A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2016, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Pertanian dan Industri Makanan in 2020–2022 and Kementerian Pertanian dan Keterjaminan Makanan in 2023–2025.

All development votes in 2016 · Operating vote B.21 · P.21 in Budget 2027

Estimate 2016Anggaran
RM 1.61 bn
Spent 2016Sebenar
RM 1.50 bn
93.5% of the estimate; RM 35.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 15.84 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 1.50 bn
Totals as printed, JANM 2016, pp. 220–221

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
Ibu PejabatRM 777.00 mRM 729.61 m
93.9%
RM 729.61 mJANM 2016, pp. 218–219
PertanianRM 112.05 mRM 91.41 m
81.6%
RM 91.41 mJANM 2016, pp. 218–219
Perkhidmatan VeterinarRM 62.26 mRM 47.06 m
75.6%
RM 47.06 mJANM 2016, pp. 220–221
PerikananRM 63.92 mRM 61.00 m
95.4%
RM 61.00 mJANM 2016, pp. 220–221

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Ibu Pejabat38 projectsEstimate RM 777.00 m · Spent RM 729.61 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
00100Lembaga Pemasaran Pertanian Persekutuan (FAMA)RM 274,900,000.00RM 39,950,000.00RM 33,778,099.00
84.5%
RM 33,778,099.00JANM 2016, pp. 218–219
00203Bank Pertanian Malaysia (BPM)RM 500,000,000.00RM 35,000,000.00RM 35,000,000.00
100.0%
RM 35,000,000.00JANM 2016, pp. 218–219
00300Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI)RM 221,525,694.00RM 39,431,600.00RM 39,431,600.00
100.0%
RM 39,431,600.00JANM 2016, pp. 218–219
00400Lembaga Perindustrian Nanas Malaysia (LPNM)RM 104,250,000.00RM 25,000,000.00RM 25,000,000.00
100.0%
RM 25,000,000.00JANM 2016, pp. 218–219
00500Lembaga Kemajuan Ikan Malaysia (LKIM)RM 851,336,000.00RM 33,100,000.00RM 33,100,000.00
100.0%
RM 33,100,000.00JANM 2016, pp. 218–219
00600Lembaga Kemajuan Pertanian Kemubu (KADA)RM 161,060,000.00RM 25,760,000.00RM 25,760,000.00
100.0%
RM 25,760,000.00JANM 2016, pp. 218–219
00700Lembaga Pertubuhan Peladang (LPP)RM 164,896,251.00RM 32,350,000.00RM 32,350,000.00
100.0%
RM 32,350,000.00JANM 2016, pp. 218–219
00800Lembaga Kemajuan Pertanian Muda (MADA)RM 95,690,000.00RM 17,695,000.00RM 17,695,000.00
100.0%
RM 17,695,000.00JANM 2016, pp. 218–219
00900Projek Pertanian yang LainRM 350,183,268.00RM 45,244,972.00RM 45,244,967.47
100.0%
RM 45,244,967.47JANM 2016, pp. 218–219
01000Projek-projek Pembangunan Pertanian BersepaduRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
01100Projek Pertanian Bersepadu Barat Laut SelangorRM 10,500,000.00RM 2,607,995.00RM 2,607,982.68
100.0%
RM 2,607,982.68JANM 2016, pp. 218–219
01200Projek Pertanian Seberang PerakRM 10,750,000.00RM 2,154,400.00RM 2,154,366.61
100.0%
RM 2,154,366.61JANM 2016, pp. 218–219
01300Projek Pertanian Bersepadu Krian/Sg. ManikRM 33,000,000.00RM 6,980,000.00RM 6,850,009.11
98.1%
RM 6,850,009.11JANM 2016, pp. 218–219
01400IADA Kemasin SemerakRM 9,725,000.00RM 2,025,000.00RM 1,967,745.40
97.2%
RM 1,967,745.40JANM 2016, pp. 218–219
01500Projek Pertanian Bersepadu Terengganu UtaraRM 8,500,000.00RM 1,700,000.00RM 1,689,767.26
99.4%
RM 1,689,767.26JANM 2016, pp. 218–219
01600IADA Pulau PinangRM 30,500,000.00RM 7,000,000.00RM 6,920,810.41
98.9%
RM 6,920,810.41JANM 2016, pp. 218–219
01700IADA Kalaka SaribasRM 54,700,000.00RM 9,900,000.00RM 8,796,782.15
88.9%
RM 8,796,782.15JANM 2016, pp. 218–219
01800IADA SamarahanRM 28,750,000.00RM 4,850,000.00RM 4,737,551.48
97.7%
RM 4,737,551.48JANM 2016, pp. 218–219
01910IADA PekanRM 292,520,000.00RM 20,982,200.00RM 20,426,654.58
97.3%
RM 20,426,654.58JANM 2016, pp. 218–219
01920IADA RompinRM 145,775,000.00RM 13,910,000.00RM 11,628,348.98
83.6%
RM 11,628,348.98JANM 2016, pp. 218–219
01930IADA Kota BelutRM 357,100,000.00RM 50,010,000.00RM 41,747,743.31
83.5%
RM 41,747,743.31JANM 2016, pp. 218–219
01940IADA Batang LupurRM 496,400,000.00RM 59,950,000.00RM 58,907,431.98
98.3%
RM 58,907,431.98JANM 2016, pp. 218–219
12700Projek Empangan Paya Peda, TerengganuRM 424,700,000.00RM 6,132,100.00RM 5,887,102.13
96.0%
RM 5,887,102.13JANM 2016, pp. 218–219
12800Pemodenan Sistem Pengairan PadiRM 1,236,723,374.00RM 121,763,200.00RM 112,593,115.57
92.5%
RM 112,593,115.57JANM 2016, pp. 218–219
12900Program Pembangunan Punca AirRM 450,306,905.00RM 37,200,000.00RM 30,548,858.06
82.1%
RM 30,548,858.06JANM 2016, pp. 218–219
14700Program Pembangunan Zon Pantai Utk Kwsn Tanaman/Perikanan Pelbagai NegeriRM 126,200,000.00RM 9,300,000.00RM 6,935,360.88
74.6%
RM 6,935,360.88JANM 2016, pp. 218–219
14800Pembinaan dan Pembaikan Jalan LadangRM 156,956,000.00RM 23,052,000.00RM 22,533,761.52
97.8%
RM 22,533,761.52JANM 2016, pp. 218–219
15400Rancangan Pembangunan Sistem Saliran PertanianRM 93,000,000.00RM 22,250,000.00RM 20,586,301.39
92.5%
RM 20,586,301.39JANM 2016, pp. 218–219
15500Program Menaiktaraf Sistem Saliran PertanianRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
15600Program Kawalan Banjir Kawasan PertanianRM 51,240,000.00RM 5,300,000.00RM 3,971,604.90
74.9%
RM 3,971,604.90JANM 2016, pp. 218–219
15700Rancangan-rancangan Pengairan, Sarawak sRM 37,600,000.00RM 5,761,000.00RM 5,760,947.72
100.0%
RM 5,760,947.72JANM 2016, pp. 218–219
15800Rancangan-rancangan Saliran, Sarawak sNote: P.21 – Butiran 15800 - Peruntukan sebanyak RM10 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 6,400,000.00RM 784,710.00RM 784,676.24
100.0%
RM 784,676.24JANM 2016, pp. 218–219
16600Rancangan-rancangan Pengairan, Sabah sRM 38,000,000.00RM 1,200,000.00RM 959,880.00
80.0%
RM 959,880.00JANM 2016, pp. 218–219
16700Rancangan-rancangan Saliran, Sabah sRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
90100Dasar Perancangan Strategik (DPS)RM 68,500,000.00RM 8,868,300.00RM 7,069,653.70
79.7%
RM 7,069,653.70JANM 2016, pp. 218–219
90200Industri Tanaman, Ternakan dan Perikanan (ITTP)RM 46,600,000.00RM 6,790,000.00RM 6,309,462.15
92.9%
RM 6,309,462.15JANM 2016, pp. 218–219
90300Perkhidmatan Industri dan Ekonomi Bumiputera (PIEB)RM 454,000,000.00RM 53,000,000.00RM 49,874,185.63
94.1%
RM 49,874,185.63JANM 2016, pp. 218–219
90800Pengurusan Maklumat (BPM)RM 2,430,000.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
Pertanian16 projectsEstimate RM 112.05 m · Spent RM 91.41 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
02000Program Pembangunan Komoditi TanamanRM 77,331,500.00RM 16,595,000.00RM 7,180,024.84
43.3%
RM 7,180,024.84JANM 2016, pp. 218–219
02100Program PenyelidikanRM 2,750,000.00RM 250,000.00RM 250,000.00
100.0%
RM 250,000.00JANM 2016, pp. 218–219
02200Perkhidmatan Pengembangan PertanianRM 8,000,000.00RM 1,155,000.00RM 35,476.23
3.1%
RM 35,476.23JANM 2016, pp. 218–219
02300Program LatihanRM 11,500,000.00RM 2,696,000.00RM 2,643,060.96
98.0%
RM 2,643,060.96JANM 2016, pp. 218–219
02400Pengawasan dan Pembangunan KomoditiRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
02500Kemudahan Pembangunan KomoditiRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
03300Kompleks PertanianRM 31,545,000.00RM 2,608,675.00RM 1,679,332.68
64.4%
RM 1,679,332.68JANM 2016, pp. 218–219
03500Pembangunan Industri Bunga dan Komoditi BerpotensiRM 18,000,000.00RM 5,000,000.00RM 4,645,613.20
92.9%
RM 4,645,613.20JANM 2016, pp. 218–219
03700Khidmat Sokongan TeknikalRM 54,450,000.00RM 8,300,000.00RM 8,060,242.13
97.1%
RM 8,060,242.13JANM 2016, pp. 218–219
04000Pembangunan Mempelbagai PertanianRM 64,700,000.00RM 8,157,000.00RM 6,466,646.22
79.3%
RM 6,466,646.22JANM 2016, pp. 218–219
04700Pembangunan Industri PadiRM 64,500,000.00RM 6,500,000.00RM 1,495,460.30
23.0%
RM 1,495,460.30JANM 2016, pp. 218–219
04800Pembangunan Industri KelapaRM 23,000,000.00RM 4,283,800.00RM 4,211,553.02
98.3%
RM 4,211,553.02JANM 2016, pp. 218–219
04900Pembangunan Industri Buah-buahanRM 30,000,000.00RM 3,000,000.00RM 2,386,946.94
79.6%
RM 2,386,946.94JANM 2016, pp. 218–219
05100Kurantina Tumbuhan SarawakRM 5,000,000.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
05200Pembangunan Penyelidikan Pertanian SarawakRM 5,000,000.00RM 1,000,000.00RM 992,691.60
99.3%
RM 992,691.60JANM 2016, pp. 218–219
12500Pembangunan Industri Tanaman MakananRM 224,000,000.00RM 52,500,000.00RM 51,363,572.31
97.8%
RM 51,363,572.31JANM 2016, pp. 218–219
Perkhidmatan Veterinar35 projectsEstimate RM 62.26 m · Spent RM 47.06 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
10700Pembangunan Industri AyamRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
10710Pembangunan Industri Lembu/Kerbau PedagingRM 50,825,000.00RM 3,660,000.00RM 1,414,699.80
38.6%
RM 1,414,699.80JANM 2016, pp. 218–219
10720Pembangunan Industri Kambing/BebiriRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
10730Pembangunan Industri TenusuRM 10,000,000.00RM 7,700,000.00RM 223,178.00
2.9%
RM 223,178.00JANM 2016, pp. 218–219
10740Pembangunan Industri BabiRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 218–219
10750Pengeluaran Bibit dan Baka LembuRM 11,300,000.00RM 4,536,800.00RM 4,536,759.53
100.0%
RM 4,536,759.53JANM 2016, pp. 218–219
10760Pengeluaran Bibit dan Baka Ternakan Kambing BebiriRM 3,200,000.00RM 1,794,200.00RM 1,794,105.50
100.0%
RM 1,794,105.50JANM 2016, pp. 218–219
10770Pengeluaran Baka dan Ternakan ItikRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
10790Pengukuhan Perkhidmatan Genetik TernakanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
10800Pembangunan Tek. Pengeluaran Benih/Bhn Makanan TernakanRM 0.00RM 2,000,000.00RM 0.00
0.0%
RM 0.00JANM 2016, pp. 220–221
10810Menaik Taraf dan Pembesaran Stesen Kuarantin Haiwan (SKH) Padang Besar PerlisNote: P.21 – Butiran 10810 dan 23000, - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 4,990,500.00RM 307,010.00RM 307,000.00
100.0%
RM 307,000.00JANM 2016, pp. 220–221
10820Makmal-makmal Veterinar KawasanRM 3,800,000.00RM 200,000.00RM 0.00
0.0%
RM 0.00JANM 2016, pp. 220–221
10830Kawalan dan Pembasmian Penyakit HaiwanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
10860Pembangunan Semula Rumah Sembelih RuminanRM 4,005,000.00RM 850,000.00RM 704,450.58
82.9%
RM 704,450.58JANM 2016, pp. 220–221
10880Menaiktaraf Kemudahan LatihanRM 84,500,000.00RM 14,741,792.00RM 13,763,417.17
93.4%
RM 13,763,417.17JANM 2016, pp. 220–221
10890Pembangunan Semula Pusat Latihan Ternakan Ayam MelakaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
10900Pembangunan Program LatihanRM 6,600,000.00RM 1,320,000.00RM 1,291,720.00
97.9%
RM 1,291,720.00JANM 2016, pp. 220–221
10920Pengukuhan Penyelidikan dan Pembangunan (R & D)RM 1,500,000.00RM 350,000.00RM 244,316.00
69.8%
RM 244,316.00JANM 2016, pp. 220–221
10930Sistem Maklumat Pengurusan VeterinarRM 4,000,000.00RM 500,000.00RM 499,567.39
99.9%
RM 499,567.39JANM 2016, pp. 220–221
11010Santuari Haiwan EksotikRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
11030Beef ValleyRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
21000Pembangunan Kawasan Ternakan Khinzir SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
21600Pembangunan Tanah untuk DPN3 sRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
21700Projek Ternakan Lembu TenusuRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
21900Projek ItikRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
22000Stesen Kuarantina Haiwan SarawakRM 2,000,000.00RM 1,800,000.00RM 471,055.85
26.2%
RM 471,055.85JANM 2016, pp. 220–221
22100Projek Epidemologi VeterinarRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
22300Kawasan Penternakan Babi sRM 31,000,000.00RM 6,000,000.00RM 6,000,000.00
100.0%
RM 6,000,000.00JANM 2016, pp. 220–221
22500Projek Lembu Pedaging sRM 63,604,000.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
24800Pembangunan Industri Rumpai LautRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
25000Pusat Pengeluaran, Penyelidikan dan Latihan Haiwan SarawakRM 9,000,000.00RM 1,800,000.00RM 1,799,713.15
100.0%
RM 1,799,713.15JANM 2016, pp. 220–221
26000Pembangunan Ternakan SarawakRM 41,000,000.00RM 7,950,000.00RM 7,366,392.14
92.7%
RM 7,366,392.14JANM 2016, pp. 220–221
28000Makmal Penyelidikan PenyakitRM 18,290,000.00RM 300,000.00RM 222,094.52
74.0%
RM 222,094.52JANM 2016, pp. 220–221
29000Kesihatan Awam VeterinarRM 1,500,000.00RM 250,000.00RM 249,997.04
100.0%
RM 249,997.04JANM 2016, pp. 220–221
41800Jabatan Perkhidmatan Haiwan dan Perusahaan Ternak (JPHPT)RM 39,000,000.00RM 6,200,000.00RM 6,175,284.00
99.6%
RM 6,175,284.00JANM 2016, pp. 220–221
Perikanan22 projectsEstimate RM 63.92 m · Spent RM 61.00 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
22501PenyelidikanRM 117,750,000.00RM 12,690,000.00RM 12,259,522.51
96.6%
RM 12,259,522.51JANM 2016, pp. 220–221
22502Kemudahan PenyelidikanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
22503Peningkatan Kualiti Stok AkuakulturRM 31,000,000.00RM 2,300,000.00RM 2,211,354.03
96.2%
RM 2,211,354.03JANM 2016, pp. 220–221
22504Rangkaian Institut Latihan Akuakultur Malaysia (ILHAM)RM 40,000,000.00RM 4,722,000.00RM 4,574,492.08
96.9%
RM 4,574,492.08JANM 2016, pp. 220–221
22600Perkhidmatan Perkembangan PerikananRM 50,000,000.00RM 7,000,000.00RM 6,791,055.16
97.0%
RM 6,791,055.16JANM 2016, pp. 220–221
22700Perkhidmatan PentadbiranRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
22800Teknologi MaklumatRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
23000Pembangunan Kemudahan Latihan Kolej Perikanan Malaysia Lumut PerakNote: P.21 – Butiran 10810 dan 23000, - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 6,000,000.00RM 50,010.00RM 45,905.68
91.8%
RM 45,905.68JANM 2016, pp. 220–221
23300Pengurusan dan Pemulihan IkanRM 41,000,000.00RM 4,400,000.00RM 4,380,576.09
99.6%
RM 4,380,576.09JANM 2016, pp. 220–221
23400Kemudahan PerikananRM 29,567,000.00RM 10,370,000.00RM 9,627,844.01
92.8%
RM 9,627,844.01JANM 2016, pp. 220–221
23500Pengembangan dan DidikanRM 21,430,000.00RM 3,430,000.00RM 3,349,351.14
97.7%
RM 3,349,351.14JANM 2016, pp. 220–221
23702Pengurusan dan Perlindungan Sumber PerikananRM 28,580,000.00RM 4,070,000.00RM 4,057,337.70
99.7%
RM 4,057,337.70JANM 2016, pp. 220–221
24000Kemudahan Lampu Pemandu dan Penambatan VeselRM 16,370,000.00RM 6,200,000.00RM 6,102,694.05
98.4%
RM 6,102,694.05JANM 2016, pp. 220–221
24700Pusat Penyelidikan Perikanan LikasRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
25100Pusat Pembenihan Perikanan SabahRM 2,900,000.00RM 1,140,000.00RM 964,113.85
84.6%
RM 964,113.85JANM 2016, pp. 220–221
25200Pembangunan Akuakultur SabahRM 2,500,000.00RM 500,000.00RM 495,651.05
99.1%
RM 495,651.05JANM 2016, pp. 220–221
26400Peningkatan Produktiviti dan Pemuliharaan EkosistemRM 15,000,000.00RM 2,000,000.00RM 1,925,583.64
96.3%
RM 1,925,583.64JANM 2016, pp. 220–221
26500Latihan Penternak Akuakultur Marin dan Air TawarRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
26900Pemantauan Maklumat Industri PerikananRM 5,230,000.00RM 1,200,000.00RM 1,192,485.88
99.4%
RM 1,192,485.88JANM 2016, pp. 220–221
27100Pembangunan Pejabat PerikananRM 2,500,000.00RM 1,500,000.00RM 701,581.28
46.8%
RM 701,581.28JANM 2016, pp. 220–221
27200Pembangunan Industri Tiram SabahRM 9,280,000.00RM 1,950,000.00RM 1,933,813.26
99.2%
RM 1,933,813.26JANM 2016, pp. 220–221
27400Pembangunan Usahawan Nelayan/PengusahaRM 2,000,000.00RM 400,000.00RM 391,372.83
97.8%
RM 391,372.83JANM 2016, pp. 220–221
Projects printed without a group subtotal3 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
30000Tabung Ekonomi Usaha Niaga (TEKUN)RM 1,350,000,000.00RM 200,000,000.00RM 200,000,000.00
100.0%
RM 200,000,000.00JANM 2016, pp. 220–221
86000Strategic Reform InitiativesRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 220–221
94000NKEANote: P.21 – Butiran 94000 - Peruntukan sebanyak RM5,000,000 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 5,665,149,885.00RM 389,950,566.00RM 372,370,271.23
95.5%
RM 372,370,271.23JANM 2016, pp. 220–221

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2016, Statement of Development Expenditure (Lampiran 2).