Kementerian Pertanian dan Industri Asas Tani
A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2016, from the audited Statement of Development Expenditure.
The same code is printed as Kementerian Pertanian dan Industri Makanan in 2020–2022 and Kementerian Pertanian dan Keterjaminan Makanan in 2023–2025.
All development votes in 2016 · Operating vote B.21 · P.21 in Budget 2027
By group
The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.
| Group | Estimate 2016Anggaran | Spent 2016Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|
| Ibu Pejabat | RM 777.00 m | RM 729.61 m | 93.9% | RM 729.61 m | JANM 2016, pp. 218–219 |
| Pertanian | RM 112.05 m | RM 91.41 m | 81.6% | RM 91.41 m | JANM 2016, pp. 218–219 |
| Perkhidmatan Veterinar | RM 62.26 m | RM 47.06 m | 75.6% | RM 47.06 m | JANM 2016, pp. 220–221 |
| Perikanan | RM 63.92 m | RM 61.00 m | 95.4% | RM 61.00 m | JANM 2016, pp. 220–221 |
Every project
Each project exactly as printed, to the sen, with the two-page spread it was read from.
Ibu Pejabat38 projectsEstimate RM 777.00 m · Spent RM 729.61 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2016Anggaran | Spent 2016Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 00100 | Lembaga Pemasaran Pertanian Persekutuan (FAMA) | RM 274,900,000.00 | RM 39,950,000.00 | RM 33,778,099.00 | 84.5% | RM 33,778,099.00 | JANM 2016, pp. 218–219 |
| 00203 | Bank Pertanian Malaysia (BPM) | RM 500,000,000.00 | RM 35,000,000.00 | RM 35,000,000.00 | 100.0% | RM 35,000,000.00 | JANM 2016, pp. 218–219 |
| 00300 | Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI) | RM 221,525,694.00 | RM 39,431,600.00 | RM 39,431,600.00 | 100.0% | RM 39,431,600.00 | JANM 2016, pp. 218–219 |
| 00400 | Lembaga Perindustrian Nanas Malaysia (LPNM) | RM 104,250,000.00 | RM 25,000,000.00 | RM 25,000,000.00 | 100.0% | RM 25,000,000.00 | JANM 2016, pp. 218–219 |
| 00500 | Lembaga Kemajuan Ikan Malaysia (LKIM) | RM 851,336,000.00 | RM 33,100,000.00 | RM 33,100,000.00 | 100.0% | RM 33,100,000.00 | JANM 2016, pp. 218–219 |
| 00600 | Lembaga Kemajuan Pertanian Kemubu (KADA) | RM 161,060,000.00 | RM 25,760,000.00 | RM 25,760,000.00 | 100.0% | RM 25,760,000.00 | JANM 2016, pp. 218–219 |
| 00700 | Lembaga Pertubuhan Peladang (LPP) | RM 164,896,251.00 | RM 32,350,000.00 | RM 32,350,000.00 | 100.0% | RM 32,350,000.00 | JANM 2016, pp. 218–219 |
| 00800 | Lembaga Kemajuan Pertanian Muda (MADA) | RM 95,690,000.00 | RM 17,695,000.00 | RM 17,695,000.00 | 100.0% | RM 17,695,000.00 | JANM 2016, pp. 218–219 |
| 00900 | Projek Pertanian yang Lain | RM 350,183,268.00 | RM 45,244,972.00 | RM 45,244,967.47 | 100.0% | RM 45,244,967.47 | JANM 2016, pp. 218–219 |
| 01000 | Projek-projek Pembangunan Pertanian Bersepadu | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 01100 | Projek Pertanian Bersepadu Barat Laut Selangor | RM 10,500,000.00 | RM 2,607,995.00 | RM 2,607,982.68 | 100.0% | RM 2,607,982.68 | JANM 2016, pp. 218–219 |
| 01200 | Projek Pertanian Seberang Perak | RM 10,750,000.00 | RM 2,154,400.00 | RM 2,154,366.61 | 100.0% | RM 2,154,366.61 | JANM 2016, pp. 218–219 |
| 01300 | Projek Pertanian Bersepadu Krian/Sg. Manik | RM 33,000,000.00 | RM 6,980,000.00 | RM 6,850,009.11 | 98.1% | RM 6,850,009.11 | JANM 2016, pp. 218–219 |
| 01400 | IADA Kemasin Semerak | RM 9,725,000.00 | RM 2,025,000.00 | RM 1,967,745.40 | 97.2% | RM 1,967,745.40 | JANM 2016, pp. 218–219 |
| 01500 | Projek Pertanian Bersepadu Terengganu Utara | RM 8,500,000.00 | RM 1,700,000.00 | RM 1,689,767.26 | 99.4% | RM 1,689,767.26 | JANM 2016, pp. 218–219 |
| 01600 | IADA Pulau Pinang | RM 30,500,000.00 | RM 7,000,000.00 | RM 6,920,810.41 | 98.9% | RM 6,920,810.41 | JANM 2016, pp. 218–219 |
| 01700 | IADA Kalaka Saribas | RM 54,700,000.00 | RM 9,900,000.00 | RM 8,796,782.15 | 88.9% | RM 8,796,782.15 | JANM 2016, pp. 218–219 |
| 01800 | IADA Samarahan | RM 28,750,000.00 | RM 4,850,000.00 | RM 4,737,551.48 | 97.7% | RM 4,737,551.48 | JANM 2016, pp. 218–219 |
| 01910 | IADA Pekan | RM 292,520,000.00 | RM 20,982,200.00 | RM 20,426,654.58 | 97.3% | RM 20,426,654.58 | JANM 2016, pp. 218–219 |
| 01920 | IADA Rompin | RM 145,775,000.00 | RM 13,910,000.00 | RM 11,628,348.98 | 83.6% | RM 11,628,348.98 | JANM 2016, pp. 218–219 |
| 01930 | IADA Kota Belut | RM 357,100,000.00 | RM 50,010,000.00 | RM 41,747,743.31 | 83.5% | RM 41,747,743.31 | JANM 2016, pp. 218–219 |
| 01940 | IADA Batang Lupur | RM 496,400,000.00 | RM 59,950,000.00 | RM 58,907,431.98 | 98.3% | RM 58,907,431.98 | JANM 2016, pp. 218–219 |
| 12700 | Projek Empangan Paya Peda, Terengganu | RM 424,700,000.00 | RM 6,132,100.00 | RM 5,887,102.13 | 96.0% | RM 5,887,102.13 | JANM 2016, pp. 218–219 |
| 12800 | Pemodenan Sistem Pengairan Padi | RM 1,236,723,374.00 | RM 121,763,200.00 | RM 112,593,115.57 | 92.5% | RM 112,593,115.57 | JANM 2016, pp. 218–219 |
| 12900 | Program Pembangunan Punca Air | RM 450,306,905.00 | RM 37,200,000.00 | RM 30,548,858.06 | 82.1% | RM 30,548,858.06 | JANM 2016, pp. 218–219 |
| 14700 | Program Pembangunan Zon Pantai Utk Kwsn Tanaman/Perikanan Pelbagai Negeri | RM 126,200,000.00 | RM 9,300,000.00 | RM 6,935,360.88 | 74.6% | RM 6,935,360.88 | JANM 2016, pp. 218–219 |
| 14800 | Pembinaan dan Pembaikan Jalan Ladang | RM 156,956,000.00 | RM 23,052,000.00 | RM 22,533,761.52 | 97.8% | RM 22,533,761.52 | JANM 2016, pp. 218–219 |
| 15400 | Rancangan Pembangunan Sistem Saliran Pertanian | RM 93,000,000.00 | RM 22,250,000.00 | RM 20,586,301.39 | 92.5% | RM 20,586,301.39 | JANM 2016, pp. 218–219 |
| 15500 | Program Menaiktaraf Sistem Saliran Pertanian | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 15600 | Program Kawalan Banjir Kawasan Pertanian | RM 51,240,000.00 | RM 5,300,000.00 | RM 3,971,604.90 | 74.9% | RM 3,971,604.90 | JANM 2016, pp. 218–219 |
| 15700 | Rancangan-rancangan Pengairan, Sarawak s | RM 37,600,000.00 | RM 5,761,000.00 | RM 5,760,947.72 | 100.0% | RM 5,760,947.72 | JANM 2016, pp. 218–219 |
| 15800 | Rancangan-rancangan Saliran, Sarawak sNote: P.21 – Butiran 15800 - Peruntukan sebanyak RM10 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan. | RM 6,400,000.00 | RM 784,710.00 | RM 784,676.24 | 100.0% | RM 784,676.24 | JANM 2016, pp. 218–219 |
| 16600 | Rancangan-rancangan Pengairan, Sabah s | RM 38,000,000.00 | RM 1,200,000.00 | RM 959,880.00 | 80.0% | RM 959,880.00 | JANM 2016, pp. 218–219 |
| 16700 | Rancangan-rancangan Saliran, Sabah s | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 90100 | Dasar Perancangan Strategik (DPS) | RM 68,500,000.00 | RM 8,868,300.00 | RM 7,069,653.70 | 79.7% | RM 7,069,653.70 | JANM 2016, pp. 218–219 |
| 90200 | Industri Tanaman, Ternakan dan Perikanan (ITTP) | RM 46,600,000.00 | RM 6,790,000.00 | RM 6,309,462.15 | 92.9% | RM 6,309,462.15 | JANM 2016, pp. 218–219 |
| 90300 | Perkhidmatan Industri dan Ekonomi Bumiputera (PIEB) | RM 454,000,000.00 | RM 53,000,000.00 | RM 49,874,185.63 | 94.1% | RM 49,874,185.63 | JANM 2016, pp. 218–219 |
| 90800 | Pengurusan Maklumat (BPM) | RM 2,430,000.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 |
Pertanian16 projectsEstimate RM 112.05 m · Spent RM 91.41 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2016Anggaran | Spent 2016Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 02000 | Program Pembangunan Komoditi Tanaman | RM 77,331,500.00 | RM 16,595,000.00 | RM 7,180,024.84 | 43.3% | RM 7,180,024.84 | JANM 2016, pp. 218–219 |
| 02100 | Program Penyelidikan | RM 2,750,000.00 | RM 250,000.00 | RM 250,000.00 | 100.0% | RM 250,000.00 | JANM 2016, pp. 218–219 |
| 02200 | Perkhidmatan Pengembangan Pertanian | RM 8,000,000.00 | RM 1,155,000.00 | RM 35,476.23 | 3.1% | RM 35,476.23 | JANM 2016, pp. 218–219 |
| 02300 | Program Latihan | RM 11,500,000.00 | RM 2,696,000.00 | RM 2,643,060.96 | 98.0% | RM 2,643,060.96 | JANM 2016, pp. 218–219 |
| 02400 | Pengawasan dan Pembangunan Komoditi | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 02500 | Kemudahan Pembangunan Komoditi | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 03300 | Kompleks Pertanian | RM 31,545,000.00 | RM 2,608,675.00 | RM 1,679,332.68 | 64.4% | RM 1,679,332.68 | JANM 2016, pp. 218–219 |
| 03500 | Pembangunan Industri Bunga dan Komoditi Berpotensi | RM 18,000,000.00 | RM 5,000,000.00 | RM 4,645,613.20 | 92.9% | RM 4,645,613.20 | JANM 2016, pp. 218–219 |
| 03700 | Khidmat Sokongan Teknikal | RM 54,450,000.00 | RM 8,300,000.00 | RM 8,060,242.13 | 97.1% | RM 8,060,242.13 | JANM 2016, pp. 218–219 |
| 04000 | Pembangunan Mempelbagai Pertanian | RM 64,700,000.00 | RM 8,157,000.00 | RM 6,466,646.22 | 79.3% | RM 6,466,646.22 | JANM 2016, pp. 218–219 |
| 04700 | Pembangunan Industri Padi | RM 64,500,000.00 | RM 6,500,000.00 | RM 1,495,460.30 | 23.0% | RM 1,495,460.30 | JANM 2016, pp. 218–219 |
| 04800 | Pembangunan Industri Kelapa | RM 23,000,000.00 | RM 4,283,800.00 | RM 4,211,553.02 | 98.3% | RM 4,211,553.02 | JANM 2016, pp. 218–219 |
| 04900 | Pembangunan Industri Buah-buahan | RM 30,000,000.00 | RM 3,000,000.00 | RM 2,386,946.94 | 79.6% | RM 2,386,946.94 | JANM 2016, pp. 218–219 |
| 05100 | Kurantina Tumbuhan Sarawak | RM 5,000,000.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 05200 | Pembangunan Penyelidikan Pertanian Sarawak | RM 5,000,000.00 | RM 1,000,000.00 | RM 992,691.60 | 99.3% | RM 992,691.60 | JANM 2016, pp. 218–219 |
| 12500 | Pembangunan Industri Tanaman Makanan | RM 224,000,000.00 | RM 52,500,000.00 | RM 51,363,572.31 | 97.8% | RM 51,363,572.31 | JANM 2016, pp. 218–219 |
Perkhidmatan Veterinar35 projectsEstimate RM 62.26 m · Spent RM 47.06 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2016Anggaran | Spent 2016Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10700 | Pembangunan Industri Ayam | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 10710 | Pembangunan Industri Lembu/Kerbau Pedaging | RM 50,825,000.00 | RM 3,660,000.00 | RM 1,414,699.80 | 38.6% | RM 1,414,699.80 | JANM 2016, pp. 218–219 |
| 10720 | Pembangunan Industri Kambing/Bebiri | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 10730 | Pembangunan Industri Tenusu | RM 10,000,000.00 | RM 7,700,000.00 | RM 223,178.00 | 2.9% | RM 223,178.00 | JANM 2016, pp. 218–219 |
| 10740 | Pembangunan Industri Babi | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 218–219 | |
| 10750 | Pengeluaran Bibit dan Baka Lembu | RM 11,300,000.00 | RM 4,536,800.00 | RM 4,536,759.53 | 100.0% | RM 4,536,759.53 | JANM 2016, pp. 218–219 |
| 10760 | Pengeluaran Bibit dan Baka Ternakan Kambing Bebiri | RM 3,200,000.00 | RM 1,794,200.00 | RM 1,794,105.50 | 100.0% | RM 1,794,105.50 | JANM 2016, pp. 218–219 |
| 10770 | Pengeluaran Baka dan Ternakan Itik | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 10790 | Pengukuhan Perkhidmatan Genetik Ternakan | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 10800 | Pembangunan Tek. Pengeluaran Benih/Bhn Makanan Ternakan | RM 0.00 | RM 2,000,000.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2016, pp. 220–221 |
| 10810 | Menaik Taraf dan Pembesaran Stesen Kuarantin Haiwan (SKH) Padang Besar PerlisNote: P.21 – Butiran 10810 dan 23000, - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan. | RM 4,990,500.00 | RM 307,010.00 | RM 307,000.00 | 100.0% | RM 307,000.00 | JANM 2016, pp. 220–221 |
| 10820 | Makmal-makmal Veterinar Kawasan | RM 3,800,000.00 | RM 200,000.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2016, pp. 220–221 |
| 10830 | Kawalan dan Pembasmian Penyakit Haiwan | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 10860 | Pembangunan Semula Rumah Sembelih Ruminan | RM 4,005,000.00 | RM 850,000.00 | RM 704,450.58 | 82.9% | RM 704,450.58 | JANM 2016, pp. 220–221 |
| 10880 | Menaiktaraf Kemudahan Latihan | RM 84,500,000.00 | RM 14,741,792.00 | RM 13,763,417.17 | 93.4% | RM 13,763,417.17 | JANM 2016, pp. 220–221 |
| 10890 | Pembangunan Semula Pusat Latihan Ternakan Ayam Melaka | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 10900 | Pembangunan Program Latihan | RM 6,600,000.00 | RM 1,320,000.00 | RM 1,291,720.00 | 97.9% | RM 1,291,720.00 | JANM 2016, pp. 220–221 |
| 10920 | Pengukuhan Penyelidikan dan Pembangunan (R & D) | RM 1,500,000.00 | RM 350,000.00 | RM 244,316.00 | 69.8% | RM 244,316.00 | JANM 2016, pp. 220–221 |
| 10930 | Sistem Maklumat Pengurusan Veterinar | RM 4,000,000.00 | RM 500,000.00 | RM 499,567.39 | 99.9% | RM 499,567.39 | JANM 2016, pp. 220–221 |
| 11010 | Santuari Haiwan Eksotik | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 11030 | Beef Valley | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 21000 | Pembangunan Kawasan Ternakan Khinzir Sarawak | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 21600 | Pembangunan Tanah untuk DPN3 s | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 21700 | Projek Ternakan Lembu Tenusu | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 21900 | Projek Itik | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 22000 | Stesen Kuarantina Haiwan Sarawak | RM 2,000,000.00 | RM 1,800,000.00 | RM 471,055.85 | 26.2% | RM 471,055.85 | JANM 2016, pp. 220–221 |
| 22100 | Projek Epidemologi Veterinar | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 22300 | Kawasan Penternakan Babi s | RM 31,000,000.00 | RM 6,000,000.00 | RM 6,000,000.00 | 100.0% | RM 6,000,000.00 | JANM 2016, pp. 220–221 |
| 22500 | Projek Lembu Pedaging s | RM 63,604,000.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 24800 | Pembangunan Industri Rumpai Laut | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 25000 | Pusat Pengeluaran, Penyelidikan dan Latihan Haiwan Sarawak | RM 9,000,000.00 | RM 1,800,000.00 | RM 1,799,713.15 | 100.0% | RM 1,799,713.15 | JANM 2016, pp. 220–221 |
| 26000 | Pembangunan Ternakan Sarawak | RM 41,000,000.00 | RM 7,950,000.00 | RM 7,366,392.14 | 92.7% | RM 7,366,392.14 | JANM 2016, pp. 220–221 |
| 28000 | Makmal Penyelidikan Penyakit | RM 18,290,000.00 | RM 300,000.00 | RM 222,094.52 | 74.0% | RM 222,094.52 | JANM 2016, pp. 220–221 |
| 29000 | Kesihatan Awam Veterinar | RM 1,500,000.00 | RM 250,000.00 | RM 249,997.04 | 100.0% | RM 249,997.04 | JANM 2016, pp. 220–221 |
| 41800 | Jabatan Perkhidmatan Haiwan dan Perusahaan Ternak (JPHPT) | RM 39,000,000.00 | RM 6,200,000.00 | RM 6,175,284.00 | 99.6% | RM 6,175,284.00 | JANM 2016, pp. 220–221 |
Perikanan22 projectsEstimate RM 63.92 m · Spent RM 61.00 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2016Anggaran | Spent 2016Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 22501 | Penyelidikan | RM 117,750,000.00 | RM 12,690,000.00 | RM 12,259,522.51 | 96.6% | RM 12,259,522.51 | JANM 2016, pp. 220–221 |
| 22502 | Kemudahan Penyelidikan | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 22503 | Peningkatan Kualiti Stok Akuakultur | RM 31,000,000.00 | RM 2,300,000.00 | RM 2,211,354.03 | 96.2% | RM 2,211,354.03 | JANM 2016, pp. 220–221 |
| 22504 | Rangkaian Institut Latihan Akuakultur Malaysia (ILHAM) | RM 40,000,000.00 | RM 4,722,000.00 | RM 4,574,492.08 | 96.9% | RM 4,574,492.08 | JANM 2016, pp. 220–221 |
| 22600 | Perkhidmatan Perkembangan Perikanan | RM 50,000,000.00 | RM 7,000,000.00 | RM 6,791,055.16 | 97.0% | RM 6,791,055.16 | JANM 2016, pp. 220–221 |
| 22700 | Perkhidmatan Pentadbiran | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 22800 | Teknologi Maklumat | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 23000 | Pembangunan Kemudahan Latihan Kolej Perikanan Malaysia Lumut PerakNote: P.21 – Butiran 10810 dan 23000, - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan. | RM 6,000,000.00 | RM 50,010.00 | RM 45,905.68 | 91.8% | RM 45,905.68 | JANM 2016, pp. 220–221 |
| 23300 | Pengurusan dan Pemulihan Ikan | RM 41,000,000.00 | RM 4,400,000.00 | RM 4,380,576.09 | 99.6% | RM 4,380,576.09 | JANM 2016, pp. 220–221 |
| 23400 | Kemudahan Perikanan | RM 29,567,000.00 | RM 10,370,000.00 | RM 9,627,844.01 | 92.8% | RM 9,627,844.01 | JANM 2016, pp. 220–221 |
| 23500 | Pengembangan dan Didikan | RM 21,430,000.00 | RM 3,430,000.00 | RM 3,349,351.14 | 97.7% | RM 3,349,351.14 | JANM 2016, pp. 220–221 |
| 23702 | Pengurusan dan Perlindungan Sumber Perikanan | RM 28,580,000.00 | RM 4,070,000.00 | RM 4,057,337.70 | 99.7% | RM 4,057,337.70 | JANM 2016, pp. 220–221 |
| 24000 | Kemudahan Lampu Pemandu dan Penambatan Vesel | RM 16,370,000.00 | RM 6,200,000.00 | RM 6,102,694.05 | 98.4% | RM 6,102,694.05 | JANM 2016, pp. 220–221 |
| 24700 | Pusat Penyelidikan Perikanan Likas | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 25100 | Pusat Pembenihan Perikanan Sabah | RM 2,900,000.00 | RM 1,140,000.00 | RM 964,113.85 | 84.6% | RM 964,113.85 | JANM 2016, pp. 220–221 |
| 25200 | Pembangunan Akuakultur Sabah | RM 2,500,000.00 | RM 500,000.00 | RM 495,651.05 | 99.1% | RM 495,651.05 | JANM 2016, pp. 220–221 |
| 26400 | Peningkatan Produktiviti dan Pemuliharaan Ekosistem | RM 15,000,000.00 | RM 2,000,000.00 | RM 1,925,583.64 | 96.3% | RM 1,925,583.64 | JANM 2016, pp. 220–221 |
| 26500 | Latihan Penternak Akuakultur Marin dan Air Tawar | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 26900 | Pemantauan Maklumat Industri Perikanan | RM 5,230,000.00 | RM 1,200,000.00 | RM 1,192,485.88 | 99.4% | RM 1,192,485.88 | JANM 2016, pp. 220–221 |
| 27100 | Pembangunan Pejabat Perikanan | RM 2,500,000.00 | RM 1,500,000.00 | RM 701,581.28 | 46.8% | RM 701,581.28 | JANM 2016, pp. 220–221 |
| 27200 | Pembangunan Industri Tiram Sabah | RM 9,280,000.00 | RM 1,950,000.00 | RM 1,933,813.26 | 99.2% | RM 1,933,813.26 | JANM 2016, pp. 220–221 |
| 27400 | Pembangunan Usahawan Nelayan/Pengusaha | RM 2,000,000.00 | RM 400,000.00 | RM 391,372.83 | 97.8% | RM 391,372.83 | JANM 2016, pp. 220–221 |
Projects printed without a group subtotal3 projects
These projects count toward the vote total but are not printed under a group heading.
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2016Anggaran | Spent 2016Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 30000 | Tabung Ekonomi Usaha Niaga (TEKUN) | RM 1,350,000,000.00 | RM 200,000,000.00 | RM 200,000,000.00 | 100.0% | RM 200,000,000.00 | JANM 2016, pp. 220–221 |
| 86000 | Strategic Reform Initiatives | RM 0.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2016, pp. 220–221 | |
| 94000 | NKEANote: P.21 – Butiran 94000 - Peruntukan sebanyak RM5,000,000 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan. | RM 5,665,149,885.00 | RM 389,950,566.00 | RM 372,370,271.23 | 95.5% | RM 372,370,271.23 | JANM 2016, pp. 220–221 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2016, Statement of Development Expenditure (Lampiran 2).