Kementerian Air, Tanah dan Sumber Asli
A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2019, from the audited Statement of Development Expenditure.
The same code is printed as Kementerian Sumber Asli dan Alam Sekitar in 2016–2017, Kementerian Tenaga dan Sumber Asli in 2020–2022, Kementerian Sumber Asli, Alam Sekitar dan Perubahan Iklim in 2023 and Kementerian Sumber Asli dan Kelestarian Alam in 2024–2025.
All development votes in 2019 · Operating vote B.23 · P.23 in Budget 2027
By group
The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.
| Group | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|
| KEMENTERIAN/JABATAN KETUA PENGARAH TANAH DAN GALIAN (JKPTG)/INSTUN/MaCGDI/e-Tanah | RM 42.34 m | RM 42.34 m | 100.0% | RM 157.64 m | JANM 2019, pp. 174–175 |
| Jabatan Ukur dan Pemetaan Malaysia (JUPEM) | RM 67.46 m | RM 67.44 m | 100.0% | RM 391.71 m | JANM 2019, pp. 174–175 |
| Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia (FRIM) | RM 30.30 m | RM 30.30 m | 100.0% | RM 95.06 m | JANM 2019, pp. 174–175 |
| Jabatan Perhutanan Semenanjung Malaysia (JPSM) | RM 26.56 m | RM 25.61 m | 96.4% | RM 99.25 m | JANM 2019, pp. 174–175 |
| Perhutanan Sarawak | RM 18.16 m | RM 16.35 m | 90.1% | RM 55.43 m | JANM 2019, pp. 174–175 |
| Perhutanan Sabah | RM 15.02 m | RM 15.01 m | 99.9% | RM 57.13 m | JANM 2019, pp. 174–175 |
| Jumlah Perhutanan Semenanjung, Sarawak dan Sabahsums Jabatan Perhutanan Semenanjung Malaysia (JPSM), Perhutanan Sarawak, Perhutanan Sabah | RM 59.73 m | RM 56.96 m | 95.4% | RM 211.81 m | JANM 2019, pp. 174–175 |
| Jabatan Mineral dan Geosains | RM 45.95 m | RM 45.36 m | 98.7% | RM 161.55 m | JANM 2019, pp. 174–175 |
| Pengairan dan Saliran | RM 794.02 m | RM 790.91 m | 99.6% | RM 3.86 bn | JANM 2019, pp. 176–177 |
Every project
Each project exactly as printed, to the sen, with the two-page spread it was read from.
KEMENTERIAN/JABATAN KETUA PENGARAH TANAH DAN GALIAN (JKPTG)/INSTUN/MaCGDI/e-Tanah7 projectsEstimate RM 42.34 m · Spent RM 42.34 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 02301 | Projek e-Tanah | RM 185,882,363.00 | RM 0.00 | RM 0.00 | RM 25,351,190.93 | JANM 2019, pp. 174–175 | |
| 02302 | Sistem e-JKPTG | RM 77,017,768.00 | RM 918,278.00 | RM 917,748.00 | 99.9% | RM 21,010,114.17 | JANM 2019, pp. 174–175 |
| 02303 | Rekabentuk Piawaian Pejabat | RM 55,883,876.00 | RM 0.00 | RM 0.00 | RM 132,870.72 | JANM 2019, pp. 174–175 | |
| 02304 | Bayaran Khas Pengambilan Balik Tanah | RM 800,638,000.00 | RM 0.00 | RM 0.00 | RM 689,958.00 | JANM 2019, pp. 174–175 | |
| 03302 | Kemudahan Pengurusan Kementerian (BTM) | RM 455,217,504.00 | RM 32,571,900.00 | RM 32,571,819.52 | 100.0% | RM 69,092,133.74 | JANM 2019, pp. 174–175 |
| 03303 | Pembinaan Institut Latihan Tanah, Ukur dan Pemetaan Negara (INSTUN) | RM 44,478,000.00 | RM 4,390,693.00 | RM 4,390,690.43 | 100.0% | RM 16,708,496.07 | JANM 2019, pp. 174–175 |
| 03304 | Infrastruktur Data Geospatial Negara (MaCGDI) | RM 65,670,000.00 | RM 4,456,800.00 | RM 4,456,689.48 | 100.0% | RM 24,654,742.99 | JANM 2019, pp. 174–175 |
Jabatan Ukur dan Pemetaan Malaysia (JUPEM)7 projectsEstimate RM 67.46 m · Spent RM 67.44 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 02701 | Sistem Pengkalan Data Geodetik (SPDG) | RM 52,000,000.00 | RM 3,545,800.00 | RM 3,545,700.00 | 100.0% | RM 23,004,373.37 | JANM 2019, pp. 174–175 |
| 02703 | Pemetaan | RM 223,700,000.00 | RM 29,568,080.00 | RM 29,555,813.59 | 100.0% | RM 126,895,072.01 | JANM 2019, pp. 174–175 |
| 02801 | Projek Penandaan, Pengukuran dan Penyenggaraan Sempadan Antarabangsa | RM 22,300,000.00 | RM 3,780,000.00 | RM 3,779,958.67 | 100.0% | RM 17,991,954.40 | JANM 2019, pp. 174–175 |
| 02803 | Pewujudan Sistem Pemetaan Utiliti | RM 34,000,000.00 | RM 6,791,910.00 | RM 6,791,852.96 | 100.0% | RM 10,278,028.96 | JANM 2019, pp. 174–175 |
| 02804 | eKADASTER | RM 230,253,600.00 | RM 8,629,860.00 | RM 8,627,831.90 | 100.0% | RM 115,567,739.01 | JANM 2019, pp. 174–175 |
| 02806 | Peningkatan Local Area Network (LAN) & Wide Area Network (WAN) JUPEM | RM 32,400,000.00 | RM 4,254,220.00 | RM 4,251,911.66 | 100.0% | RM 14,878,402.89 | JANM 2019, pp. 174–175 |
| 02811 | Pembangunan Sistem Bahagian Geospatial Pertahanan (BGSP) | RM 100,854,000.00 | RM 10,891,320.00 | RM 10,891,291.74 | 100.0% | RM 83,092,546.42 | JANM 2019, pp. 174–175 |
Projects printed without a group subtotal1 project
These projects count toward the vote total but are not printed under a group heading.
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 07100 | PERHILITAN | RM 345,681,673.00 | RM 48,146,404.00 | RM 47,959,653.32 | 99.6% | RM 130,438,346.41 | JANM 2019, pp. 174–175 |
Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia (FRIM)2 projectsEstimate RM 30.30 m · Spent RM 30.30 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 08100 | Pusat Pembangunan Produk Herba | RM 4,500,000.00 | RM 1,304,000.00 | RM 1,304,000.00 | 100.0% | RM 4,036,405.00 | JANM 2019, pp. 174–175 |
| 08510 | Pembangunan Penyelidikan Sumber, Pengurusan dan Hasil | RM 152,395,000.00 | RM 28,996,000.00 | RM 28,996,000.00 | 100.0% | RM 91,021,595.00 | JANM 2019, pp. 174–175 |
Jabatan Perhutanan Semenanjung Malaysia (JPSM)3 projectsEstimate RM 26.56 m · Spent RM 25.61 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 08600 | Pengurusan Hutan Secara Berkekalan (JPSM) | RM 291,721,630.00 | RM 23,178,422.00 | RM 22,229,369.61 | 95.9% | RM 78,147,219.23 | JANM 2019, pp. 174–175 |
| 08601 | Penanaman Pokok Bakau dan Spesis-spesis Yang Sesuai di Persisiran Pantai (JPSM) | RM 14,200,000.00 | RM 1,885,200.00 | RM 1,884,313.15 | 100.0% | RM 10,995,431.74 | JANM 2019, pp. 174–175 |
| 09200 | Pengembangan Maklumat Perhutanan dan IT dan K-Perhutanan (JPSM) | RM 13,700,000.00 | RM 1,494,800.00 | RM 1,492,954.00 | 99.9% | RM 10,102,976.92 | JANM 2019, pp. 174–175 |
Perhutanan Sarawak2 projectsEstimate RM 18.16 m · Spent RM 16.35 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 09900 | Projek Kemajuan Perusahaan Hutan Sistem Maklumat Bersepadu Perhutanan | RM 77,381,763.92 | RM 17,905,000.00 | RM 16,102,347.72 | 89.9% | RM 54,141,337.14 | JANM 2019, pp. 174–175 |
| 10100 | Pemuliharaan Hidupan Liar dan Projek Kerjasama Antarabangsa Perhutanan | RM 8,000,000.00 | RM 250,000.00 | RM 248,304.70 | 99.3% | RM 1,289,312.87 | JANM 2019, pp. 174–175 |
Perhutanan Sabah6 projectsEstimate RM 15.02 m · Spent RM 15.01 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10200 | Penubuhan Stesen Hutan Sejadi Sabah Pusat Perhutanan Bersepadu Wilayah K.Kinabalu | RM 8,000,000.00 | RM 1,761,740.00 | RM 1,761,695.18 | 100.0% | RM 3,181,654.78 | JANM 2019, pp. 174–175 |
| 10300 | Pembangunan Teknologi Penggunaan Kayu Latihan Kebakaran Hutan | RM 9,516,850.00 | RM 1,300,000.00 | RM 1,299,769.10 | 100.0% | RM 7,008,481.25 | JANM 2019, pp. 174–175 |
| 10400 | Perancangan dan Pengurusan Hutan | RM 18,806,917.00 | RM 1,375,000.00 | RM 1,374,635.42 | 100.0% | RM 3,251,258.92 | JANM 2019, pp. 174–175 |
| 10800 | Pembangunan Kawasan Penyelidikan Hutan Paya Gambut Klias Galeri Perhutanan dan Penubuhan Seed Orchard serta Spesis Tempatan | RM 4,224,000.00 | RM 600,000.00 | RM 598,085.06 | 99.7% | RM 2,625,418.39 | JANM 2019, pp. 174–175 |
| 10803 | Program Pembangunan Mampan Sumber Hutan Sabah | RM 34,920,608.00 | RM 5,000,000.00 | RM 4,991,275.97 | 99.8% | RM 16,869,046.39 | JANM 2019, pp. 174–175 |
| 10804 | Projek Heart of Borneo (HOB) Negeri Sabah | RM 41,567,000.00 | RM 4,980,500.00 | RM 4,980,339.12 | 100.0% | RM 24,196,185.53 | JANM 2019, pp. 174–175 |
Jabatan Mineral dan Geosains8 projectsEstimate RM 45.95 m · Spent RM 45.36 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10900 | Mineral Perindustrian Semenanjung Malaysia | RM 74,200,000.00 | RM 14,493,250.00 | RM 14,401,676.13 | 99.4% | RM 59,010,504.86 | JANM 2019, pp. 174–175 |
| 11000 | Kajian Geologi Marin | RM 5,000,000.00 | RM 506,750.00 | RM 506,481.08 | 100.0% | RM 506,481.08 | JANM 2019, pp. 174–175 |
| 11800 | Kajian Geobencana Negara | RM 12,000,000.00 | RM 2,300,000.00 | RM 2,268,070.83 | 98.6% | RM 9,614,683.74 | JANM 2019, pp. 174–175 |
| 11900 | Kajian Sumber Air Tanah Negara | RM 113,500,000.00 | RM 17,800,000.00 | RM 17,504,699.39 | 98.3% | RM 54,925,707.34 | JANM 2019, pp. 174–175 |
| 12100 | Pembinaan Pejabat Negeri Jabatan Mineral dan Geosains | RM 44,500,000.00 | RM 73,596.00 | RM 73,595.00 | 100.0% | RM 73,595.00 | JANM 2019, pp. 174–175 |
| 12300 | Pemulihan Tanah Bekas Lombong dan Kuari | RM 5,500,000.00 | RM 1,500,000.00 | RM 1,481,888.37 | 98.8% | RM 1,942,338.33 | JANM 2019, pp. 174–175 |
| 12500 | Pemetaan Geologi Negara | RM 79,090,000.00 | RM 7,600,000.00 | RM 7,488,034.89 | 98.5% | RM 32,713,979.97 | JANM 2019, pp. 174–175 |
| 12600 | Peningkatan Taraf dan Kemudahan Makmal Jabatan Mineral dan Geosains | RM 27,900,000.00 | RM 1,674,201.00 | RM 1,632,701.90 | 97.5% | RM 2,765,088.11 | JANM 2019, pp. 174–175 |
Pengairan dan Saliran16 projectsEstimate RM 794.02 m · Spent RM 790.91 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 13200 | Peningkatan Inovasi dan Kemajuan Teknologi | RM 44,300,000.00 | RM 11,130,000.00 | RM 11,116,529.40 | 99.9% | RM 17,040,516.57 | JANM 2019, pp. 176–177 |
| 13400 | Pembangunan Sumber Air Negara | RM 97,900,000.00 | RM 5,053,000.00 | RM 4,861,177.68 | 96.2% | RM 25,447,395.11 | JANM 2019, pp. 176–177 |
| 13500 | Pemulihan Empangan | RM 436,000,000.00 | RM 6,528,530.00 | RM 6,287,456.46 | 96.3% | RM 59,508,113.72 | JANM 2019, pp. 176–177 |
| 13600 | Jentera-jentera dan Kelengkapan | RM 54,000,000.00 | RM 6,700,000.00 | RM 6,680,843.50 | 99.7% | RM 41,512,983.81 | JANM 2019, pp. 176–177 |
| 13700 | Tanggungan-tanggungan untuk Pengambilan Tanah | RM 105,000,000.00 | RM 6,402,120.00 | RM 6,401,482.00 | 100.0% | RM 94,903,634.98 | JANM 2019, pp. 176–177 |
| 13900 | Rancangan Kawalan dan Isyarat Bahaya Banjir | RM 598,000,000.00 | RM 9,579,000.00 | RM 8,995,578.26 | 93.9% | RM 107,096,242.89 | JANM 2019, pp. 176–177 |
| 14100 | Bangunan dan Pejabat JPS | RM 6,800,000.00 | RM 522,600.00 | RM 522,563.33 | 100.0% | RM 5,623,265.05 | JANM 2019, pp. 176–177 |
| 14200 | Pemulihan Struktur | RM 45,920,000.00 | RM 8,905,560.00 | RM 8,786,897.51 | 98.7% | RM 17,728,380.08 | JANM 2019, pp. 176–177 |
| 14500 | Menaiktaraf Infrastruktur dan Saliran Bandar, Tebatan Banjir | RM 137,140,000.00 | RM 7,744,630.00 | RM 7,742,823.57 | 100.0% | RM 39,652,219.10 | JANM 2019, pp. 176–177 |
| 15000 | Kerja-kerja Kecil JPS, Pelbagai Negeri | RM 150,000,000.00 | RM 22,000,100.00 | RM 21,778,893.50 | 99.0% | RM 121,633,874.63 | JANM 2019, pp. 176–177 |
| 15100 | Mencegah Hakisan Pantai | RM 875,615,985.00 | RM 24,116,330.00 | RM 24,045,012.79 | 99.7% | RM 114,063,512.72 | JANM 2019, pp. 176–177 |
| 15200 | Memperbaiki, Mengindah, Membersih dan Merawat Air Sungai-sungai dan Infrastruktur MASMA | RM 659,680,000.00 | RM 17,656,650.00 | RM 16,968,511.16 | 96.1% | RM 106,430,368.58 | JANM 2019, pp. 176–177 |
| 15300 | Mengorek Kuala-kuala Sungai | RM 2,332,272,906.00 | RM 200,418,944.00 | RM 200,139,212.25 | 99.9% | RM 1,020,314,723.14 | JANM 2019, pp. 176–177 |
| 15400 | Rancangan Pengurusan Sungai Saliran Mesra Alam | RM 1,225,928,365.00 | RM 67,188,200.00 | RM 66,950,513.84 | 99.7% | RM 383,984,588.30 | JANM 2019, pp. 176–177 |
| 16700 | Rancangan Tebatan Banjir (RTB) dan Saliran Bandar | RM 10,111,282,125.00 | RM 396,224,690.00 | RM 395,808,532.63 | 99.9% | RM 1,698,208,988.53 | JANM 2019, pp. 176–177 |
| 16900 | Penyelidikan dan Pembangunan | RM 63,000,000.00 | RM 3,851,896.00 | RM 3,820,829.34 | 99.2% | RM 10,169,228.61 | JANM 2019, pp. 176–177 |
Projects printed without a group subtotal22 projects
These projects count toward the vote total but are not printed under a group heading.
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2019Anggaran | Spent 2019Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 17000 | NAHRIM | RM 95,544,555.16 | RM 16,500,000.00 | RM 16,290,143.86 | 98.7% | RM 60,203,395.04 | JANM 2019, pp. 176–177 |
| 17200 | Bahagian Pengurusan Biodiversiti dan Perhutanan | RM 75,514,000.00 | RM 5,227,300.00 | RM 4,560,439.73 | 87.2% | RM 39,371,782.41 | JANM 2019, pp. 176–177 |
| 17300 | Bahagian Mineral dan Geosains | RM 1,350,000.00 | RM 162,000.00 | RM 160,808.72 | 99.3% | RM 833,006.90 | JANM 2019, pp. 176–177 |
| 17500 | Pasukan Teras Biokeselamatan (PTB) | RM 3,790,000.00 | RM 625,000.00 | RM 539,765.15 | 86.4% | RM 2,849,699.04 | JANM 2019, pp. 176–177 |
| 06400 | Rancangan Bekalan Air Negeri Johor | RM 787,500,000.00 | RM 387,238.00 | RM 332,198.92 | 85.8% | RM 107,821,580.58 | JANM 2019, pp. 176–177 |
| 06500 | Rancangan Bekalan Air Negeri Kedah | RM 1,693,665,732.00 | RM 5,612,995.00 | RM 5,612,112.00 | 100.0% | RM 152,847,401.54 | JANM 2019, pp. 176–177 |
| 07400 | Rancangan Bekalan Air Negeri Melaka | RM 514,000,000.00 | RM 922,721.00 | RM 918,345.59 | 99.5% | RM 76,751,653.80 | JANM 2019, pp. 176–177 |
| 20000 | Rancangan Bekalan Air Negeri Kelantan | RM 254,043,141.19 | RM 2,563,400.00 | RM 0.00 | 0.0% | RM 64,490,834.65 | JANM 2019, pp. 176–177 |
| 21000 | Rancangan Bekalan Air Negeri Sembilan | RM 928,488,800.00 | RM 840,100.00 | RM 662,200.73 | 78.8% | RM 15,820,008.06 | JANM 2019, pp. 176–177 |
| 22000 | Rancangan Bekalan Air Negeri Pahang | RM 1,344,315,037.00 | RM 2,627,853.00 | RM 2,627,053.00 | 100.0% | RM 122,449,579.97 | JANM 2019, pp. 176–177 |
| 23000 | Rancangan Bekalan Air Negeri Perak | RM 6,000,000.00 | RM 4,511.00 | RM 4,409.60 | 97.8% | RM 4,409.60 | JANM 2019, pp. 176–177 |
| 24000 | Rancangan Bekalan Air Negeri Selangor | RM 465,797,981.00 | RM 12,435,954.00 | RM 12,435,853.00 | 100.0% | RM 182,978,534.50 | JANM 2019, pp. 176–177 |
| 25000 | Rancangan Bekalan Air Negeri Terengganu | RM 45,000,000.00 | RM 100.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2019, pp. 176–177 |
| 26000 | Rancangan Bekalan Air Negeri Pulau Pinang | RM 1,432,700,000.00 | RM 22,250,796.00 | RM 22,110,813.25 | 99.4% | RM 190,942,932.87 | JANM 2019, pp. 176–177 |
| 27000 | Rancangan Bekalan Air Labuan | RM 361,000,159.00 | RM 2,193,842.00 | RM 1,765,306.21 | 80.5% | RM 49,795,394.00 | JANM 2019, pp. 176–177 |
| 28000 | Rancangan Bekalan Air Sabah | RM 2,974,595,653.00 | RM 66,826,575.00 | RM 66,032,573.00 | 98.8% | RM 250,104,483.59 | JANM 2019, pp. 176–177 |
| 29000 | Rancangan Bekalan Air Sarawak | RM 2,214,137,482.49 | RM 58,259,431.00 | RM 45,430,415.00 | 78.0% | RM 231,704,601.00 | JANM 2019, pp. 176–177 |
| 30000 | Penyaluran Air Antara Negeri | RM 3,935,575,000.00 | RM 132,650,000.00 | RM 132,644,088.69 | 100.0% | RM 333,392,294.48 | JANM 2019, pp. 176–177 |
| 31000 | Rancangan Bekalan Air Negeri Perlis | RM 146,744,658.00 | RM 50,300.00 | RM 0.00 | 0.0% | RM 4,100,000.00 | JANM 2019, pp. 176–177 |
| 80000 | Projek Pembentungan Negara | RM 10,631,438,916.66 | RM 1,298,943,278.00 | RM 1,287,487,828.41 | 99.1% | RM 3,751,373,659.31 | JANM 2019, pp. 176–177 |
| 95000 | NRW NASIONAL | RM 1,907,271,117.76 | RM 12,166,714.00 | RM 11,166,713.87 | 91.8% | RM 21,008,674.63 | JANM 2019, pp. 176–177 |
| 96000 | Bahagian Bekalan Air | RM 63,000,000.00 | RM 455,233.00 | RM 455,133.03 | 100.0% | RM 745,543.13 | JANM 2019, pp. 176–177 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2019, Statement of Development Expenditure (Lampiran 2).