Kementerian Sumber Asli dan Alam Sekitar
A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2017, by programme and activity, from the audited Statement of Operating Expenditure.
The same code is printed as Kementerian Air, Tanah dan Sumber Asli in 2018–2019, Kementerian Tenaga dan Sumber Asli in 2020–2022, Kementerian Sumber Asli, Alam Sekitar dan Perubahan Iklim in 2023 and Kementerian Sumber Asli dan Kelestarian Alam in 2024–2025.
All operating votes in 2017 · Development vote P.23 · B.23 in Budget 2027
By programme
Each programme's totals as the statement prints them. Hover a figure for the exact amount, or open an activity below for every line to the sen.
| CodeKod | ProgrammeProgram | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 010000 | Ibu Pejabat | RM 56.33 m | RM 55.20 m | RM 54.64 m | 99.0% | RM 564,108.38 | JANM 2017, p. 127 |
| 020000 | Pengurusan dan Perundangan Tanah | RM 64.33 m | RM 94.94 m | RM 91.75 m | 96.7% | RM 3.18 m | JANM 2017, p. 127 |
| 030000 | Ukur dan Pemetaan | RM 243.24 m | RM 243.24 m | RM 238.74 m | 98.2% | RM 4.50 m | JANM 2017, p. 128 |
| 040000 | Mineral dan Geosains | RM 62.86 m | RM 60.86 m | RM 59.15 m | 97.2% | RM 1.71 m | JANM 2017, p. 128 |
| 050000 | Perhutanan | RM 30.97 m | RM 30.78 m | RM 30.07 m | 97.7% | RM 710,410.68 | JANM 2017, p. 129 |
| 060000 | Alam Sekitar | RM 93.62 m | RM 101.42 m | RM 98.60 m | 97.2% | RM 2.82 m | JANM 2017, p. 129 |
| 070000 | Perlindungan Hidupan Liar dan Taman Negara (perhilitan) | RM 66.35 m | RM 70.24 m | RM 69.08 m | 98.3% | RM 1.16 m | JANM 2017, p. 129 |
| 080000 | Pengairan dan Saliran | RM 100.48 m | RM 95.30 m | RM 95.06 m | 99.8% | RM 238,678.41 | JANM 2017, p. 130 |
| 090000 | Taman Laut | RM 14.64 m | RM 14.64 m | RM 14.26 m | 97.4% | RM 385,173.15 | JANM 2017, p. 130 |
| 100000 | Biokeselamatan | RM 1.76 m | RM 1.76 m | RM 1.64 m | 93.4% | RM 115,979.37 | JANM 2017, p. 130 |
| 110000 | Institut Tanah dan Ukur Negara | RM 11.61 m | RM 11.53 m | RM 11.06 m | 95.9% | RM 469,416.37 | JANM 2017, p. 130 |
| 120000 | Institut Penyelidikan Hidraulik Kebangsaan Malaysia | RM 12.74 m | RM 12.74 m | RM 12.51 m | 98.2% | RM 229,510.18 | JANM 2017, p. 130 |
| 130000 | Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia | RM 53.01 m | RM 55.59 m | RM 55.59 m | 100.0% | RM 0.00 | JANM 2017, p. 131 |
| 140000 | Program Khusus | RM 7.41 m | RM 7.01 m | RM 6.49 m | 92.6% | RM 519,685.97 | JANM 2017, p. 131 |
| 150000 | Dasar Baru | RM 34.24 m | RM 8.78 m | RM 6.54 m | 74.5% | RM 2.24 m | JANM 2017, p. 131 |
| 160000 | "one-off" | RM 10.47 m | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2017, p. 131 |
Every activity, line by line
Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.
The 2017 statement prints the original budget, the revised budget and actual spending only, with no supplementary or virement columns.
010000Ibu Pejabat
010100Khidmat PengurusanRevised RM 37.92 mSpent RM 37.48 m98.8%
Activity total as printed: revised RM 37,918,303.00, spent RM 37,479,345.44 (JANM 2017, p. 126).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 22,523,000.00 | RM 20,016,355.00 | RM 19,950,309.92 | 99.7% | RM 66,045.08 | JANM 2017, p. 126 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 14,425,000.00 | RM 17,809,818.00 | RM 17,444,606.72 | 98.0% | RM 365,211.28 | JANM 2017, p. 126 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 91,200.00 | RM 91,200.00 | RM 83,498.80 | 91.6% | RM 7,701.20 | JANM 2017, p. 126 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 0.00 | RM 930.00 | RM 930.00 | 100.0% | RM 0.00 | JANM 2017, p. 126 |
010200Pengurusan Sumber AsliRevised RM 10.70 mSpent RM 10.64 m99.5%
Activity total as printed: revised RM 10,699,482.00, spent RM 10,640,583.18 (JANM 2017, p. 126).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 10,440,000.00 | RM 9,012,640.00 | RM 8,983,237.55 | 99.7% | RM 29,402.45 | JANM 2017, p. 126 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,398,800.00 | RM 1,196,242.00 | RM 1,168,070.15 | 97.6% | RM 28,171.85 | JANM 2017, p. 126 |
| 30000 | AssetsAset | RM 0.00 | RM 75,600.00 | RM 74,275.48 | 98.3% | RM 1,324.52 | JANM 2017, p. 126 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 455,000.00 | RM 415,000.00 | RM 415,000.00 | 100.0% | RM 0.00 | JANM 2017, p. 126 |
010300Pengurusan Alam SekitarRevised RM 6.59 mSpent RM 6.52 m99.0%
Activity total as printed: revised RM 6,585,985.00, spent RM 6,519,733.00 (JANM 2017, p. 127).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 5,051,800.00 | RM 4,778,320.00 | RM 4,722,384.64 | 98.8% | RM 55,935.36 | JANM 2017, p. 127 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 933,000.00 | RM 831,905.00 | RM 821,589.08 | 98.8% | RM 10,315.92 | JANM 2017, p. 127 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,009,600.00 | RM 975,760.00 | RM 975,759.28 | 100.0% | RM 0.72 | JANM 2017, p. 127 |
020000Pengurusan dan Perundangan Tanah
020100Khidmat Pengurusan dan Pembahagian PusakaRevised RM 17.66 mSpent RM 17.60 m99.7%
Activity total as printed: revised RM 17,659,642.00, spent RM 17,601,332.47 (JANM 2017, p. 127).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 15,029,100.00 | RM 15,044,100.00 | RM 15,042,674.83 | 100.0% | RM 1,425.17 | JANM 2017, p. 127 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,170,300.00 | RM 2,601,462.00 | RM 2,544,577.64 | 97.8% | RM 56,884.36 | JANM 2017, p. 127 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 35,000.00 | RM 14,080.00 | RM 14,080.00 | 100.0% | RM 0.00 | JANM 2017, p. 127 |
020200Kemajuan Pengurusan dan PerundanganRevised RM 6.51 mSpent RM 5.59 m85.8%
Activity total as printed: revised RM 6,511,669.00, spent RM 5,587,351.82 (JANM 2017, p. 127).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,422,300.00 | RM 5,786,075.00 | RM 4,861,758.37 | 84.0% | RM 924,316.63 | JANM 2017, p. 127 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,464,000.00 | RM 724,874.00 | RM 724,873.45 | 100.0% | RM 0.55 | JANM 2017, p. 127 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 10,000.00 | RM 720.00 | RM 720.00 | 100.0% | RM 0.00 | JANM 2017, p. 127 |
020300Penyelarasan dan Operasi TanahRevised RM 58.32 mSpent RM 58.02 m99.5%
Activity total as printed: revised RM 58,318,815.00, spent RM 58,019,987.76 (JANM 2017, p. 127).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 20,961,100.00 | RM 18,411,145.00 | RM 18,161,796.53 | 98.7% | RM 249,348.47 | JANM 2017, p. 127 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,735,000.00 | RM 4,010,415.00 | RM 3,961,273.61 | 98.8% | RM 49,141.39 | JANM 2017, p. 127 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 19,000.00 | RM 10,100.00 | RM 9,763.32 | 96.7% | RM 336.68 | JANM 2017, p. 127 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 0.00 | RM 35,887,155.00 | RM 35,887,154.30 | 100.0% | RM 0.70 | JANM 2017, p. 127 |
020400Pasukan Petugas KhasRevised RM 12.45 mSpent RM 10.54 m84.7%
Activity total as printed: revised RM 12,447,174.00, spent RM 10,543,943.17 (JANM 2017, p. 127).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 11,764,800.00 | RM 11,749,800.00 | RM 9,846,728.68 | 83.8% | RM 1,903,071.32 | JANM 2017, p. 127 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 441,500.00 | RM 382,074.00 | RM 381,999.07 | 100.0% | RM 74.93 | JANM 2017, p. 127 |
| 30000 | AssetsAset | RM 0.00 | RM 6,200.00 | RM 6,200.00 | 100.0% | RM 0.00 | JANM 2017, p. 127 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 280,000.00 | RM 309,100.00 | RM 309,015.42 | 100.0% | RM 84.58 | JANM 2017, p. 127 |
030000Ukur dan Pemetaan
030100Khidmat PengurusanRevised RM 9.53 mSpent RM 9.49 m99.6%
Activity total as printed: revised RM 9,532,155.00, spent RM 9,490,406.88 (JANM 2017, p. 127).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,430,100.00 | RM 4,851,200.00 | RM 4,828,725.94 | 99.5% | RM 22,474.06 | JANM 2017, p. 127 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,013,500.00 | RM 4,620,295.00 | RM 4,610,212.77 | 99.8% | RM 10,082.23 | JANM 2017, p. 127 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 40,000.00 | RM 60,660.00 | RM 51,468.17 | 84.8% | RM 9,191.83 | JANM 2017, p. 127 |
030200Perancangan dan KorporatRevised RM 5.94 mSpent RM 5.38 m90.6%
Activity total as printed: revised RM 5,944,100.00, spent RM 5,383,746.25 (JANM 2017, p. 127).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,131,000.00 | RM 4,129,500.00 | RM 3,570,119.89 | 86.5% | RM 559,380.11 | JANM 2017, p. 127 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,137,600.00 | RM 1,814,600.00 | RM 1,813,626.36 | 100.0% | RM 973.64 | JANM 2017, p. 127 |
030300KadasterRevised RM 141.90 mSpent RM 140.09 m98.7%
Activity total as printed: revised RM 141,902,840.00, spent RM 140,089,204.79 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 123,773,500.00 | RM 124,223,500.00 | RM 122,754,442.59 | 98.8% | RM 1,469,057.41 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 17,696,000.00 | RM 17,675,340.00 | RM 17,332,441.20 | 98.1% | RM 342,898.80 | JANM 2017, p. 128 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,000.00 | RM 1,000.00 | RM 1,000.00 | 100.0% | RM 0.00 | JANM 2017, p. 128 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 3,000.00 | RM 3,000.00 | RM 1,321.00 | 44.0% | RM 1,679.00 | JANM 2017, p. 128 |
030400PemetaanRevised RM 78.99 mSpent RM 77.51 m98.1%
Activity total as printed: revised RM 78,986,005.00, spent RM 77,506,301.51 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 64,140,700.00 | RM 63,269,600.00 | RM 62,261,638.08 | 98.4% | RM 1,007,961.92 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 16,913,600.00 | RM 15,716,405.00 | RM 15,244,663.43 | 97.0% | RM 471,741.57 | JANM 2017, p. 128 |
030500Geospatial Pertahanan (BGSP)Revised RM 6.88 mSpent RM 6.27 m91.2%
Activity total as printed: revised RM 6,877,300.00, spent RM 6,269,193.68 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 5,460,800.00 | RM 5,460,800.00 | RM 4,887,850.55 | 89.5% | RM 572,949.45 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,501,600.00 | RM 1,416,500.00 | RM 1,381,343.13 | 97.5% | RM 35,156.87 | JANM 2017, p. 128 |
040000Mineral dan Geosains
040100Korporat dan Ekonomi MineralRevised RM 7.25 mSpent RM 6.77 m93.4%
Activity total as printed: revised RM 7,250,600.00, spent RM 6,771,758.24 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,105,600.00 | RM 6,105,600.00 | RM 5,692,630.76 | 93.2% | RM 412,969.24 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 750,000.00 | RM 750,000.00 | RM 684,127.48 | 91.2% | RM 65,872.52 | JANM 2017, p. 128 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 395,000.00 | RM 395,000.00 | RM 395,000.00 | 100.0% | RM 0.00 | JANM 2017, p. 128 |
040200OperasiRevised RM 35.48 mSpent RM 35.19 m99.2%
Activity total as printed: revised RM 35,485,000.00, spent RM 35,193,560.43 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 33,662,600.00 | RM 32,622,600.00 | RM 32,331,470.07 | 99.1% | RM 291,129.93 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,822,400.00 | RM 2,862,400.00 | RM 2,862,090.36 | 100.0% | RM 309.64 | JANM 2017, p. 128 |
040300Perkhidmatan dan TeknikalRevised RM 11.11 mSpent RM 10.85 m97.7%
Activity total as printed: revised RM 11,106,600.00, spent RM 10,853,977.30 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 10,653,700.00 | RM 9,653,700.00 | RM 9,401,264.50 | 97.4% | RM 252,435.50 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,452,900.00 | RM 1,452,900.00 | RM 1,452,712.80 | 100.0% | RM 187.20 | JANM 2017, p. 128 |
040400Penyelidikan MineralRevised RM 7.02 mSpent RM 6.33 m90.2%
Activity total as printed: revised RM 7,018,200.00, spent RM 6,328,394.65 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,401,200.00 | RM 6,401,200.00 | RM 5,731,748.44 | 89.5% | RM 669,451.56 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 617,000.00 | RM 617,000.00 | RM 596,646.21 | 96.7% | RM 20,353.79 | JANM 2017, p. 128 |
050000Perhutanan
050100Dasar dan PengurusanRevised RM 9.77 mSpent RM 9.68 m99.1%
Activity total as printed: revised RM 9,768,603.00, spent RM 9,677,226.25 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 7,848,300.00 | RM 7,292,543.00 | RM 7,220,920.52 | 99.0% | RM 71,622.48 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,042,300.00 | RM 2,474,860.00 | RM 2,455,765.73 | 99.2% | RM 19,094.27 | JANM 2017, p. 128 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,000.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2017, p. 128 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 1,200.00 | RM 1,200.00 | RM 540.00 | 45.0% | RM 660.00 | JANM 2017, p. 128 |
050200Operasi HutanRevised RM 10.00 mSpent RM 9.81 m98.2%
Activity total as printed: revised RM 9,995,700.00, spent RM 9,814,123.62 (JANM 2017, p. 128).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,193,300.00 | RM 8,153,300.00 | RM 7,976,899.54 | 97.8% | RM 176,400.46 | JANM 2017, p. 128 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,646,900.00 | RM 1,624,900.00 | RM 1,619,866.38 | 99.7% | RM 5,033.62 | JANM 2017, p. 128 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 216,800.00 | RM 217,500.00 | RM 217,357.70 | 99.9% | RM 142.30 | JANM 2017, p. 128 |
050300Pembangunan HutanRevised RM 11.02 mSpent RM 10.58 m96.0%
Activity total as printed: revised RM 11,019,000.00, spent RM 10,581,542.45 (JANM 2017, p. 129).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 10,694,800.00 | RM 10,694,800.00 | RM 10,327,980.41 | 96.6% | RM 366,819.59 | JANM 2017, p. 129 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 324,200.00 | RM 324,200.00 | RM 253,562.04 | 78.2% | RM 70,637.96 | JANM 2017, p. 129 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,000.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2017, p. 129 |
060000Alam Sekitar
060100Pentadbiran dan Pengurusan AmRevised RM 5.94 mSpent RM 4.86 m81.8%
Activity total as printed: revised RM 5,944,900.00, spent RM 4,862,335.93 (JANM 2017, p. 129).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,004,900.00 | RM 4,004,900.00 | RM 3,129,234.23 | 78.1% | RM 875,665.77 | JANM 2017, p. 129 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 990,000.00 | RM 1,790,000.00 | RM 1,583,101.70 | 88.4% | RM 206,898.30 | JANM 2017, p. 129 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 163,000.00 | RM 150,000.00 | RM 150,000.00 | 100.0% | RM 0.00 | JANM 2017, p. 129 |
060200Pendidikan dan Penilaian Alam SekitarRevised RM 11.06 mSpent RM 10.33 m93.4%
Activity total as printed: revised RM 11,060,840.00, spent RM 10,327,763.66 (JANM 2017, p. 129).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,417,700.00 | RM 7,717,700.00 | RM 7,452,631.37 | 96.6% | RM 265,068.63 | JANM 2017, p. 129 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,128,500.00 | RM 3,128,500.00 | RM 2,664,550.51 | 85.2% | RM 463,949.49 | JANM 2017, p. 129 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 400,000.00 | RM 214,640.00 | RM 210,581.78 | 98.1% | RM 4,058.22 | JANM 2017, p. 129 |
060300Pengawasan dan PenguatkuasaanRevised RM 84.41 mSpent RM 83.41 m98.8%
Activity total as printed: revised RM 84,412,000.00, spent RM 83,412,081.83 (JANM 2017, p. 129).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 70,831,200.00 | RM 71,531,200.00 | RM 70,967,390.82 | 99.2% | RM 563,809.18 | JANM 2017, p. 129 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 5,687,000.00 | RM 12,880,800.00 | RM 12,444,691.01 | 96.6% | RM 436,108.99 | JANM 2017, p. 129 |
070000Perlindungan Hidupan Liar dan Taman Negara (perhilitan)
070100KonservasiRevised RM 52.11 mSpent RM 51.12 m98.1%
Activity total as printed: revised RM 52,109,786.00, spent RM 51,124,573.15 (JANM 2017, p. 129).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 40,479,800.00 | RM 41,041,557.00 | RM 41,041,421.87 | 100.0% | RM 135.13 | JANM 2017, p. 129 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 8,314,800.00 | RM 11,068,229.00 | RM 10,083,151.28 | 91.1% | RM 985,077.72 | JANM 2017, p. 129 |
070200OperasiRevised RM 18.13 mSpent RM 17.95 m99.0%
Activity total as printed: revised RM 18,129,131.00, spent RM 17,950,547.54 (JANM 2017, p. 129).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 13,792,600.00 | RM 13,792,600.00 | RM 13,745,892.76 | 99.7% | RM 46,707.24 | JANM 2017, p. 129 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,649,000.00 | RM 4,231,573.00 | RM 4,109,489.76 | 97.1% | RM 122,083.24 | JANM 2017, p. 129 |
| 30000 | AssetsAset | RM 0.00 | RM 34,958.00 | RM 34,957.88 | 100.0% | RM 0.12 | JANM 2017, p. 129 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 110,000.00 | RM 70,000.00 | RM 60,207.14 | 86.0% | RM 9,792.86 | JANM 2017, p. 129 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 500.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2017, p. 129 |
080000Pengairan dan Saliran
080100Perkhidmatan PengurusanRevised RM 23.87 mSpent RM 23.85 m100.0%
Activity total as printed: revised RM 23,865,102.00, spent RM 23,852,971.93 (JANM 2017, p. 129).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 21,264,900.00 | RM 18,310,700.00 | RM 18,305,207.68 | 100.0% | RM 5,492.32 | JANM 2017, p. 129 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 5,612,000.00 | RM 5,552,000.00 | RM 5,545,363.05 | 99.9% | RM 6,636.95 | JANM 2017, p. 129 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 15,000.00 | RM 2,402.00 | RM 2,401.20 | 100.0% | RM 0.80 | JANM 2017, p. 129 |
080200Perkhidmatan TeknikalRevised RM 71.44 mSpent RM 71.21 m99.7%
Activity total as printed: revised RM 71,438,388.00, spent RM 71,211,839.66 (JANM 2017, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 54,798,200.00 | RM 53,141,670.00 | RM 53,060,621.95 | 99.8% | RM 81,048.05 | JANM 2017, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 18,787,000.00 | RM 18,115,118.00 | RM 17,976,637.71 | 99.2% | RM 138,480.29 | JANM 2017, p. 130 |
| 30000 | AssetsAset | RM 0.00 | RM 181,600.00 | RM 174,580.00 | 96.1% | RM 7,020.00 | JANM 2017, p. 130 |
090000Taman Laut
090100Taman LautRevised RM 14.64 mSpent RM 14.26 m97.4%
Activity total as printed: revised RM 14,644,700.00, spent RM 14,259,526.85 (JANM 2017, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 10,360,900.00 | RM 10,360,900.00 | RM 10,188,045.33 | 98.3% | RM 172,854.67 | JANM 2017, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 4,277,000.00 | RM 4,277,000.00 | RM 4,067,221.52 | 95.1% | RM 209,778.48 | JANM 2017, p. 130 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 6,800.00 | RM 6,800.00 | RM 4,260.00 | 62.6% | RM 2,540.00 | JANM 2017, p. 130 |
100000Biokeselamatan
100100BiokeselamatanRevised RM 1.76 mSpent RM 1.64 m93.4%
Activity total as printed: revised RM 1,760,950.00, spent RM 1,644,970.63 (JANM 2017, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,564,300.00 | RM 1,564,300.00 | RM 1,453,327.91 | 92.9% | RM 110,972.09 | JANM 2017, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 196,400.00 | RM 191,770.00 | RM 186,782.72 | 97.4% | RM 4,987.28 | JANM 2017, p. 130 |
| 30000 | AssetsAset | RM 0.00 | RM 4,880.00 | RM 4,860.00 | 99.6% | RM 20.00 | JANM 2017, p. 130 |
110000Institut Tanah dan Ukur Negara
110100Institut Tanah dan Ukur NegaraRevised RM 11.53 mSpent RM 11.06 m95.9%
Activity total as printed: revised RM 11,532,100.00, spent RM 11,062,683.63 (JANM 2017, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,092,800.00 | RM 7,870,001.00 | RM 7,506,335.62 | 95.4% | RM 363,665.38 | JANM 2017, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,510,000.00 | RM 3,657,799.00 | RM 3,552,048.01 | 97.1% | RM 105,750.99 | JANM 2017, p. 130 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 4,300.00 | RM 4,300.00 | RM 4,300.00 | 100.0% | RM 0.00 | JANM 2017, p. 130 |
120000Institut Penyelidikan Hidraulik Kebangsaan Malaysia
120100Institut Penyelidikan Hidraulik Kebangsaan MalaysiaRevised RM 12.74 mSpent RM 12.51 m98.2%
Activity total as printed: revised RM 12,742,230.00, spent RM 12,512,719.82 (JANM 2017, p. 130).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 10,357,000.00 | RM 10,373,825.00 | RM 10,208,005.02 | 98.4% | RM 165,819.98 | JANM 2017, p. 130 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,355,400.00 | RM 2,329,404.00 | RM 2,265,894.67 | 97.3% | RM 63,509.33 | JANM 2017, p. 130 |
| 30000 | AssetsAset | RM 0.00 | RM 25,996.00 | RM 25,996.00 | 100.0% | RM 0.00 | JANM 2017, p. 130 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 23,000.00 | RM 13,005.00 | RM 12,824.13 | 98.6% | RM 180.87 | JANM 2017, p. 130 |
130000Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia
130100Lembaga Penyelidikan dan Pembangunan Perhutanan MalaysiaRevised RM 55.59 mSpent RM 55.59 m100.0%
Activity total as printed: revised RM 55,594,600.00, spent RM 55,594,600.00 (JANM 2017, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 53,005,500.00 | RM 55,594,600.00 | RM 55,594,600.00 | 100.0% | RM 0.00 | JANM 2017, p. 131 |
140000Program Khusus
140100Bertugas ke Luar NegaraRevised RM 2.34 mSpent RM 1.96 m83.6%
Activity total as printed: revised RM 2,343,600.00, spent RM 1,960,190.28 (JANM 2017, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,343,600.00 | RM 2,273,600.00 | RM 1,890,190.28 | 83.1% | RM 383,409.72 | JANM 2017, p. 131 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 0.00 | RM 70,000.00 | RM 70,000.00 | 100.0% | RM 0.00 | JANM 2017, p. 131 |
140200Emolumen Kakitangan KontrakRevised RM 576,800.00Spent RM 489,076.2984.8%
Activity total as printed: revised RM 576,800.00, spent RM 489,076.29 (JANM 2017, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 946,800.00 | RM 576,800.00 | RM 489,076.29 | 84.8% | RM 87,723.71 | JANM 2017, p. 131 |
140300Program Konservasi Antarabangsa Giant PandaRevised RM 4.09 mSpent RM 4.04 m98.8%
Activity total as printed: revised RM 4,087,000.00, spent RM 4,038,447.46 (JANM 2017, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 217,000.00 | RM 187,000.00 | RM 138,447.46 | 74.0% | RM 48,552.54 | JANM 2017, p. 131 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,900,000.00 | RM 3,900,000.00 | RM 3,900,000.00 | 100.0% | RM 0.00 | JANM 2017, p. 131 |
150000Dasar Baru
150100Kenaikan Gaji TahunanRevised RM 8.78 mSpent RM 6.54 m74.5%
Activity total as printed: revised RM 8,781,300.00, spent RM 6,542,567.53 (JANM 2017, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 34,240,400.00 | RM 8,781,300.00 | RM 6,542,567.53 | 74.5% | RM 2,238,732.47 | JANM 2017, p. 131 |
160000"one-off"
160100JkptgRevised RM 0.00Spent RM 0.000.0%
Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2017, p. 131).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 10,467,200.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2017, p. 131 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2017, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.