A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2017, from the audited Statement of Development Expenditure.

Estimate 2017Anggaran
RM 5.10 bn
Spent 2017Sebenar
RM 5.09 bn
99.8% of the estimate; RM 1.61 bn loan-funded
Total cost of projectsKos Keseluruhan
RM 42.19 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 8.87 bn
Totals as printed, JANM 2017, pp. 222–223

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
Jalan Raya dan Jambatan SemenanjungRM 4.28 bnRM 4.27 bn
99.9%
RM 7.18 bnJANM 2017, pp. 222–223
SabahRM 434.12 mRM 433.51 m
99.9%
RM 932.77 mJANM 2017, pp. 222–223
SarawakRM 382.84 mRM 378.91 m
99.0%
RM 713.79 mJANM 2017, pp. 222–223
LabuanRM 2.98 mRM 2.98 m
100.0%
RM 21.92 mJANM 2017, pp. 222–223
Jumlah Jalan Raya dan Jambatan Semenanjung, Sarawak, Sabah dan Labuansums Jalan Raya dan Jambatan Semenanjung, Sabah, Sarawak, LabuanRM 5.10 bnRM 5.09 bn
99.8%
RM 8.85 bnJANM 2017, pp. 222–223
BANGUNAN-BANGUNAN KERAJAAN (Selain daripada Perumahan)RM 52,246.00RM 52,245.88
100.0%
RM 52,245.88JANM 2017, pp. 222–223
Kuari, Jentera, Workshop dan Stor Kerja RayaRM 0.00RM 0.00RM 6,359.80JANM 2017, pp. 222–223
Perumahan KerajaanRM 167,106.00RM 167,106.00
100.0%
RM 167,106.00JANM 2017, pp. 222–223

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Jalan Raya dan Jambatan Semenanjung17 projectsEstimate RM 4.28 bn · Spent RM 4.27 bn
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
00700Pembinaan Lain-Lain Jalan Persekutuan dan JambatanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 1,922,941,304.00RM 339,984,622.00RM 339,666,943.85
99.9%
RM 449,056,808.48JANM 2017, pp. 222–223
02800Memperbaiki, Mengganti dan Menaikkan Taraf Jalan dan JambatanRM 364,982,000.00RM 5,784,666.00RM 5,725,840.72
99.0%
RM 5,811,130.02JANM 2017, pp. 222–223
10001Projek Penswastaan Jalan Raya (PBT)RM 487,693,061.00RM 0.00RM 0.00RM 23,679,096.02JANM 2017, pp. 222–223
19000Penyelidikan dan Pembangunan KejuruteraanRM 574,530,432.00RM 80,936,375.00RM 80,785,448.95
99.8%
RM 124,738,930.58JANM 2017, pp. 222–223
20000Membina Persimpangan Bertingkat dan JejambatNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 350,744,000.00RM 56,697,718.00RM 56,689,969.25
100.0%
RM 132,032,440.56JANM 2017, pp. 222–223
21000Membina Persimpangan Bertingkat (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 1,060,689,702.00RM 91,790,928.00RM 91,790,926.98
100.0%
RM 177,348,095.95JANM 2017, pp. 222–223
31000Pembinaan Jalan dan Jambatan (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 1,786,552,164.00RM 190,820,400.00RM 190,792,900.38
100.0%
RM 310,570,920.24JANM 2017, pp. 222–223
41000Kajian Kemungkinan Jalan (Projek Baru)RM 12,850,000.00RM 3,422,447.00RM 3,344,860.50
97.7%
RM 4,615,064.93JANM 2017, pp. 222–223
51000Pelbagai Pembinaan (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 654,430,000.00RM 119,975,377.00RM 119,032,760.93
99.2%
RM 176,585,169.81JANM 2017, pp. 222–223
60000Naik Taraf Jalanraya dan LaluanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 4,537,448,660.00RM 351,589,548.00RM 351,588,270.67
100.0%
RM 863,703,526.96JANM 2017, pp. 222–223
61000Naik Taraf Jalan-jalan (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 8,109,106,014.28RM 619,751,158.00RM 619,129,393.26
99.9%
RM 1,192,631,332.64JANM 2017, pp. 222–223
70000Projek Memperelok Jalan-jalanRM 49,000,000.00RM 0.00RM 0.00RM 0.00JANM 2017, pp. 222–223
71000Memperelok dan Membaikpulih Jalan (Projek Baru)RM 562,560,411.00RM 72,981,575.00RM 71,892,781.61
98.5%
RM 140,595,552.78JANM 2017, pp. 222–223
80000Membina Jalan-jalan BaruNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 909,178,049.00RM 98,945,930.00RM 98,944,450.45
100.0%
RM 207,369,579.56JANM 2017, pp. 222–223
81000Membina Jalan-jalan Baru (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 12,856,041,628.00RM 2,185,340,758.00RM 2,184,497,709.11
100.0%
RM 3,208,455,014.21JANM 2017, pp. 222–223
89000Pengambilan Balik Tanah Untuk Projek-Projek Jalan /JambatanRM 97,431,906.00RM 215,501.00RM 215,462.35
100.0%
RM 2,244,725.91JANM 2017, pp. 222–223
90000Lain-lain PembinaanRM 285,423,800.00RM 57,718,775.00RM 57,718,413.73
100.0%
RM 159,763,115.35JANM 2017, pp. 222–223
Sabah8 projectsEstimate RM 434.12 m · Spent RM 433.51 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
05100Jalan-Jalan Besar di SabahNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 380,000,000.00RM 137,561,393.00RM 137,457,585.60
99.9%
RM 200,915,717.51JANM 2017, pp. 222–223
08230Pembinaan JambatanRM 57,500,000.00RM 2,128,055.00RM 2,041,684.63
95.9%
RM 2,330,833.60JANM 2017, pp. 222–223
08250Kajian Perlindungan/Pembaikan Cerun-cerunRM 209,970,000.00RM 55,710,810.00RM 55,710,595.84
100.0%
RM 106,160,730.73JANM 2017, pp. 222–223
08260Naik Taraf dan Memulihkan JalanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 1,340,433,153.00RM 79,282,684.00RM 79,015,979.87
99.7%
RM 294,055,862.98JANM 2017, pp. 222–223
08270Memulihkan JalanRM 91,954,094.00RM 222,744.00RM 222,743.27
100.0%
RM 11,312,870.53JANM 2017, pp. 222–223
08280Pembinaan Jalan-jalan (I)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 1,121,328,797.00RM 157,474,543.00RM 157,316,770.76
99.9%
RM 314,634,902.52JANM 2017, pp. 222–223
08500Projek Keselamatan JalanRM 47,908,000.00RM 0.00RM 0.00RM 656,880.80JANM 2017, pp. 222–223
08600Naik Taraf Jalan RayaRM 726,100,000.00RM 1,742,558.00RM 1,742,556.73
100.0%
RM 2,706,817.21JANM 2017, pp. 222–223
Sarawak3 projectsEstimate RM 382.84 m · Spent RM 378.91 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
09230Jambatan-jambatanRM 1,133,490,000.00RM 19,439,194.00RM 19,246,749.87
99.0%
RM 58,830,020.77JANM 2017, pp. 222–223
09260Naik Taraf Jalan (II)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 1,171,760,114.00RM 304,421,456.00RM 304,376,422.29
100.0%
RM 520,056,588.60JANM 2017, pp. 222–223
09280Membina Jalan-jalan secara PPPRM 1,076,215,573.00RM 58,977,823.00RM 55,288,208.49
93.7%
RM 134,902,540.95JANM 2017, pp. 222–223
Labuan1 projectEstimate RM 2.98 m · Spent RM 2.98 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
19180Pembinaan JalanRM 38,203,943.10RM 2,976,530.00RM 2,976,526.98
100.0%
RM 21,917,465.81JANM 2017, pp. 222–223
BANGUNAN-BANGUNAN KERAJAAN (Selain daripada Perumahan)1 projectEstimate RM 52,246.00 · Spent RM 52,245.88
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
11802SarawakNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 1,675,000.00RM 52,246.00RM 52,245.88
100.0%
RM 52,245.88JANM 2017, pp. 222–223
Kuari, Jentera, Workshop dan Stor Kerja Raya1 projectEstimate RM 0.00 · Spent RM 0.00
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
16001KuariRM 14,903,097.00RM 0.00RM 0.00RM 6,359.80JANM 2017, pp. 222–223
Perumahan Kerajaan1 projectEstimate RM 167,106.00 · Spent RM 167,106.00
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
18102SarawakNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan.RM 4,950,000.00RM 167,106.00RM 167,106.00
100.0%
RM 167,106.00JANM 2017, pp. 222–223
Projects printed without a group subtotal2 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2017AnggaranSpent 2017Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
18610Komputer Kementerian Kerja RayaRM 39,000,000.00RM 0.00RM 0.00RM 3,259,361.73JANM 2017, pp. 222–223
18640Projek ICT Jabatan Kerja RayaRM 111,385,755.00RM 0.00RM 0.00RM 19,222,924.52JANM 2017, pp. 222–223

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2017, Statement of Development Expenditure (Lampiran 2).