,620,100.00
100.0%
RM 12,620,100.00JANM 2021, pp. 202–203
02406Pembangunan Ladang Berskala BesarRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203
02503Pembangunan Ekonomi Luar BandarRM 101,500,000.00RM 9,989,460.00RM 9,989,449.00
100.0%
RM 9,989,449.00JANM 2021, pp. 202–203
02600Pembangunan Ekonomi KomunitiRM 265,000,000.00RM 5,477,490.00RM 5,477,480.00
100.0%
RM 5,477,480.00JANM 2021, pp. 202–203
03100Lembaga Pemulihan dan Penyatuan Tanah (FELCRA)RM 4,455,593,294.00RM 512,736,400.00RM 512,736,400.00
100.0%
RM 512,736,400.00JANM 2021, pp. 202–203
03200Skim Pembangunan Kesejahteraan RakyatRM 1,461,200,000.00RM 294,999,940.00RM 294,999,933.61
100.0%
RM 294,999,933.61JANM 2021, pp. 202–203
03700Lembaga Kemajuan Johor Tenggara (KEJORA)RM 184,200,000.00RM 21,100,000.00RM 21,100,000.00
100.0%
RM 21,100,000.00JANM 2021, pp. 202–203
03800Lembaga Kemajuan Terengganu Tengah (KETENGAH)RM 185,845,500.00RM 24,620,500.00RM 24,620,500.00
100.0%
RM 24,620,500.00JANM 2021, pp. 202–203
03900Lembaga Kemajuan Kelantan Selatan (KESEDAR)RM 412,521,038.00RM 47,313,500.00RM 47,313,500.00
100.0%
RM 47,313,500.00JANM 2021, pp. 202–203
04000Pihak Berkuasa Kemajuan Pekebun Kecil Perusahaan Getah (RISDA)RM 2,974,435,200.00RM 396,585,200.00RM 396,585,200.00
100.0%
RM 396,585,200.00JANM 2021, pp. 202–203
04100Lembaga Kemajuan Wilayah Kedah (KEDA)RM 263,200,599.00RM 36,029,650.00RM 36,029,650.00
100.0%
RM 36,029,650.00JANM 2021, pp. 202–203
04200Lembaga Kemajuan Wilayah Pulau Pinang (PERDA)RM 93,000,000.00RM 16,502,000.00RM 16,502,000.00
100.0%
RM 16,502,000.00JANM 2021, pp. 202–203
04500Lembaga Industri Getah Sabah (LIGS)RM 527,531,979.00RM 69,750,000.00RM 69,750,000.00
100.0%
RM 69,750,000.00JANM 2021, pp. 202–203
04800Jabatan Pertanian Sarawak (JPS)RM 636,876,900.00RM 27,132,320.00RM 27,132,312.34
100.0%
RM 27,132,312.34JANM 2021, pp. 202–203
05000Lembaga Kemajuan Tanah Sabah (SLDB)RM 258,280,703.00RM 30,000,000.00RM 30,000,000.00
100.0%
RM 30,000,000.00JANM 2021, pp. 202–203
06000Lembaga Kemajuan Tanah Sarawak (LKTS)RM 9,678,900.00RM 2,000,000.00RM 2,000,000.00
100.0%
RM 2,000,000.00JANM 2021, pp. 202–203
07000Lembaga Kemajuan Bintulu (BDA)RM 16,025,000.00RM 5,825,000.00RM 5,825,000.00
100.0%
RM 5,825,000.00JANM 2021, pp. 202–203
08000Lembaga Pemulihan dan Penyatuan Tanah Sarawak (SALCRA)RM 191,523,500.00RM 18,634,250.00RM 18,634,250.00
100.0%
RM 18,634,250.00JANM 2021, pp. 202–203
09000Lembaga Kemajuan Perusahaan Pertanian Negeri Pahang (LKPP)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203
94000NKEARM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203
10000Perbadanan Pembangunan Pertanian Negeri PerakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2021, Statement of Development Expenditure (Lampiran 2).