Kementerian Tenaga dan Sumber Asli

A development (P) vote: spending on this ministry's projects under the Twelfth Malaysia Plan (RMKe-12, 2021–2025). What each project was allocated and spent in 2021, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Sumber Asli dan Alam Sekitar in 2016–2017, Kementerian Air, Tanah dan Sumber Asli in 2018–2019, Kementerian Sumber Asli, Alam Sekitar dan Perubahan Iklim in 2023 and Kementerian Sumber Asli dan Kelestarian Alam in 2024–2025.

All development votes in 2021 · Operating vote B.23 · P.23 in Budget 2027

Estimate 2021Anggaran
RM 541.62 m
Spent 2021Sebenar
RM 530.11 m
97.9% of the estimate
Total cost of projectsKos Keseluruhan
RM 5.39 bn
RMKe-12 spent to dateSebenar RMKe-12
RM 530.11 m
Totals as printed, JANM 2021, pp. 206–207

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
Jabatan Ketua Pengarah Tanah dan Galian (JKPTG)RM 19.97 mRM 19.96 m
100.0%
RM 19.96 mJANM 2021, pp. 202–203
Jabatan Ukur dan Pemetaan Malaysia (JUPEM)RM 97.66 mRM 97.42 m
99.8%
RM 97.42 mJANM 2021, pp. 202–203
Institut Tanah dan Ukur Negara (instun)RM 3.81 mRM 3.81 m
100.0%
RM 3.81 mJANM 2021, pp. 202–203
Institut Penyelidikan Perhutanan Malaysia (FRIM)RM 26.57 mRM 26.57 m
100.0%
RM 26.57 mJANM 2021, pp. 202–203
Jabatan Perhutanan Semenanjung Malaysia (JPSM)RM 44.51 mRM 43.72 m
98.2%
RM 43.72 mJANM 2021, pp. 202–203
Perhutanan SarawakRM 8.97 mRM 8.58 m
95.7%
RM 8.58 mJANM 2021, pp. 204–205
Perhutanan SabahRM 29.28 mRM 29.07 m
99.3%
RM 29.07 mJANM 2021, pp. 204–205
Jumlah Perhutanan Semenanjung, Sarawak dan Sabahsums Jabatan Perhutanan Semenanjung Malaysia (JPSM), Perhutanan Sarawak, Perhutanan SabahRM 82.76 mRM 81.37 m
98.3%
RM 81.37 mJANM 2021, pp. 204–205
Jabatan Mineral dan Geosains (JMG)RM 40.83 mRM 40.21 m
98.5%
RM 40.21 mJANM 2021, pp. 204–205
Jabatan Pengairan dan Saliran (JPS)RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
Bekalan AirRM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Jabatan Ketua Pengarah Tanah dan Galian (JKPTG)4 projectsEstimate RM 19.97 m · Spent RM 19.96 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
02301Projek e-TanahRM 23,620,000.00RM 30.00RM 0.00
0.0%
RM 0.00JANM 2021, pp. 202–203
02302Sistem e-JKPTGRM 52,440,000.00RM 19,964,990.00RM 19,964,906.98
100.0%
RM 19,964,906.98JANM 2021, pp. 202–203
02303Rekabentuk Piawaian PejabatRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203
02304Bayaran Khas Pengambilan Balik TanahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203
Jabatan Ukur dan Pemetaan Malaysia (JUPEM)7 projectsEstimate RM 97.66 m · Spent RM 97.42 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
02701Sistem Pangkalan Data Geodetik (SPDG)RM 141,000,000.00RM 7,151,220.00RM 7,151,215.64
100.0%
RM 7,151,215.64JANM 2021, pp. 202–203
02703PemetaanRM 446,694,000.00RM 16,484,150.00RM 16,484,035.14
100.0%
RM 16,484,035.14JANM 2021, pp. 202–203
02801Projek Penandaan, Pengukuran dan Penyenggaraan Sempadan AntarabangsaRM 21,575,000.00RM 5,367,920.00RM 5,127,986.86
95.5%
RM 5,127,986.86JANM 2021, pp. 202–203
02803Pewujudan Sistem Pemetaan UtilitiRM 34,000,000.00RM 5,404,160.00RM 5,404,149.46
100.0%
RM 5,404,149.46JANM 2021, pp. 202–203
02804eKADASTERRM 400,903,600.00RM 43,628,290.00RM 43,628,108.51
100.0%
RM 43,628,108.51JANM 2021, pp. 202–203
02806Peningkatan Local Area Network (LAN) & Wide Area Network (WAN) JUPEMRM 60,500,000.00RM 12,839,940.00RM 12,839,825.14
100.0%
RM 12,839,825.14JANM 2021, pp. 202–203
02811Pembangunan Sistem Bahagian Geospatial Pertahanan (BGSP)RM 69,546,400.00RM 6,788,000.00RM 6,787,975.00
100.0%
RM 6,787,975.00JANM 2021, pp. 202–203
Institut Tanah dan Ukur Negara (instun)1 projectEstimate RM 3.81 m · Spent RM 3.81 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
03303Pembinaan Institut Latihan Tanah, Ukur dan Pemetaan Negara (INSTUN)RM 54,502,000.00RM 3,813,700.00RM 3,813,697.50
100.0%
RM 3,813,697.50JANM 2021, pp. 202–203
Institut Penyelidikan Perhutanan Malaysia (FRIM)2 projectsEstimate RM 26.57 m · Spent RM 26.57 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
08100Pusat Pembangunan Produk HerbaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 202–203
08510Pembangunan Penyelidikan Sumber, Pengurusan dan HasilRM 157,833,000.00RM 26,569,500.00RM 26,569,500.00
100.0%
RM 26,569,500.00JANM 2021, pp. 202–203
Jabatan Perhutanan Semenanjung Malaysia (JPSM)3 projectsEstimate RM 44.51 m · Spent RM 43.72 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
08600Pengurusan Hutan Secara Berkekalan (JPSM)RM 298,561,000.00RM 28,654,230.00RM 27,868,972.56
97.3%
RM 27,868,972.56JANM 2021, pp. 202–203
08601Penanaman Pokok Bakau dan Spesies-spesies Yang Sesuai di Persisiran Pantai (JPSM)RM 13,000,000.00RM 8,302,900.00RM 8,294,696.13
99.9%
RM 8,294,696.13JANM 2021, pp. 202–203
09200Pengembangan Maklumat Perhutanan dan IT dan K-Perhutanan (JPSM)RM 13,000,000.00RM 7,553,550.00RM 7,553,546.19
100.0%
RM 7,553,546.19JANM 2021, pp. 202–203
Perhutanan Sarawak2 projectsEstimate RM 8.97 m · Spent RM 8.58 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
09900Projek Kemajuan Perusahaan Hutan Sistem Maklumat Bersepadu Perhutanan SarawakRM 134,690,000.00RM 8,158,800.00RM 7,787,538.21
95.5%
RM 7,787,538.21JANM 2021, pp. 204–205
10100Pemuliharaan Hidupan Liar dan Projek Kerjasama Antarabangsa PerhutananRM 9,100,000.00RM 808,400.00RM 795,313.06
98.4%
RM 795,313.06JANM 2021, pp. 204–205
Perhutanan Sabah8 projectsEstimate RM 29.28 m · Spent RM 29.07 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
10200Penubuhan Stesen Hutan Sejadi Sabah Pusat Perhutanan Bersepadu Wilayah K.KinabaluRM 8,000,000.00RM 1,300,000.00RM 1,288,699.68
99.1%
RM 1,288,699.68JANM 2021, pp. 204–205
10300Pembangunan Teknologi Penggunaan Kayu Latihan Pencegahan Kebakaran HutanRM 8,255,000.00RM 1,200,000.00RM 1,096,448.00
91.4%
RM 1,096,448.00JANM 2021, pp. 204–205
10400Perancangan dan Pengurusan HutanRM 26,206,917.00RM 7,732,000.00RM 7,725,154.66
99.9%
RM 7,725,154.66JANM 2021, pp. 204–205
10500Pembangunan Infrastruktur Penyelidikan PerhutananRM 5,000,000.00RM 600,000.00RM 529,866.49
88.3%
RM 529,866.49JANM 2021, pp. 204–205
10800Pembangunan Kawasan Penyelidikan Hutan Paya Gambut Klias Galeri Perhutanan dan Penubuhan Seed Orchard serta Spesis TempatanRM 7,724,000.00RM 400,100.00RM 399,999.38
100.0%
RM 399,999.38JANM 2021, pp. 204–205
10801Program Sokongan dan Pembangunan Penyelidikan PerhutananRM 11,190,000.00RM 2,323,970.00RM 2,317,192.90
99.7%
RM 2,317,192.90JANM 2021, pp. 204–205
10803Program Pembangunan Mampan Sumber Hutan SabahRM 70,070,608.00RM 10,513,600.00RM 10,502,990.60
99.9%
RM 10,502,990.60JANM 2021, pp. 204–205
10804Projek Heart of Borneo (HOB) Negeri SabahRM 41,567,000.00RM 5,210,000.00RM 5,208,168.84
100.0%
RM 5,208,168.84JANM 2021, pp. 204–205
Jabatan Mineral dan Geosains (JMG)10 projectsEstimate RM 40.83 m · Spent RM 40.21 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
10900Mineral Perindustrian Semenanjung MalaysiaRM 89,200,000.00RM 7,092,100.00RM 6,914,418.21
97.5%
RM 6,914,418.21JANM 2021, pp. 204–205
11000Survey Geologi MarinRM 10,000,000.00RM 1,000,000.00RM 986,751.61
98.7%
RM 986,751.61JANM 2021, pp. 204–205
11200Penyelidikan dan Pembangunan (R&D) Pengusahahasilan dan Pemprosesan MineralRM 5,000,000.00RM 500,000.00RM 499,996.16
100.0%
RM 499,996.16JANM 2021, pp. 204–205
11700Sistem Maklumat MineralRM 9,000,000.00RM 598,000.00RM 597,715.56
100.0%
RM 597,715.56JANM 2021, pp. 204–205
11800Kajian Geobencana NegaraRM 12,000,000.00RM 221,900.00RM 218,890.29
98.6%
RM 218,890.29JANM 2021, pp. 204–205
11900Kajian Sumber Air Tanah NegaraRM 129,500,000.00RM 12,106,210.00RM 11,832,521.54
97.7%
RM 11,832,521.54JANM 2021, pp. 204–205
12100Pembinaan Pejabat Negeri Jabatan Mineral dan GeosainsRM 49,850,000.00RM 2,861,800.00RM 2,861,799.60
100.0%
RM 2,861,799.60JANM 2021, pp. 204–205
12300Pemulihan Tanah Bekas Lombong dan KuariRM 5,000,000.00RM 730,000.00RM 726,168.27
99.5%
RM 726,168.27JANM 2021, pp. 204–205
12500Pemetaan Geologi NegaraRM 37,200,000.00RM 7,259,130.00RM 7,232,559.82
99.6%
RM 7,232,559.82JANM 2021, pp. 204–205
12600Peningkatan Taraf dan Kemudahan Makmal Jabatan Mineral dan GeosainsRM 30,900,000.00RM 8,457,330.00RM 8,336,050.56
98.6%
RM 8,336,050.56JANM 2021, pp. 204–205
Jabatan Pengairan dan Saliran (JPS)17 projectsEstimate RM 0.00 · Spent RM 0.00
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
13200Peningkatan Inovasi dan Kemajuan TeknologiRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
13400Pembangunan Sumber Air NegaraRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
13500Pemulihan EmpanganRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
13600Jentera-jentera dan KelengkapanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
13700Tanggungan-tanggungan untuk Pengambilan TanahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
13900Rancangan Kawalan dan Isyarat Bahaya BanjirRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
14100Bangunan dan Pejabat JPSRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
14200Pemulihan StrukturRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
14500Menaiktaraf Infrastruktur dan Saliran Bandar, Tebatan BanjirRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
14600Kajian Pra KemungkinanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
15000Kerja-kerja Kecil JPS, Pelbagai NegeriRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
15100Mencegah Hakisan PantaiRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
15200Memperbaiki, Mengindah, Membersih dan Merawat Air Sungai-sungai dan Infrastruktur MASMARM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
15300Mengorek Kuala-kuala SungaiRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
15400Rancangan Pengurusan Sungai Saliran Mesra AlamRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
16700Rancangan Tebatan Banjir (RTB) dan Saliran BandarRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
16900Penyelidikan dan PembangunanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
Projects printed without a group subtotal2 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
17000NAHRIMRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
17500Pasukan Teras Biokeselamatan (PTB)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
Bekalan Air16 projectsEstimate RM 0.00 · Spent RM 0.00
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
06400Rancangan Bekalan Air Negeri JohorRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
06500Rancangan Bekalan Air Negeri KedahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
07400Rancangan Bekalan Air Negeri MelakaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
09400Rancangan Bekalan Air Negeri TerengganuRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
20000Rancangan Bekalan Air Negeri KelantanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
21000Rancangan Bekalan Air Negeri SembilanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
22000Rancangan Bekalan Air Negeri PahangRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
23000Rancangan Bekalan Air Negeri PerakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
24000Rancangan Bekalan Air Negeri SelangorRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 204–205
25000Rancangan Bekalan Air Negeri TerengganuRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
26000Rancangan Bekalan Air Negeri Pulau PinangRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
27000Rancangan Bekalan Air LabuanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
28000Rancangan Bekalan Air SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
29000Rancangan Bekalan Air SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
30000Penyaluran Air Antara NegeriRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
31000Rancangan Bekalan Air Negeri PerlisRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
Projects printed without a group subtotal11 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2021AnggaranSpent 2021Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
03302Kemudahan Pengurusan Kementerian (BTM)RM 200,659,500.00RM 34,569,910.00RM 34,569,895.28
100.0%
RM 34,569,895.28JANM 2021, pp. 206–207
03304Infrastruktur Data Geospatial Negara (MaCGDI)RM 32,147,600.00RM 143,100.00RM 143,100.00
100.0%
RM 143,100.00JANM 2021, pp. 206–207
07100PERHILITANRM 381,993,726.00RM 32,258,398.00RM 32,234,484.86
99.9%
RM 32,234,484.86JANM 2021, pp. 206–207
17200Bahagian Pengurusan Biodiversiti dan PerhutananRM 50,564,000.00RM 4,409,772.00RM 4,404,942.72
99.9%
RM 4,404,942.72JANM 2021, pp. 206–207
17300Bahagian Mineral dan GeosainsRM 1,350,000.00RM 80,200.00RM 80,200.00
100.0%
RM 80,200.00JANM 2021, pp. 206–207
40000Program Kecekapan Tenaga dan Tenaga DiperbaharuiRM 86,734,000.00RM 5,088,700.00RM 5,088,700.00
100.0%
RM 5,088,700.00JANM 2021, pp. 206–207
41000Sabah Electricity Sdn. Bhd. (SESB)RM 2,145,547,849.00RM 193,473,570.00RM 184,240,060.36
95.2%
RM 184,240,060.36JANM 2021, pp. 206–207
80000Projek Pembentungan NegaraRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
95000NRW NASIONALRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
96000Bahagian Bekalan AirRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207
97000PPP/PFI - Sewaan BangunanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2021, pp. 206–207

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2021, Statement of Development Expenditure (Lampiran 2).