Kementerian Kerja Raya
A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2017, from the audited Statement of Development Expenditure.
Estimate 2017Anggaran
RM 5.10 bn
Spent 2017Sebenar
RM 5.09 bn
99.8% of the estimate; RM 1.61 bn loan-funded
Total cost of projectsKos Keseluruhan
RM 42.19 bn
By group
The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.
| Group | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|
| Jalan Raya dan Jambatan Semenanjung | RM 4.28 bn | RM 4.27 bn | 99.9% | RM 7.18 bn | JANM 2017, pp. 222–223 |
| Sabah | RM 434.12 m | RM 433.51 m | 99.9% | RM 932.77 m | JANM 2017, pp. 222–223 |
| Sarawak | RM 382.84 m | RM 378.91 m | 99.0% | RM 713.79 m | JANM 2017, pp. 222–223 |
| Labuan | RM 2.98 m | RM 2.98 m | 100.0% | RM 21.92 m | JANM 2017, pp. 222–223 |
| Jumlah Jalan Raya dan Jambatan Semenanjung, Sarawak, Sabah dan Labuansums Jalan Raya dan Jambatan Semenanjung, Sabah, Sarawak, Labuan | RM 5.10 bn | RM 5.09 bn | 99.8% | RM 8.85 bn | JANM 2017, pp. 222–223 |
| BANGUNAN-BANGUNAN KERAJAAN (Selain daripada Perumahan) | RM 52,246.00 | RM 52,245.88 | 100.0% | RM 52,245.88 | JANM 2017, pp. 222–223 |
| Kuari, Jentera, Workshop dan Stor Kerja Raya | RM 0.00 | RM 0.00 | RM 6,359.80 | JANM 2017, pp. 222–223 | |
| Perumahan Kerajaan | RM 167,106.00 | RM 167,106.00 | 100.0% | RM 167,106.00 | JANM 2017, pp. 222–223 |
Every project
Each project exactly as printed, to the sen, with the two-page spread it was read from.
Jalan Raya dan Jambatan Semenanjung17 projectsEstimate RM 4.28 bn · Spent RM 4.27 bn
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 00700 | Pembinaan Lain-Lain Jalan Persekutuan dan JambatanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 1,922,941,304.00 | RM 339,984,622.00 | RM 339,666,943.85 | 99.9% | RM 449,056,808.48 | JANM 2017, pp. 222–223 |
| 02800 | Memperbaiki, Mengganti dan Menaikkan Taraf Jalan dan Jambatan | RM 364,982,000.00 | RM 5,784,666.00 | RM 5,725,840.72 | 99.0% | RM 5,811,130.02 | JANM 2017, pp. 222–223 |
| 10001 | Projek Penswastaan Jalan Raya (PBT) | RM 487,693,061.00 | RM 0.00 | RM 0.00 | RM 23,679,096.02 | JANM 2017, pp. 222–223 | |
| 19000 | Penyelidikan dan Pembangunan Kejuruteraan | RM 574,530,432.00 | RM 80,936,375.00 | RM 80,785,448.95 | 99.8% | RM 124,738,930.58 | JANM 2017, pp. 222–223 |
| 20000 | Membina Persimpangan Bertingkat dan JejambatNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 350,744,000.00 | RM 56,697,718.00 | RM 56,689,969.25 | 100.0% | RM 132,032,440.56 | JANM 2017, pp. 222–223 |
| 21000 | Membina Persimpangan Bertingkat (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 1,060,689,702.00 | RM 91,790,928.00 | RM 91,790,926.98 | 100.0% | RM 177,348,095.95 | JANM 2017, pp. 222–223 |
| 31000 | Pembinaan Jalan dan Jambatan (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 1,786,552,164.00 | RM 190,820,400.00 | RM 190,792,900.38 | 100.0% | RM 310,570,920.24 | JANM 2017, pp. 222–223 |
| 41000 | Kajian Kemungkinan Jalan (Projek Baru) | RM 12,850,000.00 | RM 3,422,447.00 | RM 3,344,860.50 | 97.7% | RM 4,615,064.93 | JANM 2017, pp. 222–223 |
| 51000 | Pelbagai Pembinaan (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 654,430,000.00 | RM 119,975,377.00 | RM 119,032,760.93 | 99.2% | RM 176,585,169.81 | JANM 2017, pp. 222–223 |
| 60000 | Naik Taraf Jalanraya dan LaluanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 4,537,448,660.00 | RM 351,589,548.00 | RM 351,588,270.67 | 100.0% | RM 863,703,526.96 | JANM 2017, pp. 222–223 |
| 61000 | Naik Taraf Jalan-jalan (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 8,109,106,014.28 | RM 619,751,158.00 | RM 619,129,393.26 | 99.9% | RM 1,192,631,332.64 | JANM 2017, pp. 222–223 |
| 70000 | Projek Memperelok Jalan-jalan | RM 49,000,000.00 | RM 0.00 | RM 0.00 | RM 0.00 | JANM 2017, pp. 222–223 | |
| 71000 | Memperelok dan Membaikpulih Jalan (Projek Baru) | RM 562,560,411.00 | RM 72,981,575.00 | RM 71,892,781.61 | 98.5% | RM 140,595,552.78 | JANM 2017, pp. 222–223 |
| 80000 | Membina Jalan-jalan BaruNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 909,178,049.00 | RM 98,945,930.00 | RM 98,944,450.45 | 100.0% | RM 207,369,579.56 | JANM 2017, pp. 222–223 |
| 81000 | Membina Jalan-jalan Baru (Projek Baru)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 12,856,041,628.00 | RM 2,185,340,758.00 | RM 2,184,497,709.11 | 100.0% | RM 3,208,455,014.21 | JANM 2017, pp. 222–223 |
| 89000 | Pengambilan Balik Tanah Untuk Projek-Projek Jalan /Jambatan | RM 97,431,906.00 | RM 215,501.00 | RM 215,462.35 | 100.0% | RM 2,244,725.91 | JANM 2017, pp. 222–223 |
| 90000 | Lain-lain Pembinaan | RM 285,423,800.00 | RM 57,718,775.00 | RM 57,718,413.73 | 100.0% | RM 159,763,115.35 | JANM 2017, pp. 222–223 |
Sabah8 projectsEstimate RM 434.12 m · Spent RM 433.51 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 05100 | Jalan-Jalan Besar di SabahNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 380,000,000.00 | RM 137,561,393.00 | RM 137,457,585.60 | 99.9% | RM 200,915,717.51 | JANM 2017, pp. 222–223 |
| 08230 | Pembinaan Jambatan | RM 57,500,000.00 | RM 2,128,055.00 | RM 2,041,684.63 | 95.9% | RM 2,330,833.60 | JANM 2017, pp. 222–223 |
| 08250 | Kajian Perlindungan/Pembaikan Cerun-cerun | RM 209,970,000.00 | RM 55,710,810.00 | RM 55,710,595.84 | 100.0% | RM 106,160,730.73 | JANM 2017, pp. 222–223 |
| 08260 | Naik Taraf dan Memulihkan JalanNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 1,340,433,153.00 | RM 79,282,684.00 | RM 79,015,979.87 | 99.7% | RM 294,055,862.98 | JANM 2017, pp. 222–223 |
| 08270 | Memulihkan Jalan | RM 91,954,094.00 | RM 222,744.00 | RM 222,743.27 | 100.0% | RM 11,312,870.53 | JANM 2017, pp. 222–223 |
| 08280 | Pembinaan Jalan-jalan (I)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 1,121,328,797.00 | RM 157,474,543.00 | RM 157,316,770.76 | 99.9% | RM 314,634,902.52 | JANM 2017, pp. 222–223 |
| 08500 | Projek Keselamatan Jalan | RM 47,908,000.00 | RM 0.00 | RM 0.00 | RM 656,880.80 | JANM 2017, pp. 222–223 | |
| 08600 | Naik Taraf Jalan Raya | RM 726,100,000.00 | RM 1,742,558.00 | RM 1,742,556.73 | 100.0% | RM 2,706,817.21 | JANM 2017, pp. 222–223 |
Sarawak3 projectsEstimate RM 382.84 m · Spent RM 378.91 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 09230 | Jambatan-jambatan | RM 1,133,490,000.00 | RM 19,439,194.00 | RM 19,246,749.87 | 99.0% | RM 58,830,020.77 | JANM 2017, pp. 222–223 |
| 09260 | Naik Taraf Jalan (II)Note: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 1,171,760,114.00 | RM 304,421,456.00 | RM 304,376,422.29 | 100.0% | RM 520,056,588.60 | JANM 2017, pp. 222–223 |
| 09280 | Membina Jalan-jalan secara PPP | RM 1,076,215,573.00 | RM 58,977,823.00 | RM 55,288,208.49 | 93.7% | RM 134,902,540.95 | JANM 2017, pp. 222–223 |
Labuan1 projectEstimate RM 2.98 m · Spent RM 2.98 m
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 19180 | Pembinaan Jalan | RM 38,203,943.10 | RM 2,976,530.00 | RM 2,976,526.98 | 100.0% | RM 21,917,465.81 | JANM 2017, pp. 222–223 |
BANGUNAN-BANGUNAN KERAJAAN (Selain daripada Perumahan)1 projectEstimate RM 52,246.00 · Spent RM 52,245.88
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 11802 | SarawakNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 1,675,000.00 | RM 52,246.00 | RM 52,245.88 | 100.0% | RM 52,245.88 | JANM 2017, pp. 222–223 |
Kuari, Jentera, Workshop dan Stor Kerja Raya1 projectEstimate RM 0.00 · Spent RM 0.00
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 16001 | Kuari | RM 14,903,097.00 | RM 0.00 | RM 0.00 | RM 6,359.80 | JANM 2017, pp. 222–223 |
Perumahan Kerajaan1 projectEstimate RM 167,106.00 · Spent RM 167,106.00
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 18102 | SarawakNote: P.27 – Butiran 00700, 05100, 08260, 08280, 09260, 11802, 18102, 20000, 21000, 31000, 51000, 60000, 61000, 80000 dan 81000 - Peruntukan sebanyak RM50,000,000 , RM 20,000,000 , RM 10,000,0000 , RM 25,000,000, RM 50,000,000 , RM 10 , RM 10, RM 10,000,000 , RM 20,000,000, RM 30,000,000 ,RM 20,000,000 , RM 80,000,000 , RM 115,000,000 , RM 20,000,000 dan RM 150,000,000 yang akan dibentangkan dalam Sesi Parlimen 2018 telah dimasuk kira sebagai pendahuluan. | RM 4,950,000.00 | RM 167,106.00 | RM 167,106.00 | 100.0% | RM 167,106.00 | JANM 2017, pp. 222–223 |
Projects printed without a group subtotal2 projects
These projects count toward the vote total but are not printed under a group heading.
| CodeKod | ProjectMaksud Perbelanjaan | Total costKos Keseluruhan | Estimate 2017Anggaran | Spent 2017Sebenar | % usedPrestasi | RMKe-11 to dateSebenar RMKe-11 | SourceSumber |
|---|---|---|---|---|---|---|---|
| 18610 | Komputer Kementerian Kerja Raya | RM 39,000,000.00 | RM 0.00 | RM 0.00 | RM 3,259,361.73 | JANM 2017, pp. 222–223 | |
| 18640 | Projek ICT Jabatan Kerja Raya | RM 111,385,755.00 | RM 0.00 | RM 0.00 | RM 19,222,924.52 | JANM 2017, pp. 222–223 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2017, Statement of Development Expenditure (Lampiran 2).