Kementerian Pertanian dan Keterjaminan Makanan
A development (P) vote: spending on this ministry's projects under the Twelfth Malaysia Plan (RMKe-12, 2021–2025). What each project was allocated and spent in 2025, from the audited Statement of Development Expenditure.
The same code is printed as Kementerian Pertanian dan Industri Asas Tani in 2016–2019 and Kementerian Pertanian dan Industri Makanan in 2020–2022.
All development votes in 2025 · Operating vote B.21 · P.21 in Budget 2027
By group
The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.
| Group | Estimate 2025Anggaran | Spent 2025Sebenar | % usedPrestasi | RMKe-12 to dateSebenar RMKe-12 | SourceSumber |
|---|---|---|---|---|---|
| Ibu Pejabat | RM 193.49 m | RM 193.40 m | 100.0% | RM 1.15 bn | JANM 2025, pp. 204–205 |
| Pertanian | RM 1.12 m | RM 1.12 m | 100.0% | RM 26.43 m | JANM 2025, pp. 204–205 |
| Perkhidmatan Veterinar | RM 19.79 m | RM 19.75 m | 99.8% | RM 37.17 m | JANM 2025, pp. 204–205 |
| Perikanan | RM 0.00 | RM 0.00 | RM 14.03 m | JANM 2025, pp. 204–205 |
Every project
Each project exactly as printed, to the sen, with the two-page spread it was read from.
Ibu Pejabat21 projectsEstimate RM 193.49 m · Spent RM 193.40 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2025Anggaran | Spent 2025Sebenar | % usedPrestasi | RMKe-12 to dateSebenar RMKe-12 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 00100 | Lembaga Pemasaran Pertanian Persekutuan (FAMA) - RMKe11 | RM 110,215,000.00 | RM 7,035,000.00 | RM 7,035,000.00 | 100.0% | RM 54,620,000.00 | JANM 2025, pp. 204–205 |
| 00500 | Lembaga Kemajuan Ikan Malaysia (LKIM) | RM 205,640,000.00 | RM 0.00 | RM 0.00 | RM 78,960,200.00 | JANM 2025, pp. 204–205 | |
| 00600 | Lembaga Kemajuan Pertanian Kemubu (KADA) - RMKe11 | RM 39,859,280.00 | RM 3,500,000.00 | RM 3,500,000.00 | 100.0% | RM 18,000,000.00 | JANM 2025, pp. 204–205 |
| 01300 | IADA - Kerian | RM 37,000,000.00 | RM 12,000,000.00 | RM 12,000,000.00 | 100.0% | RM 12,746,825.00 | JANM 2025, pp. 204–205 |
| 01700 | IADA - Kalaka Saribas Betong | RM 36,986,000.00 | RM 0.00 | RM 0.00 | RM 1,976,077.50 | JANM 2025, pp. 204–205 | |
| 01910 | IADA - Pekan - Pengairan dan Saliran | RM 242,912,000.00 | RM 16,135,000.00 | RM 16,134,879.61 | 100.0% | RM 42,234,209.60 | JANM 2025, pp. 204–205 |
| 01920 | IADA - Rompin - Pengairan dan Saliran | RM 63,800,000.00 | RM 5,749,900.00 | RM 5,749,828.96 | 100.0% | RM 9,767,835.69 | JANM 2025, pp. 204–205 |
| 01930 | IADA - Kota Belud - Pengairan dan Saliran | RM 183,100,000.00 | RM 31,565,760.00 | RM 31,565,407.40 | 100.0% | RM 95,080,909.38 | JANM 2025, pp. 204–205 |
| 01940 | IADA - Batang Lupar - Pengairan dan Saliran | RM 264,100,000.00 | RM 6,450,300.00 | RM 6,449,651.24 | 100.0% | RM 54,384,136.17 | JANM 2025, pp. 204–205 |
| 12800 | Pemodenan Sistem Pengairan Padi | RM 1,280,664,354.00 | RM 18,112,810.00 | RM 18,112,179.43 | 100.0% | RM 198,747,001.59 | JANM 2025, pp. 204–205 |
| 12900 | Program Pembangunan Punca Air | RM 1,039,210,000.00 | RM 6,699,000.00 | RM 6,698,895.23 | 100.0% | RM 88,066,236.58 | JANM 2025, pp. 204–205 |
| 14700 | Program Pembangunan Zon Pantai Untuk Kawasan Tanaman/Perikanan Pelbagai Negeri | RM 79,200,000.00 | RM 0.00 | RM 0.00 | RM 38,627,228.86 | JANM 2025, pp. 204–205 | |
| 14800 | Pembinaan dan Pembaikan Jalan Ladang | RM 222,000,000.00 | RM 49,085,600.00 | RM 49,081,571.32 | 100.0% | RM 181,836,706.66 | JANM 2025, pp. 204–205 |
| 15400 | Rancangan Pembangunan Sistem Saliran Pertanian | RM 52,032,000.00 | RM 3,258,000.00 | RM 3,258,000.00 | 100.0% | RM 17,923,089.51 | JANM 2025, pp. 204–205 |
| 15600 | Program Kawalan Banjir Kawasan Pertanian | RM 36,700,000.00 | RM 0.00 | RM 0.00 | RM 12,507,556.58 | JANM 2025, pp. 204–205 | |
| 16600 | Rancangan-rancangan Pengairan Sabah | RM 42,600,000.00 | RM 508,800.00 | RM 508,727.08 | 100.0% | RM 32,923,314.69 | JANM 2025, pp. 204–205 |
| 90100 | Dasar Perancangan Strategik (DPS) | RM 58,315,000.00 | RM 0.00 | RM 0.00 | RM 6,324,699.31 | JANM 2025, pp. 204–205 | |
| 90200 | Industri Tanaman, Ternakan dan Perikanan | RM 342,107,400.00 | RM 32,110,000.00 | RM 32,033,983.43 | 99.8% | RM 182,092,770.99 | JANM 2025, pp. 204–205 |
| 90400 | Industri Padi dan Beras - RMKe11 | RM 21,031,000.00 | RM 0.00 | RM 0.00 | RM 6,700,000.00 | JANM 2025, pp. 204–205 | |
| 90700 | Latihan Pertanian Kebangsaan | RM 45,468,000.00 | RM 1,278,000.00 | RM 1,268,883.75 | 99.3% | RM 17,345,356.66 | JANM 2025, pp. 204–205 |
| 90900 | Industri Asas Tani (IAT) | RM 3,000,000.00 | RM 0.00 | RM 0.00 | RM 2,297,454.10 | JANM 2025, pp. 204–205 |
Pertanian10 projectsEstimate RM 1.12 m · Spent RM 1.12 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2025Anggaran | Spent 2025Sebenar | % usedPrestasi | RMKe-12 to dateSebenar RMKe-12 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 02000 | Program Pembangunan Komoditi Tanaman | RM 18,390,500.00 | RM 0.00 | RM 0.00 | RM 3,220,000.00 | JANM 2025, pp. 204–205 | |
| 02400 | Pengawasan dan Pengawalan Perosak | RM 2,800,000.00 | RM 0.00 | RM 0.00 | RM 1,130,000.00 | JANM 2025, pp. 204–205 | |
| 03300 | Kompleks Pertanian | RM 28,845,000.00 | RM 0.00 | RM 0.00 | RM 1,505,883.51 | JANM 2025, pp. 204–205 | |
| 03700 | Khidmat Sokongan Teknikal | RM 10,000,000.00 | RM 0.00 | RM 0.00 | RM 59,152.50 | JANM 2025, pp. 204–205 | |
| 04000 | Pembangunan Mempelbagai Pertanian | RM 26,000,000.00 | RM 0.00 | RM 0.00 | RM 9,946,454.29 | JANM 2025, pp. 204–205 | |
| 04700 | Pembangunan Industri Padi Sarawak | RM 10,978,050.00 | RM 0.00 | RM 0.00 | RM 1,804,263.80 | JANM 2025, pp. 204–205 | |
| 04900 | Pembangunan Industri Buah-buahan | RM 25,000,000.00 | RM 0.00 | RM 0.00 | RM 1,014,476.54 | JANM 2025, pp. 204–205 | |
| 05100 | Kuarantina Tumbuhan Sarawak | RM 5,000,000.00 | RM 1,124,300.00 | RM 1,124,230.20 | 100.0% | RM 3,933,919.38 | JANM 2025, pp. 204–205 |
| 12500 | Pembangunan Industri Tanaman Makanan | RM 152,000,000.00 | RM 0.00 | RM 0.00 | RM 230,000.00 | JANM 2025, pp. 204–205 | |
| 41000 | Perkhidmatan Kuarantin dan Pemeriksaan Malaysia (MAQIS) - RMKe-11 | RM 17,028,892.00 | RM 0.00 | RM 0.00 | RM 3,581,926.15 | JANM 2025, pp. 204–205 |
Perkhidmatan Veterinar6 projectsEstimate RM 19.79 m · Spent RM 19.75 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2025Anggaran | Spent 2025Sebenar | % usedPrestasi | RMKe-12 to dateSebenar RMKe-12 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10710 | Pembangunan Industri Lembu/Kerbau Pedaging | RM 58,876,400.00 | RM 360,775.00 | RM 359,970.58 | 99.8% | RM 3,147,646.17 | JANM 2025, pp. 204–205 |
| 10730 | Pembangunan Industri Tenusu | RM 16,400,000.00 | RM 181,700.00 | RM 148,068.65 | 81.5% | RM 3,038,982.83 | JANM 2025, pp. 204–205 |
| 22300 | Kawasan Penternakan Babi | RM 26,104,000.00 | RM 4,390,450.00 | RM 4,390,450.00 | 100.0% | RM 4,402,450.00 | JANM 2025, pp. 204–205 |
| 22500 | Projek Lembu Pedaging | RM 9,904,000.00 | RM 3,705,282.00 | RM 3,705,282.00 | 100.0% | RM 3,715,282.00 | JANM 2025, pp. 204–205 |
| 26000 | Pembangunan Ternakan Sarawak | RM 41,000,000.00 | RM 0.00 | RM 0.00 | RM 6,032,322.00 | JANM 2025, pp. 204–205 | |
| 41800 | Jabatan Perkhidmatan Haiwan dan Perusahaan Ternak | RM 31,686,000.00 | RM 11,149,606.00 | RM 11,149,605.00 | 100.0% | RM 16,834,605.00 | JANM 2025, pp. 204–205 |
Perikanan3 projectsEstimate RM 0.00 · Spent RM 0.00
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2025Anggaran | Spent 2025Sebenar | % usedPrestasi | RMKe-12 to dateSebenar RMKe-12 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 17100 | Taman Laut | RM 37,130,000.00 | RM 0.00 | RM 0.00 | RM 7,500,572.10 | JANM 2025, pp. 204–205 | |
| 23300 | Pengurusan dan Pemulihan Ikan | RM 23,515,000.00 | RM 0.00 | RM 0.00 | RM 6,025,934.80 | JANM 2025, pp. 204–205 | |
| 23500 | Pengembangan dan Didikan | RM 13,930,000.00 | RM 0.00 | RM 0.00 | RM 499,607.99 | JANM 2025, pp. 204–205 |
Projects printed without a group subtotal48 projects
These projects count toward the vote total but are not printed under a group heading.
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2025Anggaran | Spent 2025Sebenar | % usedPrestasi | RMKe-12 to dateSebenar RMKe-12 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10001 | Bahagian Dasar dan Perancangan StrategikNote: P.21 – Butiran 10001- Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2026 telah dimasuk kira sebagai pendahuluan | RM 10,000,000.00 | RM 605,235.00 | RM 560,206.59 | 92.6% | RM 9,903,693.42 | JANM 2025, pp. 206–207 |
| 10002 | Bahagian Pembangunan | RM 393,400,000.00 | RM 25,928,850.00 | RM 25,400,277.34 | 98.0% | RM 225,253,547.00 | JANM 2025, pp. 206–207 |
| 10003 | Bahagian Sekuriti Makanan | RM 903,200,000.00 | RM 426,212,148.00 | RM 425,396,223.04 | 99.8% | RM 822,153,381.47 | JANM 2025, pp. 206–207 |
| 10004 | Bahagian Industri Makanan dan Asas Tani | RM 176,250,000.00 | RM 40,826,300.00 | RM 40,507,052.58 | 99.2% | RM 127,806,861.86 | JANM 2025, pp. 206–207 |
| 10005 | Bahagian Pembangunan Perniagaan dan Pelaburan (Pemasaran dan Eksport) | RM 43,200,000.00 | RM 6,956,500.00 | RM 6,956,457.16 | 100.0% | RM 43,121,204.30 | JANM 2025, pp. 206–207 |
| 10006 | Bahagian Pembangunan Perniagaan dan Pelaburan (Pelaburan) | RM 56,350,000.00 | RM 14,287,000.00 | RM 14,287,000.00 | 100.0% | RM 40,049,913.91 | JANM 2025, pp. 206–207 |
| 10007 | Bahagian Pembangunan Kapasiti dan Latihan Pertanian | RM 86,240,000.00 | RM 17,041,400.00 | RM 17,040,880.66 | 100.0% | RM 59,275,652.43 | JANM 2025, pp. 206–207 |
| 10008 | Unit Agroprenuer Muda | RM 100,000,000.00 | RM 25,000,000.00 | RM 24,974,201.10 | 99.9% | RM 99,000,313.25 | JANM 2025, pp. 206–207 |
| 10009 | Bahagian Pengurusan Maklumat | RM 2,500,000.00 | RM 0.00 | RM 0.00 | RM 2,459,893.11 | JANM 2025, pp. 206–207 | |
| 10010 | Bahagian Kewangan | RM 325,000,000.00 | RM 0.00 | RM 0.00 | RM 122,911,457.76 | JANM 2025, pp. 206–207 | |
| 10012 | Bahagian Pembangunan Industri Padi | RM 4,500,000.00 | RM 0.00 | RM 0.00 | RM 2,494,671.04 | JANM 2025, pp. 206–207 | |
| 10013 | Bahagian Pengairan dan Saliran Pertanian | RM 396,958,000.00 | RM 77,675,330.00 | RM 77,662,631.40 | 100.0% | RM 187,758,801.19 | JANM 2025, pp. 206–207 |
| 10015 | Bahagian Pemodenan Pertanian (BPP) | RM 31,741,000.00 | RM 0.00 | RM 0.00 | RM 9,686,387.60 | JANM 2025, pp. 206–207 | |
| 20001 | IADA - Barat Laut Selangor | RM 22,900,000.00 | RM 2,700,000.00 | RM 2,699,975.32 | 100.0% | RM 22,897,255.39 | JANM 2025, pp. 206–207 |
| 20002 | IADA - Seberang Perak | RM 23,500,000.00 | RM 6,060,000.00 | RM 6,059,987.58 | 100.0% | RM 23,499,029.49 | JANM 2025, pp. 206–207 |
| 20003 | IADA - Kerian | RM 14,500,000.00 | RM 2,403,000.00 | RM 2,403,000.00 | 100.0% | RM 14,496,265.44 | JANM 2025, pp. 206–207 |
| 20004 | IADA - Kemasin Semerak | RM 21,900,000.00 | RM 6,100,000.00 | RM 6,099,299.56 | 100.0% | RM 20,772,219.84 | JANM 2025, pp. 206–207 |
| 20005 | IADA - KETARA | RM 11,200,000.00 | RM 2,240,000.00 | RM 2,239,979.22 | 100.0% | RM 10,939,888.71 | JANM 2025, pp. 206–207 |
| 20006 | IADA - Pulau Pinang | RM 23,100,800.00 | RM 3,594,100.00 | RM 3,593,907.69 | 100.0% | RM 21,716,918.54 | JANM 2025, pp. 206–207 |
| 20007 | IADA - Kalaka Saribas Betong | RM 28,150,000.00 | RM 4,607,800.00 | RM 4,607,571.85 | 100.0% | RM 27,634,369.74 | JANM 2025, pp. 206–207 |
| 20008 | IADA - Samarahan | RM 26,750,000.00 | RM 2,500,000.00 | RM 2,499,849.40 | 100.0% | RM 26,249,122.40 | JANM 2025, pp. 206–207 |
| 20009 | IADA - Pekan | RM 12,500,000.00 | RM 1,400,000.00 | RM 1,399,994.60 | 100.0% | RM 12,499,985.35 | JANM 2025, pp. 206–207 |
| 20010 | IADA - Rompin | RM 16,000,000.00 | RM 1,500,000.00 | RM 1,499,998.75 | 100.0% | RM 13,899,276.43 | JANM 2025, pp. 206–207 |
| 20011 | IADA - Kota Belud | RM 14,600,000.00 | RM 3,345,000.00 | RM 3,344,991.42 | 100.0% | RM 13,736,838.86 | JANM 2025, pp. 206–207 |
| 20012 | IADA - Batang Lupar | RM 7,800,000.00 | RM 1,083,000.00 | RM 1,082,905.00 | 100.0% | RM 6,820,346.34 | JANM 2025, pp. 206–207 |
| 24000 | Kemudahan Lampu Pemandu dan Penambatan Vesel | RM 8,370,000.00 | RM 0.00 | RM 0.00 | RM 184,520.00 | JANM 2025, pp. 206–207 | |
| 30001 | Jabatan Pertanian Malaysia (DOA) | RM 361,200,000.00 | RM 68,313,701.00 | RM 68,312,367.75 | 100.0% | RM 334,872,016.17 | JANM 2025, pp. 206–207 |
| 30002 | Jabatan Pertanian Sabah | RM 146,500,000.00 | RM 26,549,296.00 | RM 25,842,310.91 | 97.3% | RM 118,681,572.83 | JANM 2025, pp. 206–207 |
| 30003 | Jabatan Pertanian Sarawak | RM 115,300,000.00 | RM 16,914,300.00 | RM 16,848,741.99 | 99.6% | RM 82,098,355.65 | JANM 2025, pp. 206–207 |
| 30004 | Jabatan Perikanan Malaysia (DOF) | RM 446,085,000.00 | RM 125,045,667.00 | RM 124,848,786.24 | 99.8% | RM 378,383,316.31 | JANM 2025, pp. 206–207 |
| 30005 | Jabatan Perikanan Sabah | RM 60,800,000.00 | RM 15,873,900.00 | RM 15,869,211.59 | 100.0% | RM 53,764,129.29 | JANM 2025, pp. 206–207 |
| 30006 | Jabatan Perikanan Laut Sarawak | RM 100,975,000.00 | RM 18,356,800.00 | RM 18,351,179.22 | 100.0% | RM 75,822,945.97 | JANM 2025, pp. 206–207 |
| 30007 | Jabatan Perkhidmatan Veterinar Malaysia (DVS) | RM 277,066,000.00 | RM 43,858,700.00 | RM 43,188,617.15 | 98.5% | RM 140,332,268.78 | JANM 2025, pp. 206–207 |
| 30008 | Jabatan Perkhidmatan Veterinar Sabah | RM 55,440,520.00 | RM 9,496,188.00 | RM 9,496,188.00 | 100.0% | RM 44,681,841.90 | JANM 2025, pp. 206–207 |
| 30009 | Jabatan Perkhidmatan Veterinar Sarawak | RM 52,500,000.00 | RM 11,871,800.00 | RM 11,816,286.09 | 99.5% | RM 47,123,758.48 | JANM 2025, pp. 206–207 |
| 30010 | Jabatan Perkhidmatan Kuarantin dan Pemeriksaan Malaysia (MAQIS) | RM 156,300,000.00 | RM 14,626,900.00 | RM 14,625,758.01 | 100.0% | RM 51,424,450.25 | JANM 2025, pp. 206–207 |
| 40001 | Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI) | RM 172,300,000.00 | RM 38,952,500.00 | RM 38,592,575.00 | 99.1% | RM 168,935,825.00 | JANM 2025, pp. 206–207 |
| 40002 | Lembaga Pemasaran Pertanian Persekutuan (FAMA) | RM 190,765,000.00 | RM 33,755,000.00 | RM 33,755,000.00 | 100.0% | RM 182,296,500.00 | JANM 2025, pp. 206–207 |
| 40003 | Lembaga Pertubuhan Peladang (LPP) | RM 311,272,250.00 | RM 74,397,922.00 | RM 74,395,073.00 | 100.0% | RM 307,665,523.00 | JANM 2025, pp. 206–207 |
| 40004 | Lembaga Perindustrian Nanas Malaysia (LPNM) | RM 141,000,000.00 | RM 55,485,500.00 | RM 51,338,493.00 | 92.5% | RM 128,685,333.00 | JANM 2025, pp. 206–207 |
| 40005 | Lembaga Kemajuan Ikan Malaysia (LKIM) | RM 364,885,900.00 | RM 14,100,513.00 | RM 14,100,450.00 | 100.0% | RM 104,006,189.00 | JANM 2025, pp. 206–207 |
| 40006 | Lembaga Kemajuan Pertanian Kemubu (KADA) | RM 118,021,950.00 | RM 13,320,000.00 | RM 13,320,000.00 | 100.0% | RM 60,084,000.00 | JANM 2025, pp. 206–207 |
| 40007 | Lembaga Kemajuan Pertanian Muda (MADA) | RM 174,538,000.00 | RM 58,554,800.00 | RM 58,554,800.00 | 100.0% | RM 169,251,800.00 | JANM 2025, pp. 206–207 |
| 40008 | Agro Bank | RM 550,000,000.00 | RM 0.00 | RM 0.00 | RM 510,000,000.00 | JANM 2025, pp. 206–207 | |
| 40009 | Malaysian Bioeconomy Development Corporation | RM 85,000,000.00 | RM 0.00 | RM 0.00 | RM 9,000,000.00 | JANM 2025, pp. 206–207 | |
| 51000 | Dana Jaminan Makanan | RM 540,000,000.00 | RM 0.00 | RM 0.00 | RM 505,060,405.69 | JANM 2025, pp. 206–207 | |
| 94000 | Projek Pemacu Pertanian | RM 2,340,349,834.00 | RM 6,206,077.00 | RM 6,204,612.16 | 100.0% | RM 315,400,220.74 | JANM 2025, pp. 206–207 |
| 95000 | PPP/PFI | RM 530,640,000.00 | RM 96,156,800.00 | RM 96,156,528.88 | 100.0% | RM 294,841,986.64 | JANM 2025, pp. 206–207 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2025, Statement of Development Expenditure (Lampiran 2).