A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2016, from the audited Statement of Development Expenditure.

Estimate 2016Anggaran
RM 3.93 bn
Spent 2016Sebenar
RM 3.78 bn
96.3% of the estimate; RM 500.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 38.19 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 3.78 bn
Totals as printed, JANM 2016, pp. 228–229

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
Jalan Raya dan Jambatan SemenanjungRM 3.05 bnRM 2.91 bn
95.2%
RM 2.91 bnJANM 2016, pp. 228–229
SabahRM 500.06 mRM 499.27 m
99.8%
RM 499.27 mJANM 2016, pp. 228–229
SarawakRM 335.42 mRM 334.88 m
99.8%
RM 334.88 mJANM 2016, pp. 228–229
LabuanRM 18.95 mRM 18.94 m
100.0%
RM 18.94 mJANM 2016, pp. 228–229
Jumlah Jalan Raya dan Jambatan Semenanjung, Sarawak, Sabah dan Labuansums Jalan Raya dan Jambatan Semenanjung, Sabah, Sarawak, LabuanRM 3.91 bnRM 3.76 bn
96.2%
RM 3.76 bnJANM 2016, pp. 228–229
BANGUNAN-BANGUNAN KERAJAAN (Selain daripada Perumahan)RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
Kuari, Jentera, Workshop dan Stor Kerja RayaRM 6,400.00RM 6,359.80
99.4%
RM 6,359.80JANM 2016, pp. 228–229
Perumahan KerajaanRM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Jalan Raya dan Jambatan Semenanjung24 projectsEstimate RM 3.05 bn · Spent RM 2.91 bn
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
00500Jalan Simpang Pulai-Lojing-Gua Musang-Kuala BerangRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
00700Pembinaan Lain-Lain Jalan Persekutuan dan JambatanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 783,660,000.00RM 109,506,700.00RM 109,389,864.63
99.9%
RM 109,389,864.63JANM 2016, pp. 228–229
00600Jalan-jalan Raya BaruRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
02000Skim Mengatasi Kesesakan Lalu Lintas Pulau PinangRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
02500Baik Pulih Jalan di Pulau PinangRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
02800Memperbaiki, Mengganti dan Menaikkan Taraf Jalan dan JambatanRM 364,982,000.00RM 100,000.00RM 85,289.30
85.3%
RM 85,289.30JANM 2016, pp. 228–229
09600Naik Taraf Jalan (III)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
09800Pembinaan Jalan RayaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
10001Projek Penswastaan Jalan Raya (PBT)RM 487,693,061.00RM 23,679,100.00RM 23,679,096.02
100.0%
RM 23,679,096.02JANM 2016, pp. 228–229
19000Penyelidikan dan Pembangunan KejuruteraanRM 567,530,432.00RM 43,953,482.00RM 43,953,481.63
100.0%
RM 43,953,481.63JANM 2016, pp. 228–229
20000Membina Persimpangan Bertingkat dan JejambatNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 350,744,000.00RM 75,400,582.00RM 75,342,471.31
99.9%
RM 75,342,471.31JANM 2016, pp. 228–229
21000Membina Persimpangan Bertingkat (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 976,888,702.00RM 85,606,323.00RM 85,557,168.97
99.9%
RM 85,557,168.97JANM 2016, pp. 228–229
30000Membina Jambatan-jambatan BaruRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
31000Pembinaan Jalan dan Jambatan (Projek Baru)RM 1,595,388,168.00RM 123,219,700.00RM 119,778,019.86
97.2%
RM 119,778,019.86JANM 2016, pp. 228–229
41000Kajian Kemungkinan Jalan (Projek Baru)RM 12,550,000.00RM 1,272,000.00RM 1,270,204.43
99.9%
RM 1,270,204.43JANM 2016, pp. 228–229
51000Pelbagai Pembinaan (Projek Baru)RM 600,700,000.00RM 58,333,700.00RM 57,552,408.88
98.7%
RM 57,552,408.88JANM 2016, pp. 228–229
60000Naik Taraf Jalanraya dan LaluanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 4,064,794,032.00RM 512,203,013.00RM 512,115,256.29
100.0%
RM 512,115,256.29JANM 2016, pp. 228–229
61000Naik Taraf Jalan-jalan (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 7,370,857,152.00RM 580,698,694.00RM 573,501,939.38
98.8%
RM 573,501,939.38JANM 2016, pp. 228–229
70000Projek Memperelok Jalan-jalanRM 49,000,000.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
71000Memperelok dan Membaikpulih Jalan (Projek Baru)RM 562,560,411.00RM 69,366,900.00RM 68,702,771.17
99.0%
RM 68,702,771.17JANM 2016, pp. 228–229
80000Membina Jalan-jalan BaruNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 609,178,049.00RM 108,445,050.00RM 108,425,129.11
100.0%
RM 108,425,129.11JANM 2016, pp. 228–229
81000Membina Jalan-jalan Baru (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 12,376,475,388.00RM 1,157,140,800.00RM 1,023,957,305.10
88.5%
RM 1,023,957,305.10JANM 2016, pp. 228–229
89000Pengambilan Balik Tanah Untuk Projek-Projek Jalan /JambatanRM 97,431,906.00RM 2,040,000.00RM 2,029,263.56
99.5%
RM 2,029,263.56JANM 2016, pp. 228–229
90000Lain-lain PembinaanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 261,118,800.00RM 102,454,725.00RM 102,044,701.62
99.6%
RM 102,044,701.62JANM 2016, pp. 228–229
Sabah8 projectsEstimate RM 500.06 m · Spent RM 499.27 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
05100Jalan-Jalan Besar di SabahNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 380,000,000.00RM 63,459,716.00RM 63,458,131.91
100.0%
RM 63,458,131.91JANM 2016, pp. 228–229
08230Pembinaan JambatanRM 57,500,000.00RM 290,000.00RM 289,148.97
99.7%
RM 289,148.97JANM 2016, pp. 228–229
08250Kajian Perlindungan/Pembaikan Cerun-cerunRM 209,970,000.00RM 50,470,000.00RM 50,450,134.89
100.0%
RM 50,450,134.89JANM 2016, pp. 228–229
08260Naik Taraf dan Memulihkan JalanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 921,000,153.00RM 215,076,774.00RM 215,039,883.11
100.0%
RM 215,039,883.11JANM 2016, pp. 228–229
08270Memulihkan JalanRM 91,954,094.00RM 11,649,400.00RM 11,090,127.26
95.2%
RM 11,090,127.26JANM 2016, pp. 228–229
08280Pembinaan Jalan-jalan (I)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 1,121,328,797.00RM 157,358,135.00RM 157,318,131.76
100.0%
RM 157,318,131.76JANM 2016, pp. 228–229
08500Projek Keselamatan JalanRM 47,908,000.00RM 700,000.00RM 656,880.80
93.8%
RM 656,880.80JANM 2016, pp. 228–229
08600Naik Taraf Jalan RayaRM 726,100,000.00RM 1,060,000.00RM 964,260.48
91.0%
RM 964,260.48JANM 2016, pp. 228–229
Sarawak5 projectsEstimate RM 335.42 m · Spent RM 334.88 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
09230Jambatan-jambatanRM 1,133,490,000.00RM 40,000,000.00RM 39,583,270.90
99.0%
RM 39,583,270.90JANM 2016, pp. 228–229
09240Kajian Pemeriksaan dan Membaiki JambatanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
09260Naik Taraf Jalan (II)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 1,091,760,114.00RM 215,711,059.00RM 215,680,166.31
100.0%
RM 215,680,166.31JANM 2016, pp. 228–229
09270Membaiki dan Penurapan JalanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
09280Membina Jalan-jalan secara PPPNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 09280, 20000, 21000, 60000, 61000, 80000, 81000 dan 90000 - Peruntukan sebanyak RM15,783,700 , RM 21,379,716 , RM 31,449,074 , RM 17,778,135, RM 24,582,059 , RM6,708,073 , RM 9,490,182, RM14,732,323 , RM 71,049,013 , RM 103,535,094 ,RM 11,024,350 , RM 245,371,400 dan RM 29,877,725 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 1,072,855,573.00RM 79,708,073.00RM 79,614,332.46
99.9%
RM 79,614,332.46JANM 2016, pp. 228–229
Labuan1 projectEstimate RM 18.95 m · Spent RM 18.94 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
19180Pembinaan JalanRM 38,203,943.00RM 18,950,000.00RM 18,940,938.83
100.0%
RM 18,940,938.83JANM 2016, pp. 228–229
BANGUNAN-BANGUNAN KERAJAAN (Selain daripada Perumahan)7 projectsEstimate RM 0.00 · Spent RM 0.00
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
11802SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
11803SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
12001SemenanjungRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
12003SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
12201SemenanjungRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
12202SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
12203Bangunan Gunasama Persekutuan ( di luar Kuala Lumpur) : SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
Kuari, Jentera, Workshop dan Stor Kerja Raya1 projectEstimate RM 6,400.00 · Spent RM 6,359.80
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
16001KuariRM 14,903,097.00RM 6,400.00RM 6,359.80
99.4%
RM 6,359.80JANM 2016, pp. 228–229
Perumahan Kerajaan5 projectsEstimate RM 0.00 · Spent RM 0.00
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
18101Rumah-rumah Pekerja/Rumah Kediaman PersekutuanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
18102SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
18104LabuanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
18302SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
18401SemenanjungRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 228–229
Projects printed without a group subtotal2 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
18610Komputer Kementerian Kerja RayaRM 39,000,000.00RM 3,264,200.00RM 3,259,361.73
99.8%
RM 3,259,361.73JANM 2016, pp. 228–229
18640Projek ICT Jabatan Kerja RayaRM 111,385,755.00RM 19,223,018.00RM 19,222,924.52
100.0%
RM 19,222,924.52JANM 2016, pp. 228–229

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2016, Statement of Development Expenditure (Lampiran 2).