Kementerian Pertanian dan Industri Makanan

A development (P) vote: spending on this ministry's projects under the Twelfth Malaysia Plan (RMKe-12, 2021–2025). What each project was allocated and spent in 2021, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Pertanian dan Industri Asas Tani in 2016–2019 and Kementerian Pertanian dan Keterjaminan Makanan in 2023–2025.

All development votes in 2021 · Operating vote B.21 · P.21 in Budget 2027

Estimate 2021Anggaran
RM 1.34 bn
Spent 2021Sebenar
RM 1.32 bn
98.7% of the estimate; RM 60.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 12.30 bn
RMKe-12 spent to dateSebenar RMKe-12
RM 1.32 bn
Totals as printed, JANM 2021, pp. 200–201

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
Ibu PejabatRM 314.35 mRM 303.28 m
96.5%
RM 303.28 mJANM 2021, pp. 196–197
PertanianRM 18.43 mRM 16.60 m
90.1%
RM 16.60 mJANM 2021, pp. 196–197
Perkhidmatan VeterinarRM 6.83 mRM 6.81 m
99.8%
RM 6.81 mJANM 2021, pp. 198–199
PerikananRM 2.79 mRM 2.79 m
99.9%
RM 2.79 mJANM 2021, pp. 198–199

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Ibu Pejabat39 projectsEstimate RM 314.35 m · Spent RM 303.28 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00100Lembaga Pemasaran Pertanian Persekutuan (FAMA)RM 100,000,000.00RM 9,100,000.00RM 9,100,000.00
100.0%
RM 9,100,000.00JANM 2021, pp. 194–195
00203Agro BankRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
00300Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
00400Lembaga Perindustrian Nanas Malaysia (LPNM)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
00500Lembaga Kemajuan Ikan Malaysia (LKIM)RM 205,640,000.00RM 38,800,000.00RM 38,800,000.00
100.0%
RM 38,800,000.00JANM 2021, pp. 194–195
00600Lembaga Kemajuan Pertanian Kemubu (KADA)RM 39,859,280.00RM 7,500,000.00RM 7,500,000.00
100.0%
RM 7,500,000.00JANM 2021, pp. 194–195
00700Lembaga Pertubuhan Peladang (LPP)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
00800Lembaga Kemajuan Pertanian Muda (MADA)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
00900Projek Pertanian yang LainRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
00901Agropreneur MudaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
00903Pemasaran dan EksportRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
01100IADA Barat Laut SelangorRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
01200IADA Seberang PerakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 194–195
01300IADA KerianNote: P.21 – Butiran 01300, 01700, 02000, 02400, 03700, 04900 dan 12500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 25,000,000.00RM 746,875.00RM 746,825.00
100.0%
RM 746,825.00JANM 2021, pp. 196–197
01400IADA Kemasin SemerakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
01500IADA KetaraRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
01600IADA Pulau PinangRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
01700IADA Kalaka SaribasNote: P.21 – Butiran 01300, 01700, 02000, 02400, 03700, 04900 dan 12500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 36,986,000.00RM 1,976,088.00RM 1,976,077.50
100.0%
RM 1,976,077.50JANM 2021, pp. 196–197
01800IADA SamarahanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
01910IADA PekanRM 209,600,000.00RM 12,519,300.00RM 12,518,000.00
100.0%
RM 12,518,000.00JANM 2021, pp. 196–197
01920IADA RompinRM 57,100,000.00RM 618,100.00RM 588,535.00
95.2%
RM 588,535.00JANM 2021, pp. 196–197
01930IADA Kota BeludRM 185,300,000.00RM 4,785,500.00RM 4,390,539.73
91.8%
RM 4,390,539.73JANM 2021, pp. 196–197
01940IADA Batang LuparRM 264,100,000.00RM 28,952,100.00RM 28,951,710.89
100.0%
RM 28,951,710.89JANM 2021, pp. 196–197
12700Projek Empangan Paya Peda, TerengganuRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
12800Pemodenan Sistem Pengairan PadiRM 1,244,196,354.00RM 78,022,300.00RM 72,028,462.16
92.3%
RM 72,028,462.16JANM 2021, pp. 196–197
12900Program Pembangunan Punca AirRM 1,070,500,000.00RM 30,396,300.00RM 27,617,575.02
90.9%
RM 27,617,575.02JANM 2021, pp. 196–197
14700Program Pembangunan Zon Pantai Untuk Kawasan Tanaman/Perikanan Pelbagai NegeriRM 80,200,000.00RM 25,684,000.00RM 25,650,430.32
99.9%
RM 25,650,430.32JANM 2021, pp. 196–197
14800Pembinaan dan Pembaikan Jalan LadangRM 128,000,000.00RM 13,050,000.00RM 13,033,332.03
99.9%
RM 13,033,332.03JANM 2021, pp. 196–197
15400Rancangan Pembangunan Sistem Saliran PertanianRM 50,000,000.00RM 5,819,700.00RM 5,797,114.23
99.6%
RM 5,797,114.23JANM 2021, pp. 196–197
15600Program Kawalan Banjir Kawasan PertanianRM 36,000,000.00RM 8,542,000.00RM 7,690,037.99
90.0%
RM 7,690,037.99JANM 2021, pp. 196–197
15700Rancangan-rancangan Pengairan, SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
15800Rancangan-rancangan Saliran, SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
16600Rancangan-rancangan Pengairan SabahRM 41,600,000.00RM 15,755,000.00RM 15,755,000.00
100.0%
RM 15,755,000.00JANM 2021, pp. 196–197
90100Dasar Perancangan Strategik (DPS)RM 58,315,000.00RM 3,990,100.00RM 3,987,924.51
100.0%
RM 3,987,924.51JANM 2021, pp. 196–197
90200Industri Tanaman, Ternakan dan Perikanan (ITTP)RM 268,707,400.00RM 19,826,000.00RM 18,880,927.89
95.2%
RM 18,880,927.89JANM 2021, pp. 196–197
90400Projek Rintis Penanaman Padi Pulut dan Pengeluaran Beras Pulut LangkawiRM 30,000,000.00RM 4,200,000.00RM 4,200,000.00
100.0%
RM 4,200,000.00JANM 2021, pp. 196–197
90700Latihan Pertanian KebangsaanRM 45,468,000.00RM 2,700,400.00RM 2,699,206.14
100.0%
RM 2,699,206.14JANM 2021, pp. 196–197
90800Pengurusan Maklumat (BPM)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
90900Industri Asas Tani (IAT)RM 3,000,000.00RM 1,366,000.00RM 1,363,975.00
99.8%
RM 1,363,975.00JANM 2021, pp. 196–197
Pertanian15 projectsEstimate RM 18.43 m · Spent RM 16.60 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
02000Program Pembangunan Komoditi TanamanNote: P.21 – Butiran 01300, 01700, 02000, 02400, 03700, 04900 dan 12500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 18,390,500.00RM 3,220,010.00RM 3,220,000.00
100.0%
RM 3,220,000.00JANM 2021, pp. 196–197
02100Program PenyelidikanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
02200Perkhidmatan Pengembangan PertanianRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
02400Naiktaraf Kemudahan Makmal Kimia PertaniNote: P.21 – Butiran 01300, 01700, 02000, 02400, 03700, 04900 dan 12500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 2,800,000.00RM 1,130,010.00RM 1,130,000.00
100.0%
RM 1,130,000.00JANM 2021, pp. 196–197
03300Kompleks PertanianRM 28,845,000.00RM 1,506,300.00RM 1,505,883.51
100.0%
RM 1,505,883.51JANM 2021, pp. 196–197
03500Pembangunan Industri Bunga dan Komoditi BerpotensiRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
03700Khidmat Sokongan TeknikalNote: P.21 – Butiran 01300, 01700, 02000, 02400, 03700, 04900 dan 12500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 10,000,000.00RM 60,010.00RM 59,152.50
98.6%
RM 59,152.50JANM 2021, pp. 196–197
04000Pembangunan Mempelbagai PertanianRM 26,000,000.00RM 7,632,000.00RM 6,511,586.01
85.3%
RM 6,511,586.01JANM 2021, pp. 196–197
04700Pembangunan Industri PadiRM 15,000,000.00RM 1,160,000.00RM 570,618.40
49.2%
RM 570,618.40JANM 2021, pp. 196–197
04800Pembangunan Industri KelapaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
04900Pembangunan Industri Buah-buahanNote: P.21 – Butiran 01300, 01700, 02000, 02400, 03700, 04900 dan 12500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 25,000,000.00RM 1,069,010.00RM 1,014,476.54
94.9%
RM 1,014,476.54JANM 2021, pp. 196–197
05100Kuarantin Tumbuhan SarawakRM 5,000,000.00RM 10,000.00RM 9,689.18
96.9%
RM 9,689.18JANM 2021, pp. 196–197
05200Pembangunan Penyelidikan Pertanian SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
12500Pembangunan Industri Tanaman MakananNote: P.21 – Butiran 01300, 01700, 02000, 02400, 03700, 04900 dan 12500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 152,000,000.00RM 230,010.00RM 230,000.00
100.0%
RM 230,000.00JANM 2021, pp. 196–197
41000Perkhidmatan Kuarantin dan Pemeriksaan Malaysia (MAQIS)RM 17,028,892.00RM 2,413,000.00RM 2,350,487.44
97.4%
RM 2,350,487.44JANM 2021, pp. 196–197
Perkhidmatan Veterinar19 projectsEstimate RM 6.83 m · Spent RM 6.81 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
10710Pembangunan Industri Lembu/Kerbau PedagingRM 43,876,400.00RM 885,000.00RM 882,335.30
99.7%
RM 882,335.30JANM 2021, pp. 196–197
10730Pembangunan Industri TenusuRM 16,400,000.00RM 236,000.00RM 224,411.89
95.1%
RM 224,411.89JANM 2021, pp. 196–197
10750Pengeluaran Bibit dan Baka LembuRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
10760Pengeluaran Bibit dan Baka Ternakan Kambing BebiriRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
10810Menaik Taraf dan Pembesaran Stesen Kuarantin Haiwan (SKH) Padang Besar PerlisRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
10820Pembangunan Makmal-makmal Veterinar KawasanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
10860Naiktaraf Abatsir Shah Alam, Selangor ke Tahap Veterinary Health Mark (VHM) dan Export Supply Chain Assurance System (ESCAS)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
10880Menaiktaraf Kemudahan LatihanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
10920Pengukuhan Penyelidikan dan Pembangunan (R&D)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
10930Sistem Maklumat Pengurusan VeterinarRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
22000Stesen Kuarantin Haiwan SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
22200Rumah Penyembelihan dan Kesihatan AwamRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 196–197
22300Kawasan Penternakan BabiRM 26,104,000.00RM 12,000.00RM 12,000.00
100.0%
RM 12,000.00JANM 2021, pp. 196–197
22500Projek Lembu PedagingRM 9,904,000.00RM 10,000.00RM 10,000.00
100.0%
RM 10,000.00JANM 2021, pp. 196–197
25000Pusat Pengeluaran Penyelidikan dan Latihan Haiwan SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
26000Pembangunan Ternakan SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
28000Makmal Penyelidikan PenyakitRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
29000Kesihatan Awam VeterinarRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
41800Jabatan Perkhidmatan Haiwan dan Perusahaan Ternak (JPHPT)RM 31,686,000.00RM 5,685,000.00RM 5,685,000.00
100.0%
RM 5,685,000.00JANM 2021, pp. 198–199
Perikanan17 projectsEstimate RM 2.79 m · Spent RM 2.79 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
17100Taman LautRM 37,130,000.00RM 2,290,000.00RM 2,289,782.56
100.0%
RM 2,289,782.56JANM 2021, pp. 198–199
22501PenyelidikanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
22503Peningkatan Kualiti Stok AkuakulturRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
22504Rangkaian Institut Latihan Akuakultur Malaysia (ILHAM)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
22600Perkhidmatan Perkembangan PerikananRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
23300Pengurusan dan Pemulihan IkanRM 23,515,000.00RM 1,000.00RM 0.00
0.0%
RM 0.00JANM 2021, pp. 198–199
23400Kemudahan PerikananRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
23500Pengembangan dan DidikanNote: P.21 – Butiran 23500 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 13,930,000.00RM 500,010.00RM 499,607.99
99.9%
RM 499,607.99JANM 2021, pp. 198–199
23702Pengurusan dan Perlindungan Sumber PerikananRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
24000Kemudahan Lampu Pemandu dan Penambatan VeselRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
25100Pusat Pembenihan Perikanan SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
25200Pembangunan Akuakultur SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
26400Peningkatan Produktiviti dan Pemuliharaan EkosistemRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
26900Pemantauan Maklumat Industri PerikananRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
27100Pembangunan Pejabat PerikananRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
27200Pembangunan Industri Tiram SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
27400Pembangunan Usahawan Nelayan/PengusahaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 198–199
Projects printed without a group subtotal47 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
10001Bahagian Dasar Perancangan StrategikRM 8,000,000.00RM 3,200,000.00RM 3,200,000.00
100.0%
RM 3,200,000.00JANM 2021, pp. 198–199
10002Bahagian PembangunanRM 400,000,000.00RM 22,675,100.00RM 22,674,466.90
100.0%
RM 22,674,466.90JANM 2021, pp. 198–199
10003Bahagian Industri Tanaman, Ternakan dan PerikananRM 3,200,000.00RM 3,200,000.00RM 3,200,000.00
100.0%
RM 3,200,000.00JANM 2021, pp. 198–199
10004Bahagian Industri Asas TaniRM 151,250,000.00RM 16,923,000.00RM 16,914,465.75
100.0%
RM 16,914,465.75JANM 2021, pp. 198–199
10005Bahagian Pemasaran dan EksportRM 35,000,000.00RM 6,000,000.00RM 5,994,139.10
99.9%
RM 5,994,139.10JANM 2021, pp. 198–199
10006Bahagian PelaburanRM 51,850,000.00RM 570,000.00RM 570,000.00
100.0%
RM 570,000.00JANM 2021, pp. 198–199
10007Bahagian Latihan Kemahiran PertanianRM 72,390,000.00RM 6,635,500.00RM 6,427,614.64
96.9%
RM 6,427,614.64JANM 2021, pp. 198–199
10008Unit Agroprenuer MudaRM 100,000,000.00RM 15,000,000.00RM 14,938,092.35
99.6%
RM 14,938,092.35JANM 2021, pp. 198–199
10009Bahagian Pengurusan MaklumatRM 2,500,000.00RM 500,000.00RM 498,800.00
99.8%
RM 498,800.00JANM 2021, pp. 198–199
10010Bahagian KewanganRM 325,000,000.00RM 61,500,000.00RM 61,455,728.88
99.9%
RM 61,455,728.88JANM 2021, pp. 198–199
10012Bahagian Industri Padi dan BerasRM 5,000,000.00RM 1,000,000.00RM 997,874.00
99.8%
RM 997,874.00JANM 2021, pp. 198–199
10013Bahagian Pengairan dan Saliran PertanianRM 83,400,000.00RM 89,000.00RM 77,791.00
87.4%
RM 77,791.00JANM 2021, pp. 198–199
20001IADA - Barat Laut SelangorRM 34,500,000.00RM 2,550,000.00RM 2,549,658.47
100.0%
RM 2,549,658.47JANM 2021, pp. 198–199
20002IADA - Seberang PerakRM 27,000,000.00RM 2,200,000.00RM 2,199,723.90
100.0%
RM 2,199,723.90JANM 2021, pp. 198–199
20003IADA - KerianRM 14,500,000.00RM 3,120,535.00RM 3,120,118.60
100.0%
RM 3,120,118.60JANM 2021, pp. 198–199
20004IADA - Kemasin SemerakRM 4,400,000.00RM 1,160,000.00RM 1,155,467.80
99.6%
RM 1,155,467.80JANM 2021, pp. 198–199
20005IADA - KETARARM 9,200,000.00RM 1,350,000.00RM 1,349,982.08
100.0%
RM 1,349,982.08JANM 2021, pp. 198–199
20006IADA - Pulau PinangRM 22,100,000.00RM 3,050,000.00RM 3,025,992.90
99.2%
RM 3,025,992.90JANM 2021, pp. 198–199
20007IADA - Kalaka Saribas BetongRM 28,150,000.00RM 3,560,122.00RM 3,554,016.40
99.8%
RM 3,554,016.40JANM 2021, pp. 198–199
20008IADA - SamarahanRM 26,750,000.00RM 5,500,000.00RM 5,499,968.10
100.0%
RM 5,499,968.10JANM 2021, pp. 198–199
20009IADA - PekanRM 12,500,000.00RM 2,500,000.00RM 2,500,000.00
100.0%
RM 2,500,000.00JANM 2021, pp. 198–199
20010IADA - RompinRM 16,000,000.00RM 2,800,000.00RM 2,799,838.98
100.0%
RM 2,799,838.98JANM 2021, pp. 198–199
20011IADA - Kota BeludRM 9,000,000.00RM 1,800,000.00RM 1,792,992.00
99.6%
RM 1,792,992.00JANM 2021, pp. 198–199
20012IADA - Batang LuparRM 6,300,000.00RM 780,000.00RM 779,977.00
100.0%
RM 779,977.00JANM 2021, pp. 198–199
30001Jabatan Pertanian Malaysia (DOA)RM 341,500,000.00RM 44,336,000.00RM 43,369,236.60
97.8%
RM 43,369,236.60JANM 2021, pp. 198–199
30002Jabatan Pertanian SabahRM 146,500,000.00RM 9,290,000.00RM 9,290,000.00
100.0%
RM 9,290,000.00JANM 2021, pp. 198–199
30003Jabatan Pertanian SarawakRM 99,650,000.00RM 8,550,000.00RM 7,990,638.43
93.5%
RM 7,990,638.43JANM 2021, pp. 198–199
30004Jabatan Perikanan Malaysia (DOF)RM 383,450,000.00RM 32,801,500.00RM 32,550,083.41
99.2%
RM 32,550,083.41JANM 2021, pp. 198–199
30005Jabatan Perikanan SabahRM 53,000,000.00RM 3,990,000.00RM 3,739,823.46
93.7%
RM 3,739,823.46JANM 2021, pp. 198–199
30006Jabatan Perikanan Laut SarawakRM 78,550,000.00RM 11,731,000.00RM 10,974,781.60
93.5%
RM 10,974,781.60JANM 2021, pp. 198–199
30007Jabatan Perkhidmatan Veterinar Malaysia (DVS)RM 217,788,000.00RM 12,374,000.00RM 12,147,898.43
98.2%
RM 12,147,898.43JANM 2021, pp. 198–199
30008Jabatan Perkhidmatan Veterinar SabahRM 55,440,520.00RM 15,000.00RM 15,000.00
100.0%
RM 15,000.00JANM 2021, pp. 198–199
30009Jabatan Perkhidmatan Veterinar SarawakRM 52,500,000.00RM 10,280,000.00RM 10,279,970.00
100.0%
RM 10,279,970.00JANM 2021, pp. 198–199
30010Jabatan Perkhidmatan Kuarantin dan Pemeriksaan Malaysia (MAQIS)RM 138,000,000.00RM 2,379,800.00RM 2,168,409.16
91.1%
RM 2,168,409.16JANM 2021, pp. 198–199
40001Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI)RM 153,800,000.00RM 22,650,000.00RM 22,650,000.00
100.0%
RM 22,650,000.00JANM 2021, pp. 198–199
40002Lembaga Pemasaran Pertanian Persekutuan (FAMA)RM 135,250,000.00RM 18,940,000.00RM 18,940,000.00
100.0%
RM 18,940,000.00JANM 2021, pp. 198–199
40003Lembaga Pertubuhan Peladang (LPP)RM 311,272,250.00RM 30,185,000.00RM 30,185,000.00
100.0%
RM 30,185,000.00JANM 2021, pp. 198–199
40004Lembaga Perindustrian Nanas Malaysia (LPNM)RM 137,000,000.00RM 8,025,000.00RM 8,025,000.00
100.0%
RM 8,025,000.00JANM 2021, pp. 200–201
40005Lembaga Kemajuan Ikan Malaysia (LKIM)RM 102,000,000.00RM 11,250,100.00RM 11,250,100.00
100.0%
RM 11,250,100.00JANM 2021, pp. 200–201
40006Lembaga Kemajuan Pertanian Kemubu (KADA)RM 94,500,000.00RM 8,714,000.00RM 8,714,000.00
100.0%
RM 8,714,000.00JANM 2021, pp. 200–201
40007Lembaga Kemajuan Pertanian Muda ((MADA)RM 144,300,000.00RM 9,485,000.00RM 9,485,000.00
100.0%
RM 9,485,000.00JANM 2021, pp. 200–201
40008Agro BankRM 500,000,000.00RM 60,000,000.00RM 60,000,000.00
100.0%
RM 60,000,000.00JANM 2021, pp. 200–201
40009Malaysian Bioeconomy Development CorporationRM 85,000,000.00RM 5,000,000.00RM 5,000,000.00
100.0%
RM 5,000,000.00JANM 2021, pp. 200–201
41100Jabatan Pertanian Semenanjung (DOA)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 200–201
41700Jabatan Perkhidmatan Veterinar Semenanjung (DVS)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 200–201
51000Dana Jaminan MakananNote: P.21 – Butiran 51000 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2022 telah dimasuk kira sebagai pendahuluan.RM 540,000,000.00RM 459,081,010.00RM 458,511,648.28
99.9%
RM 458,511,648.28JANM 2021, pp. 200–201
94000Projek Pemacu PertanianRM 2,401,349,834.00RM 60,145,000.00RM 60,113,177.20
100.0%
RM 60,113,177.20JANM 2021, pp. 200–201

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2021, Statement of Development Expenditure (Lampiran 2).