Estimate 2019Anggaran
RM 1.15 bn
Spent 2019Sebenar
RM 1.14 bn
98.9% of the estimate; RM 60.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 15.18 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 4.68 bn
Totals as printed, JANM 2019, pp. 170–171

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2019AnggaranSpent 2019Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
Ibu PejabatRM 745.05 mRM 738.08 m
99.1%
RM 2.82 bnJANM 2019, pp. 168–169
PertanianRM 104.24 mRM 100.44 m
96.3%
RM 342.12 mJANM 2019, pp. 170–171
Perkhidmatan VeterinarRM 41.13 mRM 40.74 m
99.0%
RM 204.87 mJANM 2019, pp. 170–171
PerikananRM 76.47 mRM 75.48 m
98.7%
RM 292.77 mJANM 2019, pp. 170–171

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Ibu Pejabat38 projectsEstimate RM 745.05 m · Spent RM 738.08 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2019AnggaranSpent 2019Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
00100Lembaga Pemasaran Pertanian Persekutuan (FAMA)RM 280,900,000.00RM 33,820,000.00RM 33,820,000.00
100.0%
RM 168,303,099.00JANM 2019, pp. 168–169
00203AGRO BankRM 500,000,000.00RM 60,000,000.00RM 60,000,000.00
100.0%
RM 195,000,000.00JANM 2019, pp. 168–169
00300Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI)RM 221,525,694.00RM 46,843,500.00RM 46,593,500.00
99.5%
RM 167,886,600.00JANM 2019, pp. 168–169
00400Lembaga Perindustrian Nanas Malaysia (LPNM)RM 104,250,000.00RM 16,850,000.00RM 16,425,000.00
97.5%
RM 68,386,700.00JANM 2019, pp. 168–169
00500Lembaga Kemajuan Ikan Malaysia (LKIM)RM 861,836,000.00RM 80,207,900.00RM 80,207,800.00
100.0%
RM 232,149,568.00JANM 2019, pp. 168–169
00600Lembaga Kemajuan Pertanian Kemubu (KADA)RM 168,854,000.00RM 34,259,900.00RM 34,259,900.00
100.0%
RM 131,484,620.00JANM 2019, pp. 168–169
00700Lembaga Pertubuhan Peladang (LPP)RM 161,146,251.00RM 28,680,000.00RM 28,680,000.00
100.0%
RM 126,965,000.00JANM 2019, pp. 168–169
00800Lembaga Kemajuan Pertanian Muda (MADA)RM 95,690,000.00RM 11,900,000.00RM 11,900,000.00
100.0%
RM 48,133,750.00JANM 2019, pp. 168–169
00900Projek Pertanian yang LainRM 294,522,714.00RM 34,995,200.00RM 34,493,250.34
98.6%
RM 102,983,216.93JANM 2019, pp. 168–169
00901Agropreneur MudaRM 100,000,000.00RM 20,000,000.00RM 19,967,459.20
99.8%
RM 34,967,459.20JANM 2019, pp. 168–169
00903Pemasaran dan EksportRM 53,000,000.00RM 12,810,000.00RM 11,914,848.50
93.0%
RM 22,382,265.06JANM 2019, pp. 168–169
01100Projek Pertanian Bersepadu Barat Laut SelangorRM 12,100,000.00RM 2,600,000.00RM 2,558,351.83
98.4%
RM 8,166,271.36JANM 2019, pp. 168–169
01200Projek Pertanian Seberang PerakRM 10,750,000.00RM 2,150,000.00RM 2,148,684.54
99.9%
RM 8,628,114.21JANM 2019, pp. 168–169
01300Projek Pertanian Bersepadu Krian/Sg. ManikRM 33,000,000.00RM 5,750,000.00RM 5,603,345.73
97.5%
RM 22,949,701.42JANM 2019, pp. 168–169
01400IADA Kemasin SemerakRM 9,725,000.00RM 1,825,000.00RM 1,771,779.50
97.1%
RM 7,245,875.60JANM 2019, pp. 168–169
01500Projek Pertanian Bersepadu Terengganu UtaraRM 8,500,000.00RM 1,700,000.00RM 1,699,980.54
100.0%
RM 6,789,321.95JANM 2019, pp. 168–169
01600IADA Pulau PinangRM 30,500,000.00RM 3,500,000.00RM 3,492,719.89
99.8%
RM 21,288,132.80JANM 2019, pp. 168–169
01700IADA Kalaka SaribasRM 54,700,000.00RM 13,000,000.00RM 12,997,875.52
100.0%
RM 34,242,520.70JANM 2019, pp. 168–169
01800IADA SamarahanRM 28,750,000.00RM 4,750,000.00RM 4,749,841.04
100.0%
RM 23,789,737.60JANM 2019, pp. 168–169
01910IADA PekanRM 292,520,000.00RM 8,883,000.00RM 8,629,654.98
97.2%
RM 54,327,888.13JANM 2019, pp. 168–169
01920IADA RompinRM 145,775,000.00RM 4,764,400.00RM 4,669,724.64
98.0%
RM 39,102,942.51JANM 2019, pp. 168–169
01930IADA Kota BelutRM 357,100,000.00RM 16,071,500.00RM 15,249,428.05
94.9%
RM 144,540,189.45JANM 2019, pp. 168–169
01940IADA Batang LuparRM 502,100,000.00RM 6,404,300.00RM 6,403,244.47
100.0%
RM 122,329,933.11JANM 2019, pp. 168–169
12700Projek Empangan Paya Peda, TerengganuRM 424,700,000.00RM 0.00RM 0.00RM 5,887,102.13JANM 2019, pp. 168–169
12800Pemodenan Sistem Pengairan PadiRM 1,550,723,374.00RM 91,819,630.00RM 90,914,680.21
99.0%
RM 374,748,465.65JANM 2019, pp. 168–169
12900Program Pembangunan Punca AirRM 1,145,306,905.00RM 39,176,500.00RM 39,123,458.10
99.9%
RM 133,838,473.65JANM 2019, pp. 168–169
14700Program Pembangunan Zon Pantai Untuk Kawasan Tanaman/Perikanan Pelbagai NegeriRM 122,700,000.00RM 531,600.00RM 519,494.58
97.7%
RM 14,019,627.71JANM 2019, pp. 168–169
14800Pembinaan dan Pembaikan Jalan LadangRM 156,956,000.00RM 8,000,000.00RM 7,954,311.93
99.4%
RM 46,958,247.80JANM 2019, pp. 168–169
15400Rancangan Pembangunan Sistem Saliran PertanianRM 93,000,000.00RM 3,519,600.00RM 3,276,817.92
93.1%
RM 36,959,680.17JANM 2019, pp. 168–169
15600Program Kawalan Banjir Kawasan PertanianRM 51,240,000.00RM 7,270,300.00RM 7,270,193.49
100.0%
RM 24,175,373.42JANM 2019, pp. 168–169
15700Rancangan-rancangan Pengairan, SarawakRM 37,600,000.00RM 136,000.00RM 136,000.00
100.0%
RM 7,673,365.08JANM 2019, pp. 168–169
15800Rancangan-rancangan Saliran, SarawakRM 6,400,000.00RM 0.00RM 0.00RM 784,676.24JANM 2019, pp. 168–169
16600Rancangan-rancangan Pengairan, SabahRM 38,000,000.00RM 2,703,700.00RM 1,952,346.23
72.2%
RM 4,512,614.00JANM 2019, pp. 168–169
90100Dasar Perancangan Strategik (DPS)RM 842,531,876.00RM 66,068,580.00RM 65,955,728.64
99.8%
RM 138,027,216.08JANM 2019, pp. 168–169
90200Industri Tanaman, Ternakan dan Perikanan (ITTP)RM 458,957,400.00RM 44,089,730.00RM 43,015,192.68
97.6%
RM 184,463,446.55JANM 2019, pp. 168–169
90700Majlis Latihan Pertanian Kebangsaan (NATC)RM 103,924,262.00RM 12,833,000.00RM 12,647,052.85
98.5%
RM 29,082,929.52JANM 2019, pp. 168–169
90800Pengurusan Maklumat (BPM)RM 2,430,000.00RM 635,010.00RM 635,005.00
100.0%
RM 1,679,007.00JANM 2019, pp. 168–169
90900Industri Asas Tani (IAT)RM 163,000,000.00RM 16,500,000.00RM 16,443,888.25
99.7%
RM 29,857,727.57JANM 2019, pp. 168–169
Pertanian13 projectsEstimate RM 104.24 m · Spent RM 100.44 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2019AnggaranSpent 2019Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
02000Program Pembangunan Komoditi TanamanRM 77,331,500.00RM 19,950,000.00RM 19,950,000.00
100.0%
RM 58,162,024.84JANM 2019, pp. 168–169
02100Program PenyelidikanRM 2,750,000.00RM 500,000.00RM 500,000.00
100.0%
RM 2,550,000.00JANM 2019, pp. 168–169
02200Perkhidmatan Pengembangan PertanianRM 8,000,000.00RM 1,700,000.00RM 1,700,000.00
100.0%
RM 6,835,476.23JANM 2019, pp. 168–169
03300Kompleks PertanianRM 131,545,000.00RM 5,912,000.00RM 5,455,748.71
92.3%
RM 20,498,978.26JANM 2019, pp. 168–169
03500Pembangunan Industri Bunga dan Komoditi BerpotensiRM 18,000,000.00RM 3,000,000.00RM 2,990,789.02
99.7%
RM 11,532,470.55JANM 2019, pp. 168–169
03700Khidmat Sokongan TeknikalRM 54,450,000.00RM 9,400,000.00RM 9,338,718.22
99.3%
RM 29,630,500.31JANM 2019, pp. 168–169
04000Pembangunan Mempelbagai PertanianRM 66,700,000.00RM 7,320,000.00RM 7,014,453.06
95.8%
RM 29,965,548.42JANM 2019, pp. 170–171
04700Pembangunan Industri PadiRM 64,500,000.00RM 5,000,000.00RM 3,905,629.40
78.1%
RM 8,823,936.37JANM 2019, pp. 170–171
04800Pembangunan Industri KelapaRM 23,000,000.00RM 3,000,000.00RM 2,709,655.17
90.3%
RM 12,920,599.18JANM 2019, pp. 170–171
04900Pembangunan Industri Buah-buahanRM 30,000,000.00RM 5,355,000.00RM 4,838,503.09
90.3%
RM 15,860,187.59JANM 2019, pp. 170–171
05100Kurantina Tumbuhan SarawakRM 5,000,000.00RM 100,000.00RM 20,922.96
20.9%
RM 20,922.96JANM 2019, pp. 170–171
05200Pembangunan Penyelidikan Pertanian SarawakRM 5,000,000.00RM 1,000,000.00RM 856,206.00
85.6%
RM 3,594,008.15JANM 2019, pp. 170–171
12500Pembangunan Industri Tanaman MakananRM 224,000,000.00RM 42,000,000.00RM 41,155,195.53
98.0%
RM 141,729,784.21JANM 2019, pp. 170–171
Perkhidmatan Veterinar20 projectsEstimate RM 41.13 m · Spent RM 40.74 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2019AnggaranSpent 2019Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
10710Pembangunan Industri Lembu/Kerbau PedagingRM 45,876,400.00RM 1,652,000.00RM 1,610,664.36
97.5%
RM 7,453,918.75JANM 2019, pp. 170–171
10730Pembangunan Industri TenusuRM 14,400,000.00RM 986,000.00RM 984,269.34
99.8%
RM 1,908,752.82JANM 2019, pp. 170–171
10750Pengeluaran Bibit dan Baka LembuRM 10,100,000.00RM 0.00RM 0.00RM 9,900,185.25JANM 2019, pp. 170–171
10760Pengeluaran Bibit dan Baka Ternakan Kambing BebiriRM 3,200,000.00RM 0.00RM 0.00RM 3,190,221.77JANM 2019, pp. 170–171
10810Menaik Taraf dan Pembesaran Stesen Kuarantin Haiwan (SKH) Padang Besar PerlisRM 4,990,500.00RM 0.00RM 0.00RM 338,224.13JANM 2019, pp. 170–171
10820Pembangunan Makmal-makmal Veterinar KawasanRM 5,000,000.00RM 141,000.00RM 140,580.87
99.7%
RM 4,397,556.66JANM 2019, pp. 170–171
10860Naiktaraf Abatsir Shah Alam, Selangor ke Tahap Veterinary Health Mark (VHM) dan Export Supply Chain Assurance System (ESCAS)Note: P.21– Butiran 10860 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2020 telah dimasuk kira sebagai pendahuluan.RM 4,005,000.00RM 12,010.00RM 2,253.75
18.8%
RM 2,883,982.97JANM 2019, pp. 170–171
10880Menaiktaraf Kemudahan LatihanRM 84,000,000.00RM 0.00RM 0.00RM 27,306,672.72JANM 2019, pp. 170–171
10920Pengukuhan Penyelidikan dan Pembangunan (R & D)RM 1,500,000.00RM 276,500.00RM 275,419.68
99.6%
RM 814,205.18JANM 2019, pp. 170–171
10930Sistem Maklumat Pengurusan VeterinarRM 4,000,000.00RM 0.00RM 0.00RM 1,499,088.39JANM 2019, pp. 170–171
22000Stesen Kuarantina Haiwan SarawakRM 2,000,000.00RM 0.00RM 0.00RM 671,055.85JANM 2019, pp. 170–171
22200Rumah Penyembelihan dan Kesihatan AwamRM 34,160,000.00RM 0.00RM 0.00RM 275,010.00JANM 2019, pp. 170–171
22300Kawasan Penternakan BabiRM 26,104,000.00RM 2,000,000.00RM 2,000,000.00
100.0%
RM 18,000,000.00JANM 2019, pp. 170–171
22500Projek Lembu PedagingRM 66,092,133.00RM 12,620,000.00RM 12,620,000.00
100.0%
RM 40,623,000.00JANM 2019, pp. 170–171
25000Pusat Pengeluaran, Penyelidikan dan Latihan Haiwan SarawakRM 9,000,000.00RM 1,800,000.00RM 1,585,928.00
88.1%
RM 6,183,687.84JANM 2019, pp. 170–171
26000Pembangunan Ternakan SarawakRM 41,000,000.00RM 8,200,000.00RM 8,200,000.00
100.0%
RM 31,782,743.68JANM 2019, pp. 170–171
28000Makmal Penyelidikan PenyakitRM 12,790,000.00RM 1,300,000.00RM 1,300,000.00
100.0%
RM 5,637,734.32JANM 2019, pp. 170–171
29000Kesihatan Awam VeterinarRM 1,500,000.00RM 250,000.00RM 249,995.65
100.0%
RM 983,252.75JANM 2019, pp. 170–171
41000Perkhidmatan Kuarantin dan Pemeriksaan MalaysiaRM 21,108,892.00RM 2,825,000.00RM 2,702,120.85
95.7%
RM 4,334,114.10JANM 2019, pp. 170–171
41800Jabatan Perkhidmatan Haiwan dan Perusahaan Ternak (JPHPT)RM 56,686,000.00RM 9,070,000.00RM 9,070,000.00
100.0%
RM 36,685,284.00JANM 2019, pp. 170–171
Perikanan17 projectsEstimate RM 76.47 m · Spent RM 75.48 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2019AnggaranSpent 2019Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
17100Taman LautRM 94,990,000.00RM 16,353,000.00RM 16,221,677.80
99.2%
RM 51,720,935.16JANM 2019, pp. 170–171
22501PenyelidikanRM 100,235,000.00RM 14,010,000.00RM 13,940,270.02
99.5%
RM 55,548,262.51JANM 2019, pp. 170–171
22503Peningkatan Kualiti Stok AkuakulturRM 31,000,000.00RM 6,200,000.00RM 6,158,683.76
99.3%
RM 15,903,833.50JANM 2019, pp. 170–171
22504Rangkaian Institut Latihan Akuakultur Malaysia (ILHAM)RM 40,000,000.00RM 7,500,000.00RM 7,367,892.31
98.2%
RM 21,022,710.70JANM 2019, pp. 170–171
22600Perkhidmatan Perkembangan PerikananRM 50,000,000.00RM 4,099,900.00RM 4,087,875.00
99.7%
RM 25,282,816.65JANM 2019, pp. 170–171
23300Pengurusan dan Pemulihan IkanRM 64,515,000.00RM 12,958,380.00RM 12,818,679.11
98.9%
RM 31,928,107.19JANM 2019, pp. 170–171
23400Kemudahan PerikananRM 29,567,000.00RM 0.00RM 0.00RM 12,127,092.43JANM 2019, pp. 170–171
23500Pengembangan dan DidikanRM 21,430,000.00RM 2,359,300.00RM 2,215,695.01
93.9%
RM 16,721,994.10JANM 2019, pp. 170–171
23702Pengurusan dan Perlindungan Sumber PerikananRM 28,580,000.00RM 6,360,000.00RM 6,264,755.09
98.5%
RM 19,369,517.91JANM 2019, pp. 170–171
24000Kemudahan Lampu Pemandu dan Penambatan VeselRM 16,370,000.00RM 0.00RM 0.00RM 11,904,401.52JANM 2019, pp. 170–171
25100Pusat Pembenihan Perikanan SabahRM 2,900,000.00RM 120,000.00RM 116,625.93
97.2%
RM 2,552,303.83JANM 2019, pp. 170–171
25200Pembangunan Akuakultur SabahRM 2,500,000.00RM 500,000.00RM 499,365.90
99.9%
RM 1,984,202.26JANM 2019, pp. 170–171
26400Peningkatan Produktiviti dan Pemuliharaan EkosistemRM 15,000,000.00RM 2,800,000.00RM 2,771,028.90
99.0%
RM 10,749,352.57JANM 2019, pp. 170–171
26900Pemantauan Maklumat Industri PerikananRM 5,230,000.00RM 660,000.00RM 659,966.59
100.0%
RM 4,752,663.69JANM 2019, pp. 170–171
27100Pembangunan Pejabat PerikananRM 2,500,000.00RM 0.00RM 0.00RM 1,637,546.27JANM 2019, pp. 170–171
27200Pembangunan Industri Tiram SabahRM 9,280,000.00RM 2,150,000.00RM 1,966,732.09
91.5%
RM 7,920,753.97JANM 2019, pp. 170–171
27400Pembangunan Usahawan Nelayan/PengusahaRM 2,000,000.00RM 400,000.00RM 392,039.18
98.0%
RM 1,640,685.06JANM 2019, pp. 170–171
Projects printed without a group subtotal3 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2019AnggaranSpent 2019Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
41100Jabatan Pertanian Semenanjung - DOARM 10,000,000.00RM 4,880,000.00RM 4,867,761.20
99.8%
RM 4,867,761.20JANM 2019, pp. 170–171
41700Jabatan Perkhidmatan Veterinar Semenanjung - DVSRM 8,548,600.00RM 2,885,000.00RM 2,592,715.25
89.9%
RM 2,592,715.25JANM 2019, pp. 170–171
94000Projek Pemacu PertanianRM 3,965,604,554.00RM 179,298,070.00RM 179,189,518.29
99.9%
RM 1,008,163,144.91JANM 2019, pp. 170–171