Estimate 2018Anggaran
RM 1.95 bn
Spent 2018Sebenar
RM 1.81 bn
92.8% of the estimate; RM 163.90 m loan-funded
Total cost of projectsKos Keseluruhan
RM 42.94 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 4.78 bn
Totals as printed, JANM 2018, pp. 218–219

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
KEMENTERIAN/JABATAN KETUA PENGARAH TANAH DAN GALIAN (JKPTG)/INSTUN/MaCGDI/e-TanahRM 39.75 mRM 38.63 m
97.2%
RM 115.30 mJANM 2018, pp. 216–217
Jabatan Ukur dan Pemetaan Malaysia (JUPEM)RM 44.42 mRM 44.25 m
99.6%
RM 324.26 mJANM 2018, pp. 216–217
Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia (FRIM)RM 147.01 mRM 141.00 m
95.9%
RM 182.38 mJANM 2018, pp. 216–217
Jabatan Perhutanan Semenanjung Malaysia (JPSM)RM 26.83 mRM 26.67 m
99.4%
RM 73.64 mJANM 2018, pp. 216–217
Perhutanan SarawakRM 9.30 mRM 8.76 m
94.2%
RM 39.08 mJANM 2018, pp. 216–217
Perhutanan SabahRM 12.51 mRM 12.45 m
99.5%
RM 42.13 mJANM 2018, pp. 216–217
Jumlah Perhutanan Semenanjung, Sarawak dan Sabahsums Jabatan Perhutanan Semenanjung Malaysia (JPSM), Perhutanan Sarawak, Perhutanan SabahRM 48.64 mRM 47.88 m
98.4%
RM 154.85 mJANM 2018, pp. 216–217
Jabatan Mineral dan GeosainsRM 34.81 mRM 34.59 m
99.4%
RM 113.99 mJANM 2018, pp. 218–219
Pengairan dan SaliranRM 904.03 mRM 889.55 m
98.4%
RM 3.07 bnJANM 2018, pp. 218–219

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

KEMENTERIAN/JABATAN KETUA PENGARAH TANAH DAN GALIAN (JKPTG)/INSTUN/MaCGDI/e-Tanah7 projectsEstimate RM 39.75 m · Spent RM 38.63 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
02301Projek e-TanahRM 162,262,363.00RM 1,034,800.00RM 1,033,627.81
99.9%
RM 25,351,190.93JANM 2018, pp. 216–217
02302Sistem e-JKPTGRM 29,077,768.00RM 100.00RM 0.00
0.0%
RM 20,092,366.17JANM 2018, pp. 216–217
02303Rekabentuk Piawaian PejabatRM 55,883,876.00RM 0.00RM 0.00RM 132,870.72JANM 2018, pp. 216–217
02304Bayaran Khas Pengambilan Balik TanahRM 800,638,000.00RM 0.00RM 0.00RM 689,958.00JANM 2018, pp. 216–217
03302Kemudahan Pengurusan Kementerian (BTM)RM 455,217,504.00RM 32,069,800.00RM 30,948,585.44
96.5%
RM 36,520,314.22JANM 2018, pp. 216–217
03303Pembinaan Institut Latihan Tanah, Ukur dan Pemetaan Negara (INSTUN)RM 43,550,000.00RM 2,820,378.00RM 2,817,609.46
99.9%
RM 12,317,805.64JANM 2018, pp. 216–217
03304Infrastruktur Data Geospatial Negara (MaCGDI)RM 65,670,000.00RM 3,828,779.00RM 3,828,772.08
100.0%
RM 20,198,053.51JANM 2018, pp. 216–217
Jabatan Ukur dan Pemetaan Malaysia (JUPEM)7 projectsEstimate RM 44.42 m · Spent RM 44.25 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
02701Sistem Pengkalan Data Geodetik (SPDG)RM 52,000,000.00RM 460,450.00RM 460,448.00
100.0%
RM 19,458,673.37JANM 2018, pp. 216–217
02703e-PemetaanRM 223,700,000.00RM 5,594,880.00RM 5,544,839.62
99.1%
RM 97,339,258.42JANM 2018, pp. 216–217
02801Projek Penentuan dan Pengukuran Sempadan Antarabangsa (Darat & Maritim) Malaysia Negara-negara jiranNote: P.23– Butiran 02801 - Peruntukan sebanyak RM100 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 14,300,000.00RM 4,000,100.00RM 3,983,473.27
99.6%
RM 14,211,995.73JANM 2018, pp. 216–217
02803Pewujudan Sistem Pemetaan UtilitiRM 34,000,000.00RM 0.00RM 0.00RM 3,486,176.00JANM 2018, pp. 216–217
02804eKADASTERRM 230,253,600.00RM 27,194,130.00RM 27,146,619.58
99.8%
RM 106,939,907.11JANM 2018, pp. 216–217
02806Peningkatan Local Area Network (LAN) & Wide Area Network (WAN) JUPEMRM 32,400,000.00RM 3,144,430.00RM 3,090,746.77
98.3%
RM 10,626,491.23JANM 2018, pp. 216–217
02811Pembangunan Sistem Bahagian Geospatial Pertahanan (BGSP)RM 100,854,000.00RM 4,025,000.00RM 4,025,000.00
100.0%
RM 72,201,254.68JANM 2018, pp. 216–217
Projects printed without a group subtotal8 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
06400Rancangan Bekalan Air Negeri JohorRM 648,834,311.00RM 2,697,327.00RM 2,323,693.12
86.2%
RM 2,323,693.12JANM 2018, pp. 216–217
06500Rancangan Bekalan Air Negeri KedahRM 1,520,850,570.00RM 35,737,614.00RM 30,905,128.48
86.5%
RM 30,905,128.48JANM 2018, pp. 216–217
07000Rancangan Bekalan Air Negeri KelantanRM 89,997,644.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 216–217
07100PERHILITANRM 271,146,513.00RM 33,641,732.00RM 33,613,175.75
99.9%
RM 82,478,693.09JANM 2018, pp. 216–217
07200Jabatan Alam SekitarRM 93,556,138.00RM 29,858,048.00RM 29,858,047.96
100.0%
RM 93,556,137.58JANM 2018, pp. 216–217
07300Bahagian Konservasi dan Pemuliharaan Alam Sekitar (KAS)RM 3,429,723.00RM 40,032.00RM 40,031.20
100.0%
RM 3,429,722.37JANM 2018, pp. 216–217
07400Rancangan Bekalan Air Negeri MelakaRM 459,053,212.00RM 21,399,294.00RM 20,886,520.47
97.6%
RM 20,886,520.47JANM 2018, pp. 216–217
07800Rancangan Bekalan Air Negeri SembilanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 216–217
Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia (FRIM)3 projectsEstimate RM 147.01 m · Spent RM 141.00 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
08100Pusat Pembangunan Produk HerbaRM 4,500,000.00RM 1,496,000.00RM 1,232,405.00
82.4%
RM 2,732,405.00JANM 2018, pp. 216–217
08400Rancangan Bekalan Air Negeri PerakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 216–217
08510Pembangunan Penyelidikan Sumber, Pengurusan dan HasilRM 139,470,000.00RM 22,141,595.00RM 22,141,595.00
100.0%
RM 62,025,595.00JANM 2018, pp. 216–217
Jabatan Perhutanan Semenanjung Malaysia (JPSM)5 projectsEstimate RM 26.83 m · Spent RM 26.67 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
08600Pengurusan Hutan Secara Berkekalan (JPSM)RM 269,912,630.00RM 23,864,500.00RM 23,707,720.88
99.3%
RM 55,917,849.62JANM 2018, pp. 216–217
08601Penanaman Pokok Bakau & Spesis-spesis Yang Sesuai di Persisiran Pantai (JPSM)RM 14,200,000.00RM 2,000,000.00RM 1,989,855.51
99.5%
RM 9,111,118.59JANM 2018, pp. 216–217
09100Rancangan Bekalan Air Negeri SelangorRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 216–217
09200Pengembangan Maklumat Perhutanan dan IT dan K-Perhutanan (JPSM)RM 13,700,000.00RM 968,200.00RM 968,199.00
100.0%
RM 8,610,022.92JANM 2018, pp. 216–217
09400Rancangan Bekalan Air Negeri TerengganuRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 216–217
Perhutanan Sarawak2 projectsEstimate RM 9.30 m · Spent RM 8.76 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
09900Projek Kemajuan Perusahaan Hutan; Sistem Maklumat Bersepadu Perhutanan SarawakRM 64,240,000.00RM 9,002,000.00RM 8,502,437.17
94.5%
RM 38,038,989.42JANM 2018, pp. 216–217
10100Pemuliharaan Hidupan Liar dan Projek Kerjasama Antarabangsa PerhutananRM 8,000,000.00RM 299,100.00RM 259,952.62
86.9%
RM 1,041,008.17JANM 2018, pp. 216–217
Perhutanan Sabah6 projectsEstimate RM 12.51 m · Spent RM 12.45 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
10200Penubuhan Stesen Hutan Sejadi Sabah Pusat Perhutanan Bersepadu Wilayah Kota KinabaluRM 8,000,000.00RM 24,644.00RM 24,644.00
100.0%
RM 1,419,959.60JANM 2018, pp. 216–217
10300Pembangunan Teknologi Penggunaan Kayu Latihan Pencegahan Kebakaran HutanRM 7,761,850.00RM 1,862,873.00RM 1,808,456.25
97.1%
RM 5,708,712.15JANM 2018, pp. 216–217
10400Perancangan dan Pengurusan HutanRM 3,600,000.00RM 926,625.00RM 926,623.50
100.0%
RM 1,876,623.50JANM 2018, pp. 216–217
10800Pembangunan Kawasan Penyelidikan Hutan Paya Gambut Klias Galeri Perhutanan dan Penubuhan Seed Orchard serta Spesis TempatanRM 4,224,000.00RM 667,500.00RM 666,061.46
99.8%
RM 2,027,333.33JANM 2018, pp. 216–217
10803Program Pembangunan Mampan Sumber Hutan SabahRM 34,920,608.00RM 3,305,000.00RM 3,303,481.40
100.0%
RM 11,877,770.42JANM 2018, pp. 216–217
10804Projek Heart of Borneo (HOB) Negeri SabahRM 41,567,000.00RM 5,721,000.00RM 5,720,979.13
100.0%
RM 19,215,846.41JANM 2018, pp. 216–217
Jabatan Mineral dan Geosains10 projectsEstimate RM 34.81 m · Spent RM 34.59 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
10900Mineral Perindustrian Semenanjung MalaysiaRM 74,200,000.00RM 10,900,000.00RM 10,864,616.82
99.7%
RM 42,405,192.73JANM 2018, pp. 218–219
11200Penyaluran Air Antara NegeriRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 218–219
11300Rancangan Bekalan Air LabuanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 218–219
11400Rancangan Bekalan Air SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 218–219
11600Rancangan Bekalan Air SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2018, pp. 218–219
11800Kajian Geobencana NegaraRM 12,000,000.00RM 2,414,000.00RM 2,398,382.33
99.3%
RM 7,346,612.91JANM 2018, pp. 218–219
11900Kajian Sumber Air Tanah NegaraRM 113,500,000.00RM 13,000,000.00RM 12,973,010.32
99.8%
RM 37,421,007.95JANM 2018, pp. 218–219
12300Pemulihan Tanah Bekas Lombong dan KuariRM 5,500,000.00RM 500,000.00RM 460,449.96
92.1%
RM 460,449.96JANM 2018, pp. 218–219
12500Pemetaan Geologi NegaraRM 79,090,000.00RM 6,844,078.00RM 6,763,149.01
98.8%
RM 25,225,945.08JANM 2018, pp. 218–219
12600Peningkatan Taraf dan Kemudahan Makmal Jabatan Mineral dan GeosainsRM 12,000,000.00RM 1,150,000.00RM 1,132,386.21
98.5%
RM 1,132,386.21JANM 2018, pp. 218–219
Pengairan dan Saliran16 projectsEstimate RM 904.03 m · Spent RM 889.55 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
13200Peningkatan Inovasi dan Kemajuan TeknologiRM 44,300,000.00RM 1,022,000.00RM 1,016,182.18
99.4%
RM 5,923,987.17JANM 2018, pp. 218–219
13400Pembangunan Sumber Air NegaraRM 97,900,000.00RM 13,444,000.00RM 13,356,435.21
99.3%
RM 20,586,217.43JANM 2018, pp. 218–219
13500Pemulihan EmpanganRM 436,000,000.00RM 9,366,500.00RM 9,295,736.48
99.2%
RM 53,220,657.26JANM 2018, pp. 218–219
13600Jentera-jentera dan KelengkapanRM 54,000,000.00RM 21,962,400.00RM 21,962,188.04
100.0%
RM 34,832,140.31JANM 2018, pp. 218–219
13700Tanggungan-tanggungan untuk Pengambilan TanahRM 105,000,000.00RM 41,594,161.00RM 41,404,350.66
99.5%
RM 88,502,152.98JANM 2018, pp. 218–219
13900Rancangan Kawalan dan Isyarat Bahaya BanjirRM 598,000,000.00RM 25,940,000.00RM 18,384,466.35
70.9%
RM 98,100,664.63JANM 2018, pp. 218–219
14100Bangunan dan Pejabat JPSRM 6,800,000.00RM 1,785,000.00RM 1,785,000.00
100.0%
RM 5,100,701.72JANM 2018, pp. 218–219
14200Pemulihan StrukturRM 45,920,000.00RM 4,644,000.00RM 4,641,884.17
100.0%
RM 8,941,482.57JANM 2018, pp. 218–219
14500Menaiktaraf Infrastruktur Saliran Bandar, Tebatan BanjirRM 134,140,000.00RM 12,906,390.00RM 12,886,574.65
99.8%
RM 31,909,395.53JANM 2018, pp. 218–219
15000Kerja-kerja Kecil JPS, Pelbagai NegeriRM 100,000,000.00RM 30,973,000.00RM 30,828,121.15
99.5%
RM 99,854,981.13JANM 2018, pp. 218–219
15100Mencegah Hakisan PantaiRM 796,115,985.00RM 29,670,820.00RM 28,935,524.18
97.5%
RM 90,018,499.93JANM 2018, pp. 218–219
15200Memperbaiki, Mengindah, Membersih & Merawat Air Sungai-sungai & Infrastruktur MASMARM 644,680,000.00RM 25,091,600.00RM 20,876,184.76
83.2%
RM 89,461,857.42JANM 2018, pp. 218–219
15300Mengorek Kuala-kuala SungaiRM 2,074,772,906.00RM 253,908,659.00RM 253,720,074.86
99.9%
RM 820,175,510.89JANM 2018, pp. 218–219
15400Rancangan Pengurusan Sungai Saliran Mesra AlamRM 966,568,365.00RM 36,724,341.00RM 36,671,007.85
99.8%
RM 317,034,074.46JANM 2018, pp. 218–219
16700Rancangan Tebatan Banjir (RTB) dan Saliran BandarRM 9,371,304,625.00RM 392,138,844.00RM 391,696,803.79
99.9%
RM 1,302,400,455.90JANM 2018, pp. 218–219
16900Penyelidikan dan PembangunanRM 63,000,000.00RM 2,858,317.00RM 2,090,946.52
73.2%
RM 6,348,399.27JANM 2018, pp. 218–219
Projects printed without a group subtotal20 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
17000NAHRIMRM 95,544,555.00RM 14,280,000.00RM 13,582,139.95
95.1%
RM 43,913,251.18JANM 2018, pp. 218–219
17100Taman LautRM 94,990,000.00RM 12,992,776.00RM 12,273,730.60
94.5%
RM 35,499,257.36JANM 2018, pp. 218–219
17200Bahagian Pengurusan Biodiversiti dan PerhutananRM 73,014,000.00RM 7,102,000.00RM 6,996,846.58
98.5%
RM 34,811,342.68JANM 2018, pp. 218–219
17300Bahagian Mineral dan GeosainsRM 1,350,000.00RM 280,000.00RM 272,382.00
97.3%
RM 672,198.18JANM 2018, pp. 218–219
17500Pasukan Teras Biokeselamatan (PTB)RM 3,658,156.00RM 110,000.00RM 110,000.00
100.0%
RM 2,178,090.29JANM 2018, pp. 218–219
20000Rancangan Bekalan Air Negeri KelantanNote: P.23– Butiran 20000P - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 121,700,000.00RM 12,590,396.00RM 12,588,479.00
100.0%
RM 12,588,479.00JANM 2018, pp. 218–219
21000Rancangan Bekalan Air Negeri SembilanNote: P.23– Butiran 21000, 23000, 27000, 30000 dan 26000 - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 916,180,992.00RM 1,536.00RM 600.00
39.1%
RM 600.00JANM 2018, pp. 218–219
22000Rancangan Bekalan Air Negeri PahangNote: P.23– Butiran 22000P - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 589,533,357.00RM 7,223,420.00RM 7,040,847.00
97.5%
RM 7,040,847.00JANM 2018, pp. 218–219
23000Rancangan Bekalan Air Negeri PerakNote: P.23– Butiran 21000, 23000, 27000, 30000 dan 26000 - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 6,000,000.00RM 50,010.00RM 0.00
0.0%
RM 0.00JANM 2018, pp. 218–219
24000Rancangan Bekalan Air Negeri SelangorNote: P.23– Butiran 24000P - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 312,932,242.00RM 18,050,010.00RM 17,676,943.00
97.9%
RM 17,676,943.00JANM 2018, pp. 218–219
25000Rancangan Bekalan Air Negeri TerengganuNote: P.23– Butiran 25000P - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 5,000,000.00RM 1,000,010.00RM 0.00
0.0%
RM 0.00JANM 2018, pp. 218–219
26000Rancangan Bekalan Air Negeri Pulau PinangNote: P.23– Butiran 21000, 23000, 27000, 30000 dan 26000 - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 1,080,186,813.00RM 16,318,945.00RM 16,318,933.08
100.0%
RM 16,318,933.08JANM 2018, pp. 218–219
27000Rancangan Bekalan Air LabuanNote: P.23– Butiran 21000, 23000, 27000, 30000 dan 26000 - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 259,085,244.00RM 7,167,302.00RM 4,365,172.93
60.9%
RM 4,365,172.93JANM 2018, pp. 218–219
28000Rancangan Bekalan Air SabahNote: P.23– Butiran 28000P - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 1,930,895,386.00RM 43,142,307.00RM 36,585,164.35
84.8%
RM 36,585,164.35JANM 2018, pp. 218–219
29000Rancangan Bekalan Air SarawakNote: P.23– Butiran 29000P - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 2,032,248,178.00RM 52,377,000.00RM 42,461,967.00
81.1%
RM 42,461,967.00JANM 2018, pp. 218–219
30000Penyaluran Air Antara NegeriNote: P.23– Butiran 21000, 23000, 27000, 30000 dan 26000 - Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 3,739,013,381.00RM 5,663,994.00RM 4,186,587.66
73.9%
RM 4,186,587.66JANM 2018, pp. 218–219
31000Rancangan Bekalan Air Negeri PerlisNote: P.23– Butiran 31000P - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 0.00RM 10.00RM 0.00
0.0%
RM 0.00JANM 2018, pp. 218–219
80000Projek Pembentungan NegaraNote: P.23– Butiran 80000P - Peruntukan sebanyak RM52,121,533 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 7,872,275,497.00RM 518,397,856.00RM 434,722,411.14
83.9%
RM 434,722,411.14JANM 2018, pp. 218–219
95000NRW NasionalRM 1,903,753,064.00RM 17,191,144.00RM 6,323,907.61
36.8%
RM 6,323,907.61JANM 2018, pp. 218–219
96000Bahagian Bekalan Air, KETTHARM 63,000,000.00RM 395,637.00RM 286,047.14
72.3%
RM 286,047.14JANM 2018, pp. 218–219

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2018, Statement of Development Expenditure (Lampiran 2).